Perkembangan kemajuan proyek di Indonesia berkembang semakin pesat. Dalam penyelenggaraan proyek, seluruh aktivitas yang berlangsung di dalamnya tidak terlepas dari kontrak. Oleh karena itu, kita harus benar-benar mengerti dan memahami isi kontrak tersebut agar tidak terjadi kesalahpahaman. Hal-hal yang tidak memenuhi kewajiban dan hak salah satu pihak sebagaimana yang tercantum dalam kontrak dapat menyebabkan timbulnya klaim. Berdasarkan 10 Putusan Pengadilan Negeri yang didapat, penyebab utama klaim adalah wanprestasi serta faktor alam dan administrasi. Klaim dapat diselesaikan melalui Pengadilan Negeri dan Arbitrase. Banyak perusahaan yang lebih memilih menyelesaikan klaim melalui Badan Arbitrase Nasional Indonesia (BANI) karena sifat persidangannya yang tertutup diibandingkan melalui Pengadilan Negeri yang bersifat terbuka. Namun biaya yang harus dikeluarkan melalui BANI berkisar antara Rp 200.000.000,00 ? Rp 850.000.000,00, berbeda jauh dengan Pengadilan Negeri yang berkisar Rp 350.000,00 ? Rp 600.000,00. Klaim yang diputuskan melalui Arbitrase dapat dibatalkan melalui Pengadilan Negeri berdasarkan Pasal 70 UU No. 30/1999, yaitu adanya dokumen palsu atau dinyatakan palsu, adanya dokumen yang bersifat menentukan disembunyikan, dan adanya tipu muslihat. Selain dari tiga hal di atas, maka alasan apapun tidak dapat dijadikan untuk membatalkan putusan BANI.

ABSTRACT
The progress of the project in Indonesia is growing more rapidly. In the operation of the project, all the activity that takes place in it can not be separated from the contract, therefore, we must thoroughly understand and comprehend the contents of the contract in order to avoid misunderstandings. Things that do not fulfill one of the obligations and rights of the parties as specified in the contract may lead to a claim. Based on the 10 District Court obtained, the main cause of the claim is in default as well and force major and administration. Claims can be settled by the District Court and Arbitration. Many companies prefer to resolve claims through the Indonesian National Arbitration Board (BANI) due to the closed trial than using District Court because it is open trial. But the costs to be incurred through BANI ranges between Rp 200.000.000,00 - Rp 850.000.000,00, far with the District Court that ranges from Rp 350.000,00 - Rp. 600.000,00. Claims are decided through arbitration can be canceled by the District Court based to Article 70 of Law No. 30/1999, which is the existence of false documents or false otherwise, the decisive document is hidden, and the ruse. Apart from the three above, then any reason can not be used to overturn the decision of BANI"
2016
S64608
UI - Skripsi Membership  Universitas Indonesia Library
cover
Aisyah Redita
"Unforeseen ground condition often happens in construction work as the disturbance of the work. The effects of unforeseen ground condition cause some arguments between the Owner and the Contractor: who shall be responsible for that. Scope of work that is regulated in the contract plays a major role in this case, including in international construction contract where the different legal seats of the parties is a foreign element where it creates an issue of international business transaction also with international private law. When the Contractor applies a claim, FIDIC Conditions of Contract shall be used in this case.

Kondisi bawah tanah yang tidak terduga sering terjadi pada pekerjaan konstruksi sebagai gangguan terhadap pekerjaan. Efek dari gangguan kondisi bawah tanah yang tidak terduga tersebut menimbulkan beberapa argumen antara Pemilik dan Kontraktor: siapa yang harus bertanggung jawab terkait dengan gangguan pekerjaan yang disebabkan oleh kondisi bawah tanah yang tidak terduga. Lingkup pekerjaan yang diatur pada kontrak merupakan hal utama pada kasus ini. Perbedaan kedudukan hukum para pihak pada kontrak konstruksi internasional adalah elemen asing dimana menimbulkan permasalah transaksi bisnis internasional yang juga berkaitan dengan hukum perdata internasional. Ketika Kontraktor mengajukan klaim, FIDIC Conditions of Contract digunakan untuk kasus ini."
