Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 90049 dokumen yang sesuai dengan query
cover
Ibrahim
"Kolaborasi antar stakeholder dalam siklus hidup proyek sangat penting untuk meningkatkan kinerja proyek konstruksi rancang bangun. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor yang mempengaruhi keberhasilan kolaborasi tim proyek konstruksi rancang bangun sehingga didapatkan pengaruh dari model kolaborasi terhadap kinerja kolaborasi dengan faktor rentang batas geografis, profesional, stakeholder, dan budaya etnis dalam proyek kontstruksi rancang bangun di Indonesia. Penelitian ini menggunakan analisa faktor dan hubungan variabel dengan metode Structural Equation Modeling SEM . Hasil dari penelitian didapatkan rentang batas geografis dan budaya etnis berpengaruh secara signifikan pada kinerja kolaborasi.

Collaboration between stakeholders in the project life cycle is critical to improving design and build construction project performance. The purpose of this research is to identify the critical success factors of collaboration of design and build construction project team so that can be understand the influence of collaboration model to collaboration performance with the geographic, professional, stakeholder, and ethnic cultural boundary spanners in design and build construction project in Indonesia. This research uses factor analysis and variable relation with Structural Equation Modeling SEM method. The results of the research obtained geographical and ethnical boundaries significantly influence the collaboration performance."
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48743
UI - Tesis Membership  Universitas Indonesia Library
cover
Ramadhan Istabaq A`Lam
"Kompleksitas proyek konstruksi yang meningkat sementara terjadi kehilangan kinerja proyek yang disebabkan oleh batasan yang kaku dan sulit ditembus di antara satuan organisasi, profesi, dan proses di industri konstruksi, menuntut lebih banyak perhatian pada aspek kolaborasi antar organisasi. Studi ini mengambil manfaat dari teori sosial tentang batasan dan budaya organisasi untuk meneliti faktor tambahan yang mungkin berhubungan dengan peningkatan kolaborasi. Dengan menggunakan analisis SEM untuk mengolah data responden, ditemukan bahwa tiga dari lima faktor, yaitu pola rentang batas geografis, budaya organisasi dan konflik, memiliki korelasi yang signifikan terhadap kinerja kolaborasi sehingga strategi kolaborasi kemudian disusun berdasarkan faktor-faktor ini.

Increasing complexity of construction projects on top of the loss of performance caused by rigid dan impermeable boundaries between organizations, professions, dan processes in construction industry, calls for more attention to interorganizational collaboration. This study takes benefit of the social theory of organizational boundaries dan culture to examine additional factors that may be related to improvement of collaboration. Using SEM analyses to process the respondents data, it is found that three factors out of five, a geographical boundary spanning pattern, organizational culture dan conflict, have significant correlation to the performance of collaboration hence the collaboration strategy is formulated based on these factors."
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49043
UI - Tesis Membership  Universitas Indonesia Library
cover
Robert
"ABSTRAK
Keselamatan kerja di industri konstruksi masih menjadi perhatian utama pada beberapa negara di dunia. Hal ini disebabkan tingkat kecelakaan kerja di industri konstruksi masih jauh lebih tinggi dibandingkan industri lainnya. Penelitian ini bertujuan untuk (i) mengetahui faktor - faktor yang mempengaruhi keselamatan kerja, (ii) mengetahui critical success factors pelaksanaan keselamatan kerja dan (iii) improvement yang dilakukan untuk mencapai keselamtan kerja. Penelitian ini menggunakan metode Analisa Faktor dan Analytical Hierarchy Process. Dari penelitian ini diperoleh 5 Critical Success Factors yaitu Kepimpinanan (30,69%), Perilaku Keselamatan (22,49%), Perencanaan Keselamatan (22,26%), Kemampuan Individu (17,52%), dan Laporan dan Evaluasi (7,04%). Berdasarkan critical success factors tersebut maka diperoleh improvement terhadap pelaksanaan budaya keselamatan kerja.

