Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 9349 dokumen yang sesuai dengan query
cover
Barber, Daniel
"A House in the Sun describes experiments in solar house heating in American architectural, engineering, political, economic, and corporate contexts from the beginning of World War II until the late 1950s. Solar houses were built across the United States, and also proposed for sites in India, South Africa, and Morocco. These experiments developed parallel to transformations in the discussion of modern architecture, relying on new materials and design ideas for both energy efficiency and claims to cultural relevance. These experiments also developed as part of a wider analysis of the globe as an interconnected geophysical system. Perceived resource limitations in the immediate postwar period led to new understandings of the relationships among energy, technology, and economy. The solar house, both as a charged object in the milieu of suburban expansion, and as a means to raise the standard of living in developing economies, became an important site for social, technological, and design experimentation. A House in the Sun argues that this mid-century solar discourse was one of the first episodes in which resource limitations were seen as an opportunity for design to attain new relevance. Furthermore, discussion of and experimentation in solar technology established both an intellectual framework and a funding structure for the articulation of global environmental concerns in subsequent decades. In presenting evidence of resource tensions at the beginning of the Cold War, the book presents a new perspective on the histories of architecture, technology, and environmentalism, one more fully engaged with geopolitical and geophysical pressures."
Oxford: Oxford University Press, 2016
e20470067
eBooks  Universitas Indonesia Library
cover
Farah Shabila Dinniyah
"Saat ini, banyak aplikasi teknologi berbasis sumber energi alam dan ramah lingkungan. Bagaimanapun, kekurangan yang sering ditemukan pada sumber energi alam adalah intensitasnya yang tidak menentu. Hal ini juga berlaku pada tenaga matahari pada panel surya, dimana intensitas cahaya yang masuk tidak selalu sama di setiap waktu. Intensitas cahaya dapat dipengaruhi berbagai faktor seperti cuaca yang mendung. Perubahan intensitas cahaya ini berujung pada perubahan besar tegangan yang dihasilkan panel surya. Dengan buck-boost converter, nilai tegangan keluaran dapat diatur menjadi lebih besar atau lebih kecil, menjadi nilai tegangan yang diinginkan. Nilai tegangan yang dihasilkan diatur oleh pemrograman mikrokontroler, yang mengatur lebar pulsa pada PWM. Laporan skripsi ini membahas perancangan buck-boost converter untuk panel surya, dengan mengambil studi kasus di Gedung Pusat Inovasi LIPI di Cibinong, Bogor. Regulasi tegangan keluaran yang dihasilkan merupakan faktor utama dari analisa keberhasilan perancangan buck-boost converter, dengan persentase efisiensi berkisar dari 90 hingga 99%.

Currently, there are plenty of technological applications that utilizes a natural, environmental-friendly source of energy. However, a disadvantage often found in natural energy sources is that the intensity produced is uncertain. This occurance is also found in solar panels, wherein the light intensity that enters is not always equal. Light intensity may be affected by various factors such as ones on gloomy or sunny weathers. This irregularity on light intensity leads to deviation of voltage output produced by the solar panel. With the use of buck-boost converters, the amount of output voltage may be set to higher or lower than the input voltage, enabling us to maintain the desired output voltage. The amount of output voltage produced is controlled by a microcontroller program which regulates pulse widths produced by PWM signals. This final project report discusses about the designing of a buck-boost converter for solar panels, with a case study in Gedung Pusat Inovasi LIPI, Cibinong, Bogor. The regulation of output voltage is the main aim in analizing the success of the design created, with an efficiency of 90 to 99%.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
S63924
UI - Skripsi Membership  Universitas Indonesia Library
cover
Grenon, Michel
Oxford ; New York : Pergamon Press, 1981
333.792 GRE n
Buku Teks  Universitas Indonesia Library
cover
Purba, Ester Nugraheny Natalia
"Salah satu permasalahan yang terdapat dalam pemenuhan energi adalah masih banyaknya daerah yang belum teraliri listrik. Padahal listrik adalah faktor penting untuk mengembangkan potensi ekonomi suatu daerah. Indonesia sebagai negara tropis memiliki banyak potensi energi terbarukan, salah satunya adalah tenaga surya. Dengan penggunaan PLTS sebagai sumber daya listrik, permukiman nelayan di Desa Arungkeke dapat menikmati energi listrik secara mandiri (off grid) tanpa memerlukan bahan bakar dan mesin pembangkit. Pemenuhan kebutuhan energi dipasok oleh PLTS dengan spesifikasi kapasitas 160 Wp sebanyak 46 unit dengan harga Rp 125.120.000,00, baterai tipe 1500 Ah dengan jumlah kebutuhan 2 buah baterai dengan total harga Rp 19.576.000,00, serta konverter seharga Rp 3.334.000,00. Sehingga total biaya yang dibutuhkan sebesar Rp 148.030.000,00.