Depok: Universitas Indonesia, 2016
S62085
UI - Skripsi Membership  Universitas Indonesia Library
cover
cover
Ipan Dwi Ramadhan
"Dalam sebuah pelaksanaan suatu pekerjaan konstruksi, keberadaan kontrak merupakan pedoman untuk pihak pengguna jasa (owner) dan penyedia jasa (kontraktor) serta untuk pengendalian selama masa pekerjaan konstruksi. Selama masa pelaksanaan inilah seringkali terjadi perubahan atau ketidaksesuaian antara yang tercantum dalam kontrak dengan kenyataan yang ditemui di lapangan. Oleh karena itu, pihak kontraktor berhak mengajukan klaim kepada pemilik proyek. Klaim merupakan salah satu permasalahan yang sering muncul dalam proses konstruksi berlangsung, apabila tidak ditangani secara cerdas dan sungguh-sungguh bisa berdampak pada terganggunya kinerja waktu proyek atau bahkan mungkin dapat menggagalkan proyek yang sedang dilaksanakan.

In an execution of a construction work, the existence of the contract is a guide to the service user (owner) and service providers (contractors) and for control during construction work. During the implementation of this is often a change or inconsistency between stated in the contract with the reality that existed in the field. Therefore, the contractor entitled to lodge a claim with the project owner. The claim is one of the problems that often arise in the process of construction in progress, if not handled intelligently and can seriously affect the project time performance disruption may be able to thwart or even projects that are underway."
Depok: Fakultas Teknik Universitas Indonesia, 2010
S50644
UI - Skripsi Open  Universitas Indonesia Library
cover
Muhammad Haydar Al-Kautsar
"Sengketa klaim asuransi merupakan akibat dari perbedaan pendapat atau pengingkaran polis asuransi antara tertanggung dengan perusahaan asuransi. Sengketa klaim asuransi dapat diselesaikan di pengadilan negeri maupun di luar pengadilan. Setiap lembaga penyelesaian sengketa mempunyai kompetensi absolutnya masing-masing. Kompetensi absolut berbicara mengenai badan peradilan mana yang berwenang mengadili suatu sengketa. Dalam praktik, baik perusahaan asuransi maupun tertanggung masih banyak yang menempuh upaya penyelesaian sengketa klaim asuransi ke berbagai lembaga. Sementara upaya hukum yang dilakukan tersebut belum tentu sesuai dengan klausul arbitrase yang disepakati dalam polis asuransi. Skripsi ini mencoba memberikan penjelasan dengan melakukan analisis terhadap beberapa putusan pengadilan. Fokus permasalahan yang diangkat oleh skripsi ini terdiri atas dua hal, yakni implementasi
ketentuan kompetensi absolut antar lembaga penyelesaian sengketa klaim asuransi dalam praktik dan ketentuan kompetensi absolut untuk klausul arbitrase yang bersifat kontradiktif. Tujuan umum skripsi ini adalah untuk memberikan gambaran tentang
kompetensi absolut antar lembaga penyelesaian sengketa klaim asuransi di Indonesia. Tujuan khususnya adalah untuk menjawab permasalahan yang diangkat oleh skripsi ini. Metode penelitiannya berbentuk yuridis normatif dan bersifat deskriptif. Alat pengumpulan data terdiri atas bahan hukum primer, sekunder, dan tersier. Hasil penelitiannya adalah pada umumnya pengadilan telah mengakui keberadaan lembaga arbitrase. Namun, ada pihak yang kurang cermat karena menyusun materi gugatan campur aduk di luar kewenangan arbitrase, sehingga pengadilan negeri menyatakan dirinya berwenang mengadili perkara tersebut. Ditemukan pula klausul arbitrase yang bersifat alternatif bahkan kontradiktif. Klausul arbitrase yang demikian mengandung risiko, terutama jika salah satu pihak mempunyai itikad buruk. Simpulannya adalah cermat menyusun gugatan dan pastikan klausul arbitrase yang dibuat bersifat spesifik.

