Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 10017 dokumen yang sesuai dengan query
cover
"Significant changes over the past decade in computing technology, along with widespread deregulation of electricity industries, have impacted on power plant operations while affording engineers the opportunity to introduce monitoring and plant-wide control schemes which were previously unfeasible. Contributors of world-class excellence are brought together in Thermal Power Plant Simulation and Control to illustrate how current areas of research can be applied to power plant operation, leading to enhanced unit performance, asset management and plant competitiveness through intelligent monitoring and control strategies."
London: Institution of Engineering and Technology, 2003
e20452186
eBooks  Universitas Indonesia Library
cover
Tyas Kartika Sari
"Penurunan operasi pembangkit listrik PLTD Pesanggaran yang disebabkan oleh derating, tingkat efisiensi rendah, tingkat emisi dan kebisingan yang tinggi telah menimbukan masalah kelistrikan di Bali. Selain itu, PLTD Pesanggaran juga masih menggunakan bahan bakar minyak (single fuel) dimana biaya pokok produksi energi listrik meningkat seiring naiknya harga bahan bakar HSD (High Speed Diesel). Oleh sebab itu, untuk mempertahankan suplai listrik di Bali tetap terpenuhi, pemilik perusahaan melakukan efisiensi melalui program diversifikasi energi.
Pada tahun 2012, sebuah perusahaan konsultan telah dipilih untuk melakukan kajian FS (feasibility study) untuk menilai kelayakan operasi pembangkit. Kajian tersebut menyarankan agar perusahaan melakukan assets retirement without abandonment untuk PLTD Pesanggaran yaitu dengan melakukan penggantian (replacement) pembangkit lama dengan pembangkit baru yang menggunakan dual fuel engine.
Metode yang digunakan adalah perhitungan biaya COE, LCC dan economic life dari pembangkit lama maupun pembangkit baru. Penelitian menggunakan data amatan PLTD Pesanggaran, di Bali. Dengan metode tersebut dapat menghasilkan suatu model management tools untuk menentukan kelayakan keekonomiannya. Model management tools tersebut dapat dipakai untuk mempermudah pengambilan keputusan di kasus-kasus serupa pada pembangkit listrik PLTD.

The decline in diesel power plant operation Pesanggaran caused by derating, the level of low efficiency, emissions and noise levels are high already raises the problem of electricity in Bali. In addition, diesel Pesanggaran also still use fuel oil (single fuel) in which electrical energy production cost increases with rising fuel prices HSD (High Speed Diesel). Therefore, to maintain the supply of electricity in Bali remains unfulfilled, the owner of the company to improve efficiency through energy diversification program.
Additionally in 2012, a consulting firm has been selected to conduct a study FS (Feasibility Study) to assess the feasibility of plant operation. The study recommends that companies perform asset retirement without abandonment to diesel Pesanggaran by performing replacement (replacement) old plant with a new plant that uses a dual fuel engine.
A methodology is needed to conduct research studies both technical and economical feasibility of the concept. The study used data Pesanggaran diesel observations, in Bali. The methodology can produce a model management tools to determine its economic feasibility as well as to perform sensitivity testing of each parameter related. Model management tools can be used to facilitate decisionmaking in similar cases in the diesel power plant.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
T43702
UI - Tesis Membership  Universitas Indonesia Library
cover
Febri Aditya Rachman
"Pemodelan dan optimasi rantai pasokan batubara pada PLTU dilakukan untuk mendapatkan jumlah minimal biaya pembelian batubara sampai PLTU. Optimasi dilakukan dengan menerapkan konsep linear programming mencakup penentuan fungsi objektif, variable keputusan dan batasan yang kemudian dilanjutkan proses optimasi dengan bantuan program Solver Microsoft Excel pada seluruh skenario yang dilakukan. Hasil optimasi rata-rata biaya minimum yang didapatkan dari seluruh skenario adalah US$. 94,39/ton, US$. 95,18/ton, US$. 95,7/ton, US$ 98,98/ton dan US$. 98,37. Dari semua skenario optimasi yang dilakukan bahwa supplier C tidak terpilih untuk memasok batubara pada PLTU.

