Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 19280 dokumen yang sesuai dengan query
cover
Smith, Nick Charlton
"The CDM Regulations impose responsibilities and requirements on architects and all parties to construction work. This title acts as a reference tool for the role of CDM Co-ordinator."
London : [RIBA , ], 2007
e20440072
eBooks  Universitas Indonesia Library
cover
Ofori, George
Singapore : Singapore University Press, 1990
338.4 OFO c
Buku Teks  Universitas Indonesia Library
cover
Ahmad Wanhar
"Pada tahun 1990, berbagai perusahaan industri konstruksi mulai menyadari bahwa manajemen proyek adalah bukan sebuah pilihan melainkan sebuah kebutuhan. Oleh karena itu perlu dilakukan analisis faktor risiko dalam aspek manajemen proyek. Referensi utama manajemen proyek pada skripsi ini adalah PMBOK (Project Management Body of Knowledge). Penelitian kali ini dilakukan dengan penyebaran kuisioner yang dilanjutkan dengan analisis menggunakan metode AHP dan SNI risiko. Setelah analisis selesai maka dilakukan pembahasan mengenai penyebab, dampak, respon preventif dan korektif. Hasil penelitian ini menunjukkan bahwa faktor risiko yang paling berpengaruh terhadap cost overrun terletak pada kelompok proses manajemen perencanaan. Apabila perencanaan dilakukan dengan baik dan matang maka eksekusi, pengawasan, dan penutupan akan berjalan dengan baik sehingga kinerja biaya proyek akan baik. Keberhasilan kinerja proyek 60% tergantung pada perencanan.

In 1990, companies began to realize that the construction industry project management is not an option but a necessity. Therefore it is necessary to analyze the risk factors in the project management aspects. The main reference for project management of this final report is the PMBOK (Project Management Body of Knowledge). The research was conducted by distributing questionnaires, followed by analysis using AHP and SNI risk. Once the analysis is completed, then continued with discussions for the causes, effects, preventive and corrective response. Results of this study showed that the risk factors that most affect the cost overrun is planning management process group. If planning did well and properly, the execution, monitoring, and closure will run well so that the performance of the project cost would be good. The successful performance of the project 60% depending on the planning."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S47148
UI - Skripsi Membership  Universitas Indonesia Library
cover
Singhs KS., Harban
Selangor: LexisNexis, 2011
624 SIG h
Buku Teks  Universitas Indonesia Library
cover
Phillips, Roland
"A Clients Guide to Health and Safety for a Construction Project is a fully up-to-date and straightforward guide which aims to assist construction clients in understanding the health and safety duties imposed upon them by the Construction (Design and Management) Regulations 2007 and to help ensure that a project is safe to build, use and maintain."
London : [RIBA , ], 2008
e20440111
eBooks  Universitas Indonesia Library
cover
Mott, Charles H.
New York, N.Y. : John Wiley & Sons, 1981
658.15 MOT a (1)
Buku Teks  Universitas Indonesia Library
cover
El-Reedy, Mohamed
Hoboken, NJ: Wiley , 2011
338.476 24 ELR c
Buku Teks  Universitas Indonesia Library
cover
Barrie, Donald S.
Jakarta: Erlangga, 1984
624.068 BAR p
Buku Teks  Universitas Indonesia Library
cover
Potts, Keith
New York: Taylor &Fransic, 2008
624.068 1 POT c
Buku Teks  Universitas Indonesia Library
cover
Coombs, William E.
New York: F.W. Dodge Co. , 1958
657 COO c
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>