Insurance claim dispute is the result of denial of insurance policies between the insured and the insurance company. Insurance claim dispute is resolved in district court or outside court. Each dispute resolution institution has its own absolute competence. Absolute competence talks about which judicial body has the authority in a dispute. In practice, many insurance companies and insureds try to resolve insurance claim disputes through various institutions. Those legal action are not necessarily in accordance with the arbitration clause agreed in the insurance policy. This thesis provide explanation by analyzing several court decisions. The focus of this thesis consists of two things, namely the implementation of the absolute competency provisions between insurance claim dispute resolution institutions in practice and the absolute competence provisions for arbitration clauses which are contradictory. The general objective of this thesis is to provide an overview of the absolute competence of insurance claim dispute resolution
institutions in Indonesia. The specific objective is to answer the problems raised by this thesis. The research method is in the form of normative juridical and descriptive in nature. Data collection tools consist of primary, secondary, and tertiary legal materials. The results of his research are that in general courts have recognized the existence of arbitral institutions. However, there are parties who are not careful because they compile the mixed claim materials outside the authority of arbitration, so that the district court declares itself authorized to try the case. This thesis also found arbitration clauses that are alternative and even contradictory. Such arbitration clauses carry risks, especially if one of the parties has bad faith. The conclusion is to carefully prepare the lawsuit and make sure the arbitration clause made is specific.
"
Depok: Fakultas Hukum Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Haydar Al-Kautsar
"Sengketa klaim asuransi merupakan akibat dari perbedaan pendapat atau pengingkaran polis asuransi antara tertanggung dengan perusahaan asuransi. Sengketa klaim asuransi dapat diselesaikan di pengadilan negeri maupun di luar pengadilan. Setiap lembaga penyelesaian sengketa mempunyai kompetensi absolutnya masing-masing. Kompetensi absolut berbicara mengenai badan peradilan mana yang berwenang mengadili suatu sengketa. Dalam praktik, baik perusahaan asuransi maupun tertanggung masih banyak yang menempuh upaya penyelesaian sengketa klaim asuransi ke berbagai lembaga. Sementara upaya hukum yang dilakukan tersebut belum tentu sesuai dengan klausul arbitrase yang disepakati dalam polis asuransi. Skripsi ini mencoba memberikan penjelasan dengan melakukan analisis terhadap beberapa putusan pengadilan. Fokus permasalahan yang diangkat oleh skripsi ini terdiri atas dua hal, yakni implementasi ketentuan kompetensi absolut antar lembaga penyelesaian sengketa klaim asuransi dalam praktik dan ketentuan kompetensi absolut untuk klausul arbitrase yang bersifat kontradiktif. Tujuan umum skripsi ini adalah untuk memberikan gambaran tentang kompetensi absolut antar lembaga penyelesaian sengketa klaim asuransi di Indonesia. Tujuan khususnya adalah untuk menjawab permasalahan yang diangkat oleh skripsi ini. Metode penelitiannya berbentuk yuridis normatif dan bersifat deskriptif. Alat pengumpulan data terdiri atas bahan hukum primer, sekunder, dan tersier. Hasil penelitiannya adalah pada umumnya pengadilan telah mengakui keberadaan lembaga arbitrase. Namun, ada pihak yang kurang cermat karena menyusun materi gugatan campur aduk di luar kewenangan arbitrase, sehingga pengadilan negeri menyatakan dirinya berwenang mengadili perkara tersebut. Ditemukan pula klausul arbitrase yang bersifat alternatif bahkan kontradiktif. Klausul arbitrase yang demikian mengandung risiko, terutama jika salah satu pihak mempunyai itikad buruk. Simpulannya adalah cermat menyusun gugatan dan pastikan klausul arbitrase yang dibuat bersifat spesifik.