Modeling and optimization of coal supply chain in Power Plant to determine the minimum amount purchase cost of coal to Power Plant. Optimization is done by applying the concept of linear programming with determination of the objective function, decision variable and constraints, then optimization process using Microsoft Excel Solver program for all scenario. Optimization result average minimum purchase cost of coal from all scenario are U.S. $. 94.39 / ton, U.S. $. 95.18 / ton, U.S. $. 95.7 / ton, U.S. $ 98.98 / ton and U.S. $. 98.37/ ton. From optimization result of all scenario that supplier C not chosen to supply coal to the Power Plant."
Depok: Fakultas Teknik Universitas Indonesia, 2012
S42844
UI - Skripsi Open  Universitas Indonesia Library
cover
Arief Rahman Darmawan
"Pada sebuah LNG complex site, terdapat dua permasalahan, yaitu rendahnya kehandalan di pembangkit listrik existing LNG plant dan adanya beban baru dari new LNG plant. Kemudian dibuatlah beberapa alternatif pemecahan masalah untuk dua permasalahan tersebut. Setelah dianalisis, alternatif pemecahan masalah yang paling mungkin dilakukan adalah pembangunan pembangkit listrik baru untuk memenuhi beban baru dan diinterkoneksi ke pembangkit listrik eksisting untuk meningkatkan kehandalannya. Kesalahan pemilihan pembangkit listrik baru akan menyebabkan inefisiensi dan tidak mampu mengatasi permasalahan rendahnya kehandalan di existing LNG plant.
Akan dilakukan penelitian untuk menentukan jenis dan kapasitas serta jumlah unit pembangkit listrik baru yang tepat. Sehingga keseluruhan pembangkit listrik, eksisting maupun baru, dapat menyuplai energi listrik dengan handal dan efisien serta dengan biaya serendah mungkin sesuai dengan prinsip to provide good quality energy at the lowest possible cost. Dari beberapa alternatif pembangkit listrik baru akan dicari alternatif pembangkit listrik yang paling optimal dari sisi kehandalan dan keekonomian pembangkit.
Parameter kehandalan pembangkit menggunakan metode LOLP (Loss of Load Probability) sedangkan parameter keekonomian pembangkit menggunakan perhitungan COE (Cost of Electricity) dan LCC (Lifecycle Cost). Kemudian dilakukan analisis kelayakan investasi guna mengetahui apakah investasi pembangkit listrik baru tersebut layak. Berdasar analisis, PLTMG 6x16 MW adalah yang paling optimal secara kehandalan dan keekonomian pembangkit listrik. Minimal terjadinya total black out pada kondisi eksisting adalah 50 hari per tahun, sedangkan LOLP setelah penambahan pembangkit listrik baru ini adalah 2,93 hari per tahun. Investasi pembangkit listrik tersebut dinyatakan layak.

There are two problems in an LNG complex site, lack of reliability of the power plant in the existing LNG plant and additional load of new LNG plant. Then defined some alternatives to solve these problems. After these alternatives has been analyzed, the best alternative can be done is create new power plant to cater the new load and to be interconected with the existing power plant to increase the reliability. Miscasting the new power plant will cause an innefficiency and cannot increase the reliability of electricity supply in the LNG complex site.
The purposes of this research are to choose the best type of power plant for the new power plant, how much the capacity and the number of the new power plant. So that the new and existing power plant can supply the electricity to whole LNG complex site with high reliability at the lowest possible cost, suitable with motto ?to provide good quality energy at the lowest possible cost. From some alternatives of new power plants, will be analyzed which is the most optimal power plant in terms of reliability and economical.
Reliability parameter of power plant using LOLP (Loss of Load Probability) method while economic parameter of power plant using COE (Cost of Electricity) and LCC (Lifecycle Cost). Investment feasibility analysis to determine wheter the investment of new power plant is feasible. The result of the analysis, Gas Engine Power Plant 6x16 MW is the most optimal alternative in term of reliability and economical. Minimum total black out of existing system is 50 days per year, while the LOLP after interconnected with the new power plant become 2,93 days per year. The investment of that power plant is feasible.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
David Kurniawan
"Investasi di bidang ketenagalistrikan adalah salah satu faktor yang sangat penting untuk menjamin tersedianya tenaga listrik dalam jumlah yang cukup yang dapat memenuhi permintaan pasokan. Dengan Kebijakan pemerintah dalam program percepatan pembangunan pembangkit listrik 10.000 MW yang tidak hanya bertujuan untuk mengatasi krisis listrik tetapi juga untuk mendorong perekonomian di Indonesia. Sumber daya primer yang melimpah di Indonesia khususnya batubara mencapai sebesar 104.9 milyar ton menjadi sumber energi utama penggerak pembangkit listrik 10.000 MW (PLTU) sehingga dapat menghasilkan energi yang dapat dijual sesuai dengan kapasitas masing-masing pembangkit.