One of the main problem in energy demand fulfillment is still no electricity in many regions. Whereas, electricity is the main factor for developing a city, or in this case is economy sector. Indonesia is a tropical country which has may potentional renewable energy, for example is solar power. By using solar power plant as power generation can make people in Arungkeke?s Village have access to electricity without fuel engine and off grid. The electricity will be provided by solar power plant with the specifications are: 46 units 160 Wp solar panel Rp 125.120.000,00, 2 batteries 1500 Ah Rp 19.576.000,00, and converter Rp 3.334.000,00. So the total amount is Rp 148.030.000,00."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S64371
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ndaru Setyawan
"Penerangan Jalan Umum (PJU) merupakan prasarana publik yang dibutuhkan khususnya malam hari. Agar efisien dalam pengoperasian dan pengawasan, maka sistem lampu jalan pintar dirancang dapat menyesuaikan keadaan lingkungan sekitar dan terdapat sistem monitoring. Dalam penelitian ini penulis membuat sistem lampu jalan pintar berbasis mikrokontroler yang dapat menyala secara otomatis pada malam hari, keadaan gelap, dan dapat dikendalikan oleh server. Lampu pada sistem ini hanya menyala dengan terang apabila terdapat gerakan manusia di sekitar lampu jalan untuk menghemat energi. Selain tenaga surya, sistem memiliki sumber cadangan PLN. Sistem ini dapat memilih secara otomatis sumber daya mana yang harus digunakan berdasarkan level tegangan baterai. Dari hasil pengujian, sensor gerak dapat mendeteksi gerakan hingga jangkauan jarak 12 meter pada sudut 90°. Rata-rata kesalahan pada sensor arus sebesar 1,32 ± 2,75 % sedangkan pada sensor tegangan sebesar 4,73 ± 12,61 %. Sistem dapat mengirimkan data melalui komunikasi serial mengenai level tegangan baterai, arus dan tegangan pada lampu, status nyala lampu, waktu, tanggal, sumber daya yang sedang digunakan, serta peringatan apabila terjadi kerusakan pada lampu.
Street light is public infrastructure that needed in the evening. To reach efficiency of operation and monitoring, so street light system is designed to adapt with environment condition and monitoring system. This research design smart street light system based on microcontroller that can turn on automatically in the evening, in the dark, and controlled by server. The lamp only reach its maximum brightness if the motion detector sensing object to save energy. Except solar power, this system using back up power which is PLN. This system can choose automatically which resources should be used based on the level of battery voltages. By testing this system obtained motion detector can detect maximum range 12 meters at 90°. Error tolerance of current sensor is 1,32 ± 2,75 % and voltage sensor is 4,73 ± 12,61 %. The system can transmit data through the serial communication about the level of battery voltages, current and the voltage at the lamp, lamp state, time, date, resources are being used, and send a warning if the lamp is broken."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S57178
UI - Skripsi Membership  Universitas Indonesia Library
cover
Howell, John R.
New York : McGraw-Hill, 1982.