Insurance claim dispute is the result of denial of insurance policies between the insured and the insurance company. Insurance claim dispute is resolved in district court or outside court. Each dispute resolution institution has its own absolute competence. Absolute competence talks about which judicial body has the authority in a dispute. In practice, many insurance companies and insureds try to resolve insurance claim disputes through various institutions. Those legal action are not necessarily in accordance with the arbitration clause agreed in the insurance policy. This thesis provide explanation by analyzing several court decisions. The focus of this thesis consists of two things, namely the implementation of the absolute competency provisions between insurance claim dispute resolution institutions in practice and the absolute competence provisions for arbitration clauses which are contradictory. The general objective of this thesis is to provide an overview of the absolute competence of insurance claim dispute resolution institutions in Indonesia. The specific objective is to answer the problems raised by this thesis. The research method is in the form of normative juridical and descriptive in nature. Data collection tools consist of primary, secondary, and tertiary legal materials. The results of his research are that in general courts have recognized the existence of arbitral institutions. However, there are parties who are not careful because they compile the mixed claim materials outside the authority of arbitration, so that the district court declares itself authorized to try the case. This thesis also found arbitration clauses that are alternative and even contradictory. Such arbitration clauses carry risks, especially if one of the parties has bad faith. The conclusion is to carefully prepare the lawsuit and make sure the arbitration clause made is specific."
Depok: Fakultas Hukum Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Arief Novian Siddik
"ABSTRAK
Klaim konstruksi mempunyai pengaruh besar dalam implementasi proyek seperti pada biaya dan waktu. Sehingga keberhasilan proyek konstruksi sangat tergantung pada resolusi klaim yang efektif. Meskipun banyak pihak di dunia konstruksi mengakui bahwa litigasi atau pengadilan bukanlah jalan yang terbaik karena dapat mengurangi atau menghilangkan keuntungan dan merusak hubungan baik, namun jalan ini merupakan metode resolusi klaim dan sengketa secara tradisional dan utama dalam dunia konstruksi. Metode resolusi klaim dan sengketa melalui litigasi atau pengadilan dapat memecahkan masalah pada metode alternatif, yaitu pelaksanaan putusan dapat dipaksakan secara efektif terhadap pihak yang kalah dan putusan memiliki kekuatan hukum dari negara tempat klaim dan sengketa diperiksa. Tetapi litigasi atau pengadilan dapat berlangsung lebih lama sehingga memerlukan biaya tinggi. Wawancara terstruktur dan survei digunakan untuk mengumpulkan data penelitian ini. Selanjutnya analisa statistik dan analisa risiko serta analisa penyebab dan dampak dilakukan terhadap data yang diperoleh untuk kemudian hasilnya divalidasi terhadap pakar. Hasil penelitian ini mengidentifikasikan faktor penyebab kinerja pengadilan berlangsung lebih lama sehingga memerlukan biaya tinggi serta mengembangkan suatu sistem yang mampu memperbaiki sistem yang ada agar berjalan lebih efektif dan efisien yaitu dengan menggunakan Sistem Elektronik dan Teknologi Informasi Digital yang Berbasis Web dan Aplikasi.

ABSTRACT
Claim construction have a major influence in the implementation of projects such as the cost and time. So, the success of the construction project is highly dependent on the effective resolution of claims. Although many in the construction world recognizes that litigation or court is not the best way because it may reduce or eliminate profits and damage the relationship, but this road is a method of resolving claims and disputes that have traditionally and foremost in the world of construction. Method of resolving claims and disputes through litigation or court may solve the problem in an alternative method, namely the implementation of the judgment can be enforced effectively against the losing party and the ruling has the force of law of the country where the claims and disputes examined. But litigation or court may take longer and require high cost. Structured interviews and surveys are used to collect research data. Furthermore, statistical analysis and risk analysis as well as causal and impact analysis are conducted on the data obtained for the results then validated against the expert. The results of this study identified the factors that causing the performance of the court lasted longer so it requires a high cost and develop a system that can improve the existing system to run more effectively and efficiently that is by using Electronic Systems and Digital Information Technology based on Web and Applications."
2017
T48174
UI - Tesis Membership  Universitas Indonesia Library
cover
Arie Arnady
"Pada umumnya, kualitas konstruksi jalan sangat dipengaruhi oleh proses perencanaan, proses pelelangan dan pelaksanaan konstruksi serta pemakaian berbagai macam sumberdaya. Pembangunan bidang konstruksi jalan yang tidak efisien akan mengakibatkan pemborosan, dilain pihak masih terdapat rendahnya kualitas konstruksi jalan.