Dengan menggunakan analisa model Inter Regional Input Output (IRIO) dapat diketahui hubungan antar sektor dan antar wilayah akibat adanya permintaan akhir sektor tertentu pada suatu wilayah sehingga dapat meningkatkan output dan pendapatan masyarakat. Dampak akibat pembangunan pembangkit listrik 10.000 MW terhadap perekonomian Indonesia dari kurun waktu 2011 sampai tahun 2014 dilihat dari peningkatan output berturut-turut sebesar 0,51%, 1,31%, 1,97% dan 2,34% dari output awal sebesar Rp. 5.081,29 triliun, sedangkan peningkatan pendapatan berturut-turut sebesar 0.42%, 0,99%, 1,45% dan 1,72% dari pendapatan awal sebesar Rp. 825,92 triliun. Sekaligus memiliki disparitas yang cenderung mengecil pada tahun 2014.

Investment in the electricity sector is on every important factor to ensure the availability of electricity in sufficient quantities to meet rising demand. With Government policy in the acceleration of 10,000 MW power project, which not only aims to overcome the power crisis but also to stimulate the economy in Indonesia. Primary resources are abundant in Indonesia, especially for coal reached 104.9 billion tons to the main energy source driving the 10,000 MW power plant (power plant) so as to generate energy that can be sold in accordance with the capacity of each plant.
By using the analysis model of the Inter Regional Input Output (IRIO) can be determined the relationship between sectors and between regions due to there cent demand for a particular sector in a region so as to increase output and incomes. Impacts due to construction of 10,000 MW power plant on the economy of Indonesia from the period 2011 to 2014, seen from the increased output respectively by 0.51%, 1.31%, 1.97% and 2.34% of initial output of Rp. 5081.29 billion, while revenue increased respectively by 0:42%, 0.99%, 1.45% and 1.72% of the initial income of Rp. 825.92 trillion. Well have a disparity that tends to shrink in 2014.
"
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012
T31827
UI - Tesis Open  Universitas Indonesia Library
cover
Sinaga, Arnol
"Penggunaan Pembangkit Listrik Tenaga Bayu makin meningkat sebagai sumber energi listrik terbarukan. Salah satu permasalahan dalam pemanfaatan PLTB adalah pengendalian generator induksi. Pada penelitian ini telah dirancang pengendali RFOC, Full Observer dan pengendali daya sebagai satu kesatuan kendali generator induksi. Tipe generator induksi yang dipakai adalah SCIG. Pengendali Rotor Flux Oriented Control (RFOC) adalah pengendali vektor yang mengatur arus stator. RFOC terdiri dari dua bagian yaitu decoupler dan pengendali PI untuk mengendalikan arus. Pengendali RFOC adalah pengendali yang memerlukan masukan arus stator referensi, arus stator generator dan kecepatan putar rotor generator.
Untuk mendapatkan kecepatan putar rotor generator, dalam penelitian ini didesain full order observer sebagai masukan pengendali RFOC sehingga tidak menggunakan sensor kecepatan. Sedangkan pengendali daya didesaian agar daya keluaran generator sesuai dengan daya referensi yang diberikan. Analisa dilakukan berdasarkan hasil simulasi pada MATLAB/Simulink dan C-Mex S-Function. Berdasarkan hasil simulasi, RFOC yang dirancang telah berhasil mengendalikan generator dengan perubahaann arus stator sumbu q, full observer dapat mengestimasi state dengan error 5% pada model dan kecepatan putar dengan error 0.43% dan waktu stabil 1.4s dan pengendali daya bekerja dengan baik.

The use of wind power plants as a source of renewable electric energy is increasing. One of the problems in the utilization wind turbin is the control of an induction generator. In this study, RFOC, Full Observer and Power Controller have been designed as control of induction generator. Induction generator type used is SCIG. Controlling Rotor Flux Oriented Control (RFOC) is a vector controller that regulates the stator currents. RFOC consists of two parts, decoupler and current PI controller. RFOC controller requires input reference stator current, stator current generator and the generator rotor rotational speed.
In this study, instead of speed sensor, full order observer has been used to estimate generator rotor speed. Power controller is used to regulate the generator output power in accordance with the references given. In this study, verification of controller performance has been done by using simulation MATLAB/Simulink. Simulation results show that RFOC, full observer and power controller have achieved its performance. RFOC has control the generator with change of q-axis stator current. Full observer has estimate with 5% error, and rotational speed with 0.43% with 1.4s. Power control have also worked well.
"
Depok: Fakultas Teknik Universitas Indonesia, 2012
S43323
UI - Skripsi Open  Universitas Indonesia Library
cover
Rina Ariani
"Suatu sistem tenaga listrik terdiri dari tiga bagian utama, yaitu pembangkitan, transmisi dan distribusi daya listrik. Adanya gangguan pada salah satu sistem tenaga listrik tersebut akan berpengaruh terhadap sistem lainnya. Analisis yang akan dilakukan adalah pengaruh adanya gangguan pada sistem saluran transmisi jaringan 150 kV terhadap kinerja sistem proteksi pada pembangkit listrik, khususnya di PLTGU UBP Priok, yang mengakibatkan beberapa unit trip bahkan padam total disebabkan oleh jatuh tegangan sesaat akibat gangguan yang terjadi. Menganalisis unjuk kerja dari sistem proteksi yang ada di PLTGU UBP priok yaitu relai proteksi numerik REG216 untuk memproteksi generator dan transformatornya, serta relai MVAG sebagai relai proteksi jatuh tegangan disisi 6 kV terhadap gangguan yang terjadi disistem transmisi. Saat terjadi gangguan hubung singkat di sistem transmisi 150 kV, relay proteksi yang bekerja adalah relai under voltage, yang telah mencapai waktu pick-up 4 detik.
Hasil dari analisis ini menunjukan kinerja sistem proteksi pembangkit di PLTGU Priok secara koordinasi antar sistem belum mampu memenuhi konsep operasi sistem pembangkit.Suatu sistem tenaga listrik terdiri dari tiga bagian utama, yaitu pembangkitan, transmisi dan distribusi daya listrik. Adanya gangguan pada salah satu sistem tenaga listrik tersebut akan berpengaruh terhadap sistem lainnya. Analisis yang akan dilakukan adalah pengaruh adanya gangguan pada sistem saluran transmisi jaringan 150 kV terhadap kinerja sistem proteksi pada pembangkit listrik, khususnya di PLTGU UBP Priok, yang mengakibatkan beberapa unit trip bahkan padam total disebabkan oleh jatuh tegangan sesaat akibat gangguan yang terjadi. Menganalisis unjuk kerja dari sistem proteksi yang ada di PLTGU UBP priok yaitu relai proteksi numerik REG216 untuk memproteksi generator dan transformatornya, serta relai MVAG sebagai relai proteksi jatuh tegangan disisi 6 kV terhadap gangguan yang terjadi disistem transmisi. Saat terjadi gangguan hubung singkat di sistem transmisi 150 kV, relay proteksi yang bekerja adalah relai under voltage, yang telah mencapai waktu pick-up 4 detik. Hasil dari analisis ini menunjukan kinerja sistem proteksi pembangkit di PLTGU Priok secara koordinasi antar sistem belum mampu memenuhi konsep operasi sistem pembangkit. "
Depok: Fakultas Teknik Universitas Indonesia, 2013
S43981
UI - Skripsi Membership  Universitas Indonesia Library
cover
Syifa Restu Pramesti
"ABSTRAK
Pada COP ke-26 tahun 2021 di Glasgow, Pemerintah Indonesia menegaskan komitmen tanah air untuk mencapai net zero emissions (NZE) pada tahun 2060, seiring dengan aksi percepatan dalam rangka Paris Agreement dan United Nations Framework Convention on Climate Change. Fokus utama di sini adalah penggunaan Energi Baru Terbarukan (EBT), khususnya energi surya yang memiliki potensi sangat besar di Indonesia dan dianggap menjadi pemegang peran penting dalam mewujudkan serangkaian pilar Sustainable Development Goals (SDGs), yaitu affordable and clean energy; industry, innovations, and infrastructure; dan climate action. Dalam upaya mencapai target 23% EBT pada bauran energi nasional tahun 2025, Pemerintah Indonesia sedang menggalakkan program pengembangan dari pemanfaatan PLTS atap, terutama untuk daerah perkotaan yang memiliki permasalahan keterbatasan lahan. Penelitian ini akan difokuskan terkait perancangan sistem PLTS atap on-grid pada Gedung Teknologi 3, BRIN yang mana memiliki intensitas radiasi matahari cukup tinggi sekitar 4,83 kWh/m2/hari dan potensi pemanfaatan area atap yang luas menggunakan perangkat lunak PVsyst. Selain itu, dilakukan perbandingan atas fixed tilted plane dengan seasonal tilt adjustment terhadap nilai optimum tilt angle (OTA) tertentu dalam rangka memaksimalkan radiasi matahari untuk dimanfaatkan oleh panel surya. Berdasarkan analisis dan evaluasi secara teknis maupun ekonomis melalui empat skenario yang mampu dilakukan berdasarkan kombinasi hasil perhitungan jumlah komponen dengan pengaturan orientasi, dihasilkan perancangan PLTS yang memiliki pembangkitan sebesar 106,015 kWp dengan kebutuhan komponen sebanyak 233 modul surya dan 4 inverter serta melalui pengaturan orientasi berupa seasonal tilt adjustment adalah berkinerja paling optimal. Menurut aspek teknis yang ditinjau, perancangan tersebut mampu memberikan kontribusi terhadap penggunaan energi listrik pada hari kerja sebesar 46% dan hari libur sebesar 61%, menghasilkan Performance Ratio (PR) sebesar 82,74%, dan menyediakan pembangkitan energi listrik sebesar 158.156 kWh per tahun dengan global incident in collector plane sebesar +2,4%, near shadings: irradiance loss sebesar -0,80%, dan IAM factor on global sebesar -1,84%. Sementara itu, menurut aspek ekonomis yang ditinjau, perancangan tersebut mampu memberikan kontribusi terhadap penghematan biaya tagihan listrik sebesar 37% per tahun, membutuhkan biaya investasi awal sebesar Rp2.220.984.249, menghasilkan Payback Period (PP) pada tahun ke-16, menyediakan Net Present Value (NPV) sebesar Rp2.612.851.243, dan membentuk Benefit Cost Ratio (BCR) sebesar 1,18 dengan umur proyek yang direncanakan selama 20 tahun.

ABSTRACT
At the 26th COP in 2021 in Glasgow, the Government of Indonesia emphasized the country's commitment to achieve net zero emissions (NZE) by 2060, along with accelerated action within the framework of the Paris Agreement and the United Nations Framework Convention on Climate Change. The main focus here is using renewable energy, especially solar energy, which has enormous potential in Indonesia and is considered to be an essential role holder in realizing a series of Sustainable Development Goals (SDGs) pillars, namely affordable and clean energy; industry, innovations, and infrastructure; and climate action. To achieve the 23% renewable energy target in the national energy mix by 2025, the Government of Indonesia is promoting a development program for using rooftop solar power plants, particularly in urban areas with limited land availability. This research will focus on designing an on-grid rooftop solar power plant system at Technology Building 3, BRIN, which has a high solar radiation intensity of around 4,83 kWh/m2/day and the potential to utilize a large roof area using PVsyst software. In addition, a comparison of the fixed tilted plane with the seasonal tilt adjustment to certain optimum tilt angle (OTA) values is carried out to maximize solar radiation to be utilized by solar panels. Based on the analysis and evaluation, technically and economically, through four scenarios that can be done based on the combination of the results of the calculation of the number of components with the orientation settings, the resulting solar power plant design has a generation of 106,015 kWp with a component requirement of 233 solar modules and 4 inverters and through orientation setting in the form of seasonal tilt adjustment is the most optimal performance. According to the technical aspects reviewed, the design can contribute to the use of electrical energy on weekdays by 46% and weekends by 61%, resulting in a Performance Ratio (PR) of 82,74%, and providing electrical energy generation of 158.156 kWh per year with a global incident in collector plane of +2,4%, a near shadings: irradiance loss of -0,80%, and a IAM factor on global of -1,84%. Meanwhile, according to the economic aspects reviewed, the design can contribute to savings in electricity bill costs of 37% per year, requiring an initial investment cost of IDR 2.220.984.249, generating a Payback Period (PP) in year 16, providing a Net Present Value (NPV) of IDR 2.612.851.243, and forming a Benefit Cost Ratio (BCR) of 1,18 with the planned project life of 20 years."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Wirawan Adipradana
"Desa Tunggul Bute adalah salah satu desa yang memanfaatkan pembangkit listrik air mikro (PLTMH) untuk memenuhi kebutuhan energi listrik. Potensi air Sungai Mendingin yang berada di Desa Tunggul Bute mencapai 207 kW. Berdasarkan hasil perhitungan debit dengan metode F.J. Mock, didapatkan debit andalan sebesar 0,86 m3/detik. Sedangkan tinggi efektif yang tersedia adalah sebesar 17,678 meter.
Berdasarkan profil beban Desa Tunggul Bute, diperkirakan beban puncak Desa Tunggul Bute sebesar 50,3 kW pada tahun 2018. Optimasi potensi pembangkit didapatkan dari penggunaan debit sebesar 0,86 m3/detik dan tinggi efektif 12,73 meter sehingga didapatkan kapasitas pembangkit sebesar 53 kW. Konfigurasi tersebut menyebabkan penyesuaian tinggi pada saluran pembawa menjadi 1,25 meter dan penyesuaian tinggi saluran pelimpah menjadi 1 meter. Sedangkan struktur bangunan sipil lainnya masih tetap dapat digunakan tanpa diperlukan penyesuaian yang berarti.

Tunggul Bute village is one’s of a village that used micro hydro power plant (PLTMH) to suply their energy needs. Water potency from Sungai Mendingin in Tunggul Bute village can generate up to 207 kW of energy. Based on the water flow calculations method by F.J. Mock, resulting 0,86 m3/second of potential water flow. Meanwhile, the effective head available around the location are 17,678 meters.
According to Tunggul Bute village load characteristic, the prediction of Tunggul Bute village peak load demand up to 50,3 kW in 2018. The optimization of power plants can be achieve by using 0,86 m3 /second of water flow and 12,73 meters of effective head to generate 53 kW of electricity. This configuration caused adjustment on headrace channel to becomes 1,25 meters of heigh and adjustment on spilway to becomes 1 meters of height. Meanwhile the structure of other civil constructions can be used without any major adjustment."
Fakultas Teknik Universitas Indonesia, 2013
T34920
UI - Tesis Membership  Universitas Indonesia Library
cover
Fahmi Fitri Moh. Noor
"Kegiatan operasional perusahaan, khususnya pembangkit listrik tenaga panas bumi cenderung memiliki risiko yang dapat menimbulkan kerugian yang cukup besar bagi perusahaan. Oleh karena itu, perlu dilakukan kajian analisis risiko untuk mengidentifikasi, mengukur, dan kemudian menyusun strategi untuk mengelola risiko tersebut. Pada penelitian ini, dilakukan proses identifikasi risiko untuk memperoleh risiko-risiko yang dapat mempengaruhi kegiatan operasional pembangkit listrik tenaga panas bumi. Analisis risiko dilakukan untuk mengetahui tingkatan dari masing-masing risiko tersebut. Setelah itu dilakukan simulasi dengan beberapa skenario berdasarkan asumsi dana yang tersedia untuk memperoleh alokasi biaya penanganan risiko yang dapat memberikan keuntungan maksimal bagi perusahaan. Secara keseluruhan, dapat disimpulkan bahwa semakin besar biaya yang dikeluarkan oleh perusahaan untuk mengatasi risiko-risiko tersebut, maka semakin besar pula keuntungan yang diperoleh.

Operational activity of the company, especially in geothermal powerplant, tends to resulting risks that can bring potential losses for the company. Therefore, it needs to conduct operational risk analysis in order to identify, measure, and prepare risk response planning. This research contains of risk identification process to determine risks that can disrupt the operational activities of geothermal powerplant. Risk analysis has been conducted to determine the level of each risk. Furthermore, simulation using some scenarios based on available budget assumption has been conducted in order to determine budget allocation of risk treatment that can give maximum profit for the company. Overall, it can be concluded that more budget that company spend to manage risks, more advantage that company gain."
Depok: Universitas Indonesia, 2007
S50441
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>