621.47 HOW s
Buku Teks  Universitas Indonesia Library
cover
Daffa Aryo Utomo Sudranto
"Secara letak geografis, Indonesia terletak tepat pada garis ekuatorial sehingga paparan sinar mataharinya memiliki intensitas yang optimal selama 12 jam sepanjang tahunnya. Dengan memiliki letak geografis yang cukup strategis untuk menangkap paparan sinar matahari, Indonesia memiliki potensi energi surya sebesar 207.898 MW. Besarnya potensi tersebut, energi surya dapat dimanfaatkan dalam pemasangan Pembangkit Listrik Tenaga Surya (PLTS) untuk menghasilkan energi listrik Pada skripsi ini akan dibahas perancangan PLTS atap on-grid pada bangunan apartemen Ariama Service Residence yang memiliki kapasitas listrik sebesar 81,6 kVA. Salah satu metode untuk mengurangi biaya energi listrik pada apartemen tersebut adalah dengan melakukan pemasangan PLTS atap yang dapat berkontribusi untuk menyuplai energi listrik sehingga biaya listrik apartemen dapat berkurang. Perancangan PLTS atap dilakukan dengan dua perancangan, yaitu perancangan PLTS atap on-grid tanpa baterai dan PLTS atap on-grid dengan battery back-up. Hasil dari kedua rancangan tersebut akan dianalisis secara teknis dan ekonomi untuk dilihat kelayakan dari perancangan yang telah dilakukan. Dari hasil perancangan yang dilakukan, PLTS atap on-grid tanpa baterai dikatakan layak untuk dilakukan pemasangan. PLTS atap on-grid tanpa baterai dapat melakukan pembangkitan energi sebesar 54 kWh per hari dan berkontribusi sebesar 27,8% dari total rata-rata kebutuhan energi apartemen 81,6 kVA sebesar 194,16 kWh. Dari aspek ekonomi, PLTS atap on-grid tanpa baterai memiliki nilai LCOE sebesar Rp.880,266/ kWh di mana nilai tersebut di bawah nilai LCOE dari PT. PLN (Persero) sebesar Rp.1.119/kWh dan modal investasi yang diperlukan adalah sebesar Rp.309.099.000 yang dapat dikembalikan dalam waktu 11 tahun. Penghematan biaya energi listrik dari hasil pembangkitan dalam jangka waktu 20 tahun adalah sebesar Rp.926.119.656 dengan rata-rata penghematan biaya energi listrik per tahun sebesar Rp.46.309.982,8.

Geographically, Indonesia is located right on the equatorial line so that the sun's exposure has an optimal intensity for 12 hours throughout the year. By having a strategic geographical location to capture sun exposure, Indonesia has a solar energy potential of 207,898 MW. Given the large potential, solar energy can be utilized in the installation of Solar Power Plants to generate electrical energy. This study will discuss on the design of on-grid rooftop solar power plants in the Ariama Service Residence apartment building which has an electrical capacity of 81.6 kVA. One method to reduce the cost of electrical energy in the apartment is to install rooftop solar power plants that can contribute to supplying electrical energy so that the apartment's electricity costs can be reduced. The design of the rooftop solar power is carried out with two designs, the on-grid rooftop solar power plants without a battery and the on-grid rooftop solar power plants with a battery back-up. The results of the two designs will be analyzed technically and economically to see the feasibility of the designs that have been carried out. From the results of the design, the on-grid rooftop solar power plants without batteries are said to be feasible for installation. The on-grid rooftop solar power plants without batteries can generate energy of 54 kWh per day and contribute 27.8% of the total average energy requirement of an 81.6 kVA apartment of 194.16 kWh. From the economic aspect, the on-grid rooftop solar power plants without batteries have a LCOE value of Rp.880,266/ kWh where the value is below the LCOE value from PT. PLN (Persero) of Rp.1,119/kWh and the required investment capital is Rp.309.099.000 which can be returned within 11 years. The savings in electrical energy costs from the generation of a 20-year period is Rp.926,119,656 with an average electricity cost savings of Rp.46,309,982.8 per year."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ihsan Barran