Oleh karena itu, penelitian ini bermaksud untuk melakukan suatu kajian tentang faktor-faktor yang berpengaruh terhadap rendahnya kualitas proyek konstruksi jalan sehingga umur rencana pelayanan jalan tidak tercapai, studi kasus proyek di Provinsi NTT yang ditinjau dari pakar dan stakeholders
Untuk menjawab dan mengevaluasi apa yang menyebabkan serta bagaimana melakukan treatment terhadap faktor-faktor yang mengakibatkan rendahnya kualitas proyek konstruksi jalan, identifikasi perlu dilakukan melalui metode Risiko, dimana metode ini dipilih untuk dapat melihat peringkat yang mempengaruhi pemilihan faktor yang berpengaruh terhadap rendahnya kualitas proyek konstruksi jalan dan melalui manajemen risiko yang meliputi faktor-faktor risiko, analisa risiko, evaluasi risiko, dan tindakan mengelola risiko (treatment atanrisk response).
Penelitian diharapkan dapat mengetahui faktor-faktor penyebab, dengan melakukan analisa kualitatif, dengan menganalisis data persepsi yang didapat dari kuisioner dengan responden pakar, stakeholder (kontraktor dan konsultan) serta yang mempunyai pengalaman dalam bidang konstruksi jalan. Dan secara kuantitif dengan mencoba menemukan nilai-nilai realistik terhadap konsekuensi dan menganalisa secara terperinci pengaruh relatif berbagai faktor yang mengarah kepada risiko.

In general, quality of construction of road hardly influenced by planning process, auction process and execution of construction and assorted usage of human recourse. Development of ''onstruction area of inefficient road will result extravagance, so that will affect signifikan to the low of quality of construction of road.
Therefore, this research haves an eye to does a study about factors having an effect on to the low of quality of project of construction of road so that Service plan age of road is not reached, case study project of in Province East Nusa Tenggara evaluated from side expert and stakeholders
To answer and evaluates what causing and how doing treatment to factors resulting the low of quality of project of construction of road, identification need to be done through risk method, where this method selected to be able to see rank influencing election of factor having an effect on to the low of quality of project of construction of road and through risk management covering risk factors, risk analysis, evaluation of risk, and action manages risk (treatment or risk response).
Research is expected able to know factors cause, by doing qualitative analysis, with perception data analysis gotten from kuisioner with responder expert, stakeholder ( contractor and consultant) and having experience in the field of construction road. And in kuantitif by trying to finds values realistik to consequence and analyses detailedly relative influence various factors leading to risk.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
T25787
UI - Tesis Open  Universitas Indonesia Library
cover
Arie Arnady
"Pada umumnya, kualitas konstruksi jalan sangat dipengaruhi oleh proses perencanaan, proses pelelangan dan pelaksanaan konstruksi serta pemakaian berbagai macam sumberdaya. Pembangunan bidang konstruksi jalan yang tidak efisien akan mengakibatkan pemborosan, dilain pihak masih terdapat rendahnya kualitas konstruksi jalan. Oleh karena itu, penelitian ini bermaksud untuk melakukan suatu kajian tentang faktor-faktor yang berpengaruh terhadap rendahnya kualitas proyek konstruksi jalan sehingga umur rencana pelayanan jalan tidak tercapai, studi kasus proyek di Provinsi NTT yang ditinjau dari pakar dan stakeholders.
Untuk menjawab dan mengevaluasi apa yang menyebabkan serta bagaimana melakukan treatment terhadap faktor-faktor yang mengakibatkan rendahnya kualitas proyek konstruksi jalan, identifikasi perlu dilakukan melalui metode Risiko, dimana metode ini dipilih untuk dapat melihat peringkat yang mempengaruhi pemilihan faktor yang berpengaruh terhadap rendahnya kualitas proyek konstruksi jalan dan melalui manajemen risiko yang meliputi faktor-faktor risiko, analisa risiko, evaluasi risiko, dan tindakan mengelola risiko (treatment atau risk response).
Penelitian diharapkan dapat mengetahui faktor-faktor penyebab, dengan melakukan analisa kualitatif, dengