Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 6830 dokumen yang sesuai dengan query
cover
Clamp, Hugh
"The indispensable "Which Contract? Fourth Edition" is the most up-to-date and reliable comparative analysis of the burgeoning number of standard forms of building contract currently available in the UK."
London : [RIBA ;, ], 2007
e20439920
eBooks  Universitas Indonesia Library
cover
Lupton, Sarah
""Guide to MW05", the new edition of Sarah Lupton's very successful "Guide to MW98", is a practical guide to the operation and administration of the JCT Minor Works Building Contract 2005 (MW05 and MWD05 versions)."
London : [RIBA , ], 2007
e20440116
eBooks  Universitas Indonesia Library
cover
Christiantono Tedjo
"Dalam mencapai tujuan proyek yang efektif, efisien, serta aman diperlukan perencanaan metode konstruksi yang matang. Metode konstruksi pada proyek bisa berbeda-beda tergantung deskripsi dan desain dari proyek tersebut. Perencanaan metode konstruksi pada umumnya tidak sebentar, melibatkan banyak pihak, serta perlu pertimbangan dari segi biaya, sumber daya, dan safety. Salah satu proses berkelanjutan dan berpengaruh dalam pendefinisian metode konstruksi adalah penentuan sumberdaya, alat, tahapan kerja, serta penyesuaian teknis alat berat. Ditambah perlunya karakteristik perencanaan konstruksi untuk gedung pintar pada masa ini. Machine-learning yang dikombinasikan dengan sistem blockchain merupakan salah satu instrumen yang dapat mengakomodir proses dalam metode konstruksi terutama dalam pendefinisian schedule alat dan sumberdaya, serta tahapan konstruksi. Mulai dari perencanaan sampai integrasi-evaluasi dengan basis historical data. Digunakannya instrumen tersebut dalam penelitian hasilnya mampu
mendefinisikan proses perencanaan konstruksi yang sangat cepat dengan menggunakan data spesifikasi dan biaya bangunan, sehingga dapat meningkatkan
produktiftas proses perencanaan konstruksi, serta dibandingkan metode perencanaan manual dapat memberikan hasil yang lebih efisien dari segi
penjadwalan sumberdaya dan alat, serta biayanya.

In achieving project objectives that are effective, efficient, and safe, careful planning of construction methods is required. Construction methods on projects may vary depending on the description and design of the project. Construction method planning is generally not short, involves many parties, and requires consideration in terms of costs, resources, and safety. One of the continuous and influential processes in defining construction methods is the determination of resources, tools, work stages, and technical adjustments of heavy equipment. Plus the need for construction planning characteristics for smart buildings at this time. Machine-learning combined with a blockchain system is one instrument that can
accommodate the process of construction methods, especially in defining tool and resource schedules, as well as construction stages. Starting from planning to integration-evaluation with the historical database. The use of these instruments in research results in being able to define fast construction planning process using building specifications data and budget, to increase the productivity of the construction planning process, and compared to manual planning methods can provide more efficient results in terms of scheduling resources and tools, as well as costs.
"
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Markanda, P.C.
India: Lexis Nexis , 2001
343.1 MAR b
Buku Teks  Universitas Indonesia Library
cover
McGuinness, John
Oxford: Blackwell Publishing, 2007
346.420 2 MCG l
Buku Teks  Universitas Indonesia Library
cover
Wallace, I.N. Duncan
London: Sweet & Maxwell, 1970
346.02 WAL h
Buku Teks  Universitas Indonesia Library
cover
cover
cover
Wallace, I.N. Duncan
London: Sweet and Maxwell, 1973
692.8 WAL f
Buku Teks  Universitas Indonesia Library
cover
Heppy Melaine Kurniaty
"Potensi kompromi kriteria harga terendah telah mendapat kritik dalam dunia pengadaan publik. Meskipun kriteria harga terendah bertujuan untuk mengendalikan biaya, terdapat kekhawatiran terkait implikasi potensialnya terhadap kualitas infrastruktur. Dinamika penawaran yang abnormal dalam pengadaan infrastruktur menggunakan kriteria harga terendah menambah resiko dalam pekerjaan konstruksi. Kebijakan evaluasi kewajaran harga adalah upaya pemerintah memastikan penawaran yang terlalu rendah dapat memenuhi persyaratan proyek dengan memadai dan memberikan hasil yang diinginkan tanpa mengorbankan kualitas atau menghadapi risiko kegagalan proyek. Penelitian ini berfokus pada dampak harga yang wajar hasil evaluasi kewajaran harga pada kriteria harga terendah dalam kontrak konstruksi terhadap kualitas konstruksi. Dengan pendekatan quasi-eksperimental dan desain regresi diskontinuitas, penelitian ini menganalisis efek dari evaluasi kewajaran harga pada penawaran yang berada di bawah ambang batas tertentu terhadap kualitas konstruksi. Penelitian ini mempertimbangkan hubungan kausal antara biaya, waktu, dan kualitas konstruksi dengan mengontrol berbagai faktor yang mempengaruhinya. Penelitian ini menguji efektivitas kebijakan tersebut dan implikasinya terhadap hasil kualitas kontruksi.

There have been critiques concerning the potential compromise of the lowest price criteria in the context of public procurement. While the main objective of implementing the lowest price criteria is to manage costs, there are concerns about its potential effects on the quality of infrastructure. Abnormal bidding patterns in infrastructure procurement using the lowest price criteria increase construction risks. The policy of evaluating the reasonableness of prices is a government effort to ensure that excessively low bids can adequately meet project requirements and deliver desired outcomes without sacrificing quality or facing project failure risks. This study focuses on the impact of reasonable price evaluation on the lowest price method in construction contracts. Using a regression discontinuity design, this study considers the causal relationship between price reasonableness evaluation on bids that fall below a certain threshold and construction quality and its implications for effectiveness."
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>