ABSTRACT
Safety in the construction industry is still a major concern in some countries in the world. This is due to the levels of occupational accidents in the construction industry is still far higher than other industries. This study aims to (i) identify factors - factors that affect safety, (ii) determine critical success factors implementation of safety and (iii) the improvement work done to achieve salvation. This study uses Factor Analysis and Analytical Hierarchy Process. From this research, the 5 Critical Success Factors are the leadership of the (30.69%), Behavioral Safety (22.49%), Safety Planning (22.26%), Individual Capability (17.52%), and the Report and Evaluation (7,04%). Based on the critical success factors of the obtained improvement to the implementation of safety culture.
"
2017
T49034
UI - Tesis Membership  Universitas Indonesia Library
cover
Utami Widiyaningsih
"Keterlaksanaan konstruksi constructability merupakan sebuah pendekatan yang menghubungkan proses desain dan konstruksi sehingga dapat menghemat waktu untuk menyelesaikan suatu proyek konstruksi Trigunarsyah, 2004. Salah satu konsep dari constructability adalah penggunaan modularisasi pracetak precast . Industrialised Building System IBS merupakan teknik konstruksi dimana komponen ndash; komponennya diproduksi di lingkungan yang terkendali di luar atau di dalam site.
Penelitian ini bertujuan untuk mengetahui faktor pendukung dan faktor penghambat yang paling dominan dalam penerapan IBS serta strategi penerapan konsep constructability yang difokuskan kepada konsep penggunaan IBS untuk meningkatkan kinerja waktu pada proyek Pembangunan Rusun di Indonesia.
Metode penelitian berupa studi kasus pada Proyek Rancang Bangun Pembangunan Rumah Susun Bertingkat Tinggi, Kemayoran yang dibangun oleh Kementerian PUPR Tahun Anggaran Tahun Jamak 2016-2017. Dengan menggunakan metodologi tinjauan pustaka, wawancara semi terstruktur kepada pakar atau praktisi, dan kuesioner kepada kontraktor dan pemilik proyek, diperoleh 3 faktor pendukung yang paling dominan, 4 faktor penghambat yang paling dominan dan 11 strategi penggunaan IBS untuk meningkatkan kinerja waktu.

Constructability is an approach that links the design and construction process so that it can save time to complete a construction project Trigunarsyah, 2004. One concept of constructability is the use of precast modularization precast. Industrialised Building System IBS is a construction technique in which components are produced in a controlled environment outside or inside the site.
This study aims to identify the most dominant enablers and barriers in the application of IBS and the strategy of applying the concept of constructability which is focused on using of IBS to improve the time performance in the apartment construction project in Indonesia.
The research method is a case study on the High rise Apartment Construction Design Build Project, Kemayoran that built by the Ministry of PUPR by Multi Years 2016 2017. Using the literature review methodology, semi structured interviews to experts or practitioners, and questionnaires to contractors and project owners, obtained 3 of the most dominant enablers, the 4 most dominant barriers and 11 IBS use strategies to improve time performance.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49180
UI - Tesis Membership  Universitas Indonesia Library
cover
Rosma Indriyani
"Pembangunan Jalan Tol saat ini sedang gencar dilakukan baik dilakukan oleh Pemerintah maupun oleh pihak swasta. Namun pada pelaksanaannya sering terjadinya keterlambatan penyelesaian pembangunan Jalan Tol. Keterlambatan penyelesaian ini mengakibatkan banyak dampak diantaranya timbulnya potensi klaim, meningkatnya biaya konstruksi yang dapat berimbas kepada meningkatnya biaya investasi hingga merusak image/ citra dari perusahaan dan Pemerintah. Penelitian ini menggunakan pendekatan Project Management Body Of Knowledge (PMBOK) 6th Edition dan PMBOK 7th Edition untuk mengetahui risiko-risiko apa saja yang muncul pada tahap Perencanaan dan Pengendalian Pembangunan Jalan Tol. Studi literatur dilakukan untuk penyusunan variabel, kemudian dilakukan evaluasi pakar, pilot survey, penyebaran kuesioner utama kepada responden, melakukan evaluasi, uji validasi dan reliabilitas, korelasi, analisa faktor. Didapatkan 9 risiko dengan level tertinggi pada tahapan perencanaan dan dan 13 risiko untuk tahapan pengendalian. Dari faktor risiko dominan disusun pengembangan proses berupa penyusunan prosedur sebagai salah satu bentuk mitigasi dari risiko dominan. Penelitian ini melakukan pengembangan terhadap 16 prosedur untuk tahapan perencanaan dan pengendalian. Hasil penelitian ini diharapkan dapat memberikan masukan bagi Operator Jalan Tol dalam melakukan perencanaan dan pengendalian pembagunan jalan tol, sehingga dapat meminimalis terjadinya keterlambatan penyelesaian pembangunan Jalan Tol.