"Indonesia saat ini sedang berada dalam transisi energi dan memiliki sumber daya alam yang besar terutama sumber radiasi matahari. Hingga saat ini Indonesia mempunyai target kapasitas hingga mencapai 37,15 GW dari Pembangkit Listrik Tenaga Surya (PLTS) yang dibagi tiga jenis, yaitu atap, tanah, dan apung. Simulasi repowering akan dilakukan pada penelitian ini dengan menggunakan dua jenis PLTS atap berkapasitas 1,4 MWp dan 300,56 kWp yang telah beroperasi sejak tahun 2020 dan berlokasi di Jawa Barat. Analisis tekno-ekonomi akan dilakukan pada penelitian ini dan penelitian ini bertujuan untuk menganalisa apakah dengan dilakukanya repowering terhadap kedua PLTS tersebut nilai Levelized Cost of Electricity (LCOE) akan lebih kompetitif.  Saat kedua PLTS didesain dan dibangun nilai LCOE sebesar 0,074 USD/kWh untuk PLTS-1 dan 0,073 USD/kWh untuk PLTS-2, setelah di lakukan simulasi repowering didapat nilai LCOE turun menjadi 0,070 USD/kWh untuk kedua PLTS tersebut. Selain hasil analisis tersebut, penelitian ini juga menganalisa kapan sebaiknya repowering di implementasikan dan membuka peluang bisnis PLTS atap untuk sektor rumah tangga di masa depan menggunakan PV bekas hasil implementasi repowering, dimana nilai LCOE yang didapat sudah sangat kompetitif sebesar 0,03 USD/kWh.

At this time, Indonesia is at energy transition and has large natural resources, especially solar energy. Indonesia has a target capacity of up to 37.15 GW from Solar Power Plant which is divided into three types, namely roof, ground mount, and floating. Repowering simulation will be carried out in this study using solar rooftop power plants with a capacity of 1.4 MWp and 300.56 kWp which have been operating since 2020, located in West Java. Techno-economic analysis will be carried out in this study and this study aims to analyze whether by repowering these solar rooftop power plant, the Levelized Cost of Electricity (LCOE) value will be more competitive. When these solar power plant were designed and built, the LCOE value was 0.074 USD/kWh for PLTS-1 and 0.073 USD/kWh for PLTS-2, after the repowering simulation, the LCOE value fell to 0.070 USD/kWh for both of solar rooftop power plant. In addition, the results of this study also analyzes when repowering was implemented, it opens up solar rooftop power plant business opportunities for the household sector in the future using PV used from the repowering implementation, where the LCOE value obtained is very competitive at 0.03 USD/kWh."
Jakarta: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Syauqi
"Indonesia sebagai Negara tropis memiliki potensi energi surya yang tinggi dengan radiasi harian rata-rata sebesar 4.5 kWh/m2/hari (Muhammad Bachtiar, 2006). Pembangunan PLTS atap pada gedung fasilitas kesehatan dapat dijadikan sebagai salah satu solusi guna membantu gedung agar dapat bekerja selama 24 jam melayani masyarakat. Penelitian dilakukan untuk mengetahui besar kapasitas PLTS atap beserta jumlah komponen-komponennya dan besar modal biaya yang diperlukan pada awal pendirian PLTS atap. Hasil dari simulasi menunjukkan bahwa sistem PLTS atap yang optimal untuk didirikan pada Puskesmas Kecamatan Tanjung Priok memiliki kapasitas sebesar 9,28kW dengan produksi listrik tahunan mencapai 12.712kWh. Perincian komponen-komponen pada sistem yang dibangun antara lain, 30=3 modul PV dengan daya 300Wp, 22 baterai Li-ion 12V-100ah, 4.37kW konverter. Adapun lahan yang diperlukan untuk memasang modul PV seluas 64,03m2 derta modal yang dibutuhkan untuk membangun PLTS atap berkapasitas 9,28kW tersebut adalah senilai Rp223.229.232,10.

Indonesia as a tropical country has a high solar energy potential with an average daily irradiance of 4.5kWh/m2/day (Muhammad Bachtiar, 2006). The establishment of rooftop solar power plant on healthcare center can be considered as one of the solution to help the building work 24 hour a day to serve the people in need of medical assistance. This study conducted to determine the optimal rooftop solar power plant capacity along with the components and the amount of capital investment needed at the start of the rooftop solar power plant establishment. The result of the study shows that the optimal rooftop solar power plant system to be built at the Tanjung Priok Sud-district Healthcare Center has a capacity of 9,28kW with annual electricity production reaching 12.712kWh. Te details of the components needed for the system included 33 PV module with 300Wp capacity, 22 12V-100ah Li-ion batteries, and 4,37kW converter. The area of land required to install the PV modules is an area of 64,03m2 as well as the capital investment needed to build the 9,28kW rooftop solar power plant is worth IDR223.229.232,10."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hero Gunawan
"Sebagai bentuk komitmen pemerintah dalam meningkatkan capaian bauran energi nasional dari sektor energi baru terbarukan khususnya dibidang energi surya, pada tahun 2020 pemerintah telah melakukan pembangunan PLTS rooftop di beberapa gedung usulan pemerintah daerah yang meliputi gedung perkantoran, rumah sakit, sekolah, tempat ibadah dan fasilitas umum lainnya yang tersebar di beberapa wilayah di Indonesia. Penelitian ini mengambil 12 gedung pada paket pekerjaan pertama yang beratapkan datar dengan kapasitas 25 kWp dan 50 kWp sebagai obyek penelitian untuk menganalisi dampak keteknikan dan ekonomi akibat pengunaan dan perubahan tilt modul PV. Nilai investasi Rp/kWp pada kapasitas terpasang 25 kWp nilai tertinggi dimiliki oleh Gedung Islamic Center sebesar Rp. 16.458.600 dan 50 kWp dimiliki gedung RSUD Ternate dengan nilai Rp. 15.275.750 dimana faktor lokasi menjadi salah satu penyebab tingginya nilai investasi tersebut. Dari penelitian ini didapatkan bahwa nilai PVout yang dihasilkan per tahun dengan penggunaan tilt optimum pada aplikasi GSA sebesar 647.830 kWh lebih tinggi jika dibandingkan dengan hasil simulasi PVSYST sebesar  630,342 kWh dan pada penggunaan tilt sebesar 150 didapatkan output total PLTS rooftop sebesar 615.039 kWh dengan nilai NPV terbesar terletak pada gedung Bupati Sumenep sebesar Rp. 634.312.639 dengan  PBP terkecil selama 6.7  tahun  dan ROI sebesar 250.1 %. Penurungan emisi CO2 (PEy) untuk simulasi dengan pada tilt 150 didapatkan nilai sebesar  477,94 tCO2 sedangkan pada tilt optimum sebesar 481,33 tCO2.

As a form of government commitment in increasing the achievement of the national energy mix from the renewable energy sector, especially in the field of solar energy, in 2020 the government has carried out the construction of PLTS Rooftop in several local government buildings which include office buildings, hospitals, schools, places of worship and other public facilities. spread over several regions in Indonesia. This research sampled 12 buildings in the first work package with a flat roof with a capacity of 25 kWp and 50 kWp as research objects to analyze the technical and economic impacts of using and changing the tilt of the PV module. The investment value of Rp/kWp at an installed capacity of 25 kWp, the highest value was obtained at the Islamic Center Building of Rp. 16,458,600 and 50 kWp in the Ternate Hospital building with a value of Rp. 15,275,750 where the location distance is one of the causes of the high investment value. From this study it was found that the PVout value generated per year with the use of optimum tilt in the GSA application of 647,830 kWh is higher than the PVSYST simulation results of 630,342 kWh and on the use of tilt of 150 the total output of  PLTS Rooftop is 615,039 kWh with the largest NPV value located in the Sumenep Regent Building  for Rp. 634,312,639 with the smallest PBP for 6.7 years and an ROI of 250.1%. The CO2 emissions reduction (PEy) in the simulation with tilt 150 is 477.94 tCO2, while at tilt the optimum is 481.33 tCO2."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>