Toll road construction is currently being intensively carried out by both the government and the private sector. However, in practice there are often delays in completing the construction of toll roads. This delay in completion results in many impacts, including the emergence of potential claims, increased construction costs which can result in increased investment costs and even damage to the image of the company and the Government. This research uses the Project Management Body of Knowledge (PMBOK) 6th Edition and PMBOK 7th Edition approaches to find out what risks arise at the Toll Road Development Planning and Control stage. Literature studies were carried out to prepare variables, then expert evaluation was carried out, pilot surveys were carried out, distribution of the main questionnaire to respondents, evaluation, validation and reliability tests, correlation and factor analysis. There were 9 risks with the highest level at the planning stage and 13 risks for the control stage. From the dominant risk factors, process development is developed in the form of procedures as a form of mitigation of the dominant risk. This research developed 16 procedures for the planning and control stages. It is hoped that the results of this research can provide input for Toll Road Operators in planning and controlling toll road construction, so as to minimize delays in completing toll road construction."
Jakarta: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Poetera Ramadhan Agoes
"Pembangunan Infrastruktur di Indonesia, baik yang diinisiasi oleh pemerintah maupun pihak swasta dalam beberapa tahun terakhir mengalami pertumbuhan yang pesat. Tercatat, sampai dengan tahun 2023 terdapat total 201 proyek infrastruktur, terdiri dari sektor transportasi, sektor kawasan, sektor sumber daya air, sektor perumahan dan sektor energi yang masuk ke dalam proyek strategis nasional dan saat ini sudah terealisasi total 156 proyek. Namun, tingginya pertumbuhan pembangunan infrastruktur di Indonesia juga diikuti dengan meningkatnya kasus kegagalan konstruksi. Dalam periode tahun 2017-2022, telah terjadi peristiwa kegagalan konstruksi pada proyek infrastruktur yang melibatkan penyedia jasa konstruksi Badan Usaha Milik Negara (BUMN) dengan kualfikasi usaha perusahaan besar. Merujuk kepada peraturan Lembaga Pengembangan Jasa Konstruksi Nomor 12 Tahun 2009, perusahaan dengan kualifikasi besar harus memiliki sertifikat ISO 9001:2000 untuk sistem manajemen mutu. Badan Usaha Milik Negara (BUMN) dengan kualifikasi besar harus menerapkan pengendalian proyek yang baik berdasarkan sistem manajemen mutu ISO 9001:2000 mulai dari tahap perencanaan sampai dengan tahap pembangunan. Komunikasi yang merupakan satu dari tiga indikator strategi pengembangan budaya mutu, sistem kepemimpinan dan tingkat kematangan, turut andil dalam terjadinya kegagalan konstruksi. Dalam dunia konstruksi yang kompleks dan melibatkan beberapa individu atau kelompok, komunikasi yang mencakup pertukaran informasi yang efektif dan pemahaman terhadap informasi yang diterima berperan besar dalam kesuksesan proyek dan memenimalisir kegagalan konstruksi. Informasi harus didistribusikan kepada pihak yang tepat, secara akurat dan konsisten sehingga Distribusi Informasi yang merupakan satu dari lima parameter kontrol yang mempengaruhi sistem komunikasi. Tujuan dari penelitian ini adalah menentuan indikator-indikator dalam sistem komunikasi proyek konstruksi yang berpengaruh terhadap keberhasilan perusahaan jasa konstruksi bumn nasional dalam menurunkan tingkat kegagalan konstruksi dan menghasilkan strategi peningkatan distribusi informasi dalam sistem komunikasi proyek konstruksi yang perlu diterapkan pada perusahaan jasa konstruksi bumn nasional untuk menurunkan tingkat kegagalan konstruksi. Metode penelitian yang digunakan adalah validasi pakar, wawancara dan studi literatur. Hasil penelitian ini didapatkan  11 variabel dan 37 Indikator distribusi informasi yang berpengaruh dalam menurunkan kegagalan konstruksi.

Infrastructure development in Indonesia, both initiated by the government and the private sector, has experienced rapid growth in recent years. It is recorded that up to 2023 there will be a total of 201 infrastructure projects, consisting of the transportation sector, the regional sector, the water resources sector, the housing sector, and the energy sector, which are included in national strategic projects, and currently a total of 156 projects have been realized. However, the high growth in infrastructure development in Indonesia has also been accompanied by an increase in construction failures. In the period 2017–2022, there have been construction failures in infrastructure projects involving state-owned construction service providers (BUMN) with large company business qualifications. Referring to the Construction Services Development Institute regulation Number 12 of 2009, companies with large qualifications must have an ISO 9001:2000 certificate for a quality management system. State-Owned Enterprises (BUMN) with large qualifications must implement good project control based on the ISO 9001:2000 quality management system from the planning stage to the construction stage. Communication, which is one of the three indicators of a quality culture development strategy, leadership system, and level of maturity, has contributed to construction failures. In a complex world of construction involving several individuals or groups, communication that includes effective exchange of information and understanding of the information received plays a major role in project success and minimizes construction failures. Information must be distributed to the right parties accurately and consistently, so information distribution is one of the five control parameters that affect the communication system. The purpose of this study is to determine the indicators in the construction project communication system that influence the success of national state-owned construction service companies in reducing construction failure rates and produce strategies for increasing information distribution in construction project communication systems that need to be applied to national-owned construction service companies to reduce construction failure rates. The research methods used are expert validation, interviews, and literature studies. The results of this study obtained 11 variables and 37 indicators of information distribution that had an effect on reducing construction failures."
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nara Adhisthana
"Pelaksanaan proyek konstruksi yang dikelola oleh kontraktor swasta dewasa ini tidak hanya mempertimbangkan aspek teknis seperti biaya, waktu, dan ruang lingkup tetapi juga aspek manajemen proyek yang sering berkaitan dengan kematangan internal perusahaan dalam mengelola proyek. Seiring dengan berkembangnya teori dalam bisnis konstruksi, terdapat pertimbangan aspek lainnya yaitu aspek sustainability. Teori sustainable construction lahir sebagai akibat dari kegiatan konstruksi yang diperkirakan berkontribusi terhadap 50 persen limbah padat di dunia. Salah satu bentuk konstruksi adalah konstruksi stasiun instrumen meteorologi yang semakin dibutuhkan di era dengan cuaca tidak menentu ini. Selain waktu pembangunan yang cukup lama, stasiun instrumen meteorologi akan dibangun di antara pemukiman warga dan akan digunakan untuk jangka waktu yang lama. Oleh sebab itu, penting bagi kontraktor untuk menerapkan praktik sustainability yang berfokus pada 3 pilar yaitu ekonomi, lingkungan, dan sosial. Penelitian ini bertujuan untuk mengetahui tingkat praktik su stainability dengan studi kasus proyek konstruksi stasiun instrumen meteorologi di 3 lokasi berbeda di Indonesia. Hasil penelitian dengan menggunakan metode Distance to Ideal Maturity Level (DIML) dan Importance Performance Analysis (IPA) menunjukan proyek di satu lokasi memiliki nilai terendah dengan nilai terendah yaitu 3 dari 5 tingkat sehingga perlu dilakukan perbaikan agar kematangan proyek meningkat.

Construction project run by private contractor has many aspects to consider other than cost, time, and scope but also other aspect such as project management which usually associates with maturity of a company in managing a project. As the theory in construction business developed, another aspect to consider is sustainability. Sustainability in construction usually known as sustainable construction theory, emerge as a result of waste generated by construction project which responsible for an estimated 50 percent of solid waste. Construction of a meteorological instrument station also takes part in contribution of solid waste. Due to weather uncertainty, more meteorological instrument stations are being construct progressively. Aside from the time consuming construction, it is also located among residential area which will be used for a long period of time. The sustainability theory itself has 3 pillars that is economy, environment, and social. Therefore, it is important for contractor to implement sustainability practices. The purpose of this article is to assess sustainability practices in case studies addressed to construction of meteorological instrument stations in 3 different locations in Indonesia. The result, which processed using Distance to Ideal Maturity Level (DIML) and Important Performance Analysis (IPA), shows one location with lowest maturity level (3 out of 5). Furthermore, recommendations on sustainability pra ctices are provided in order to improve the maturity level of the project."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Atik Khomsiati
"Seiring dengan berjalannya kemajuan metode-metode yang digunakan dalam pelaksanaan suatu proyek konstruksi, maka banyak kemungkinan-kemungkinan ataupun alternatif cara untuk ataupun dalam pelaksanaan suatu proyek konstruksi hingga selesai.
Dilatarbelakangi atas hal tersebut, maka saya mencoba untuk mengangkat beberapa pekerjaan dalam suatu proyek konstruksi untuk di bahas. Proyek konstruksi yang di tinjau adalah proyek konstruksi perumahan. Beberapa pekerjaan yang di maksud adalah pekerjaan pasangan bata, plester, aci dan rangka atap. Pekerjaan-pekerjaan tersebut di pilih karena pada pekerjaan-pekerjaan tersebut dapat dikerjakan dengan cara yang lebih praktis dan adanya kemungkinan untuk penghematan biaya pelaksanaannya. Yaitu dengan menggunakan material-material alternatif dengan fungsi yang sama dan dapat menghasilkan suatu hasil atau produk yang lebih baik. Material-material alternatif tersebut adalah bata ringan, semen mortar dan rangka atap baja ringan.
Dengan melengkapi data-data selain dari buku panduan suatu produk tersebut, dapat di tambah dari kuisioner dan foto-foto. Sehingga setelah diolah dan perhitungkan kembali, dapat menghasilkan ataupun memberi pengaruh yang baik terhadap kontraktor yang melaksanakan suatu proyek konstruksi perumahan tersebut.

Through to the methods progress that are used in operational of construction project, there are so many ways or alternatives to complete the construction project. Because of that reason, I try to choose some works in construction project as the topics.
The construction project that I take is housing construction project. Some works are bricks work, plaster work and roof truss. Those works are chose because they can be done by the easier ways and make the cost more cheaper than the costom ones. The materials alternative with the same function can produce the product better than the costom ones. The materials alternative are light brick, mortar cement and light truss.
Besides the guide book from the products, we can also add the informations from quisioners and photographs. So we can analyze and get the results. And we can make the conclution for the contractor is : by using the materials alternative, we can get the good influences more than the costom ones.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S50557
UI - Skripsi Open  Universitas Indonesia Library
cover
Dian Subandini
"Tujuan penulisan adalah menganalisis aktivitas pengendalian internal PT. X terhadap proyek KSO. Penelitian merupakan studi kasus dengan metode penelitian berupa wawancara dan observasi serta studi kepustakaan. Karakteristik proyek KSO adalah bekerjasama dengan mitra mengerjakan suatu proyek, pencatatan akuntansi dengan metode ekuitas, dan memiliki NPWP tersendiri sehingga aktivitas pengendalian berbeda dengan proyek non KSO.
Penelitian menyimpulkan aktivitas pengendalian internal PT. X untuk proyek KSO sudah cukup memadai, dengan terpenuhinya tiga prinsip aktivitas pengendalian COSO. Beberapa perbaikan perlu dilakukan sehingga risiko dapat dimitigasi sampai level yang dapat diterima, sistem informasi memiliki general control yang baik, kebijakan dan prosedur dapat dilaksanakan dengan baik.

The purpose of writing is to analyze the activity of internal control of PT. X on KSO project. Research is a case study with research methods in the form of interviews and observation and literature study. The characteristics of the KSO project are to work with partners on a project, accounting records using the equity method, and have a separate NPWP so that control activities are different from non-KSO projects.
The study concludes that PT. X's internal control activities for the KSO project are sufficient, with the fulfillment of three principles of COSO control activities. Some improvements need to be made so that risks can be mitigated to acceptable levels, information systems have good general control, policies and procedures can be well implemented.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2017
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Yunan Indra Saputra
"Pelaksanaan proyek konstruksi baik dari sektor pemerintah maupun swasta di Indonesia semakin meningkat. Semakin tinggi juga kompleksitas paket pekerjaan yang ditawarkan oleh pengguna jasa ke penyedia jasa. Proyek konstruksi pada umumnya, dan proyek konstruksi jembatan pada khususnya sangat berkaitan erat dengan risiko perubahan yang dapat terjadi selama periode kontrak konstruksi. Risiko perubahan yang tidak dikelola dengan baik, akan dapat menyebabkan perselisihan antara pengguna jasa dan penyedia jasa. Untuk menghindari perselisihan atas konflik yang terjadi karena adanya perubahan, sangat penting bagi penyedia jasa untuk mempersiapkan klaim dengan langkah-langkah yang ditentukan sesuai dengan kondisi kontrak. Proses improvisasi pelaksanaan klaim pada penelitian ini berupa pengembangan Standar Operasional Prosedur administrasi dan dokumentasi klaim pada proyek jembatan. Metode yang digunakan pada penelitian ini berupa studi kasus penanganan klaim proyek jembatan di PT XYZ dengan manganalisa faktor-faktor dominan pada klaim konstruksi yang didapatkan dari penelitian terdahulu. Faktor-faktor tersebut dianalisa lebih lanjut untuk mendapatkan hubungan antara masing-masing faktor sehingga didapatkan suatu model proses setiap indikator klaim, antara lain: klausul kontak, identifikasi klaim, notifikasi klaim, penyajian klaim, pemeriksaan klaim dan dokumentasi klaim yang dikembangkan menjadi Standar Operasional Prosedur (SOP) klaim di PT XYZ yang berguna untuk membantu penyedia jasa dalam pengajuan klaim, agar klaim yang diajukan dapat diterima oleh pengguna jasa.

The implementation of construction projects from both the government and private sectors in Indonesia is increasing. The higher the complexity of the project offered by owners to contractors. Construction projects in general, and bridge construction projects in particular are closely related to the risk of changes that may occur during the construction contract period. The risk of change that is not managed properly will cause disputes between owners and contractors. To avoid disputes over the conflict because the changes, it is important for contractors to make a claim under the measures determined in accordance with the conditions of the contract. The improvement claims process in this research is the development of Standard Operating Procedures for administration and documentation of claims for the bridge project. The method used is a case study of handling claims on bridge construction projects at PT XYZ by analyze domain factors claim on construction project which got from previous research. The factors will be analyzed to obtain the relationship between these factors, among others: contact clauses, identification of claims, notification of claims, presentation of claims, examination of claims and documentation of claims developed into Standard Operating Procedure (SOP) claims in PT XYZ that help contractors in claims submission, in other their claim can be accepted by owner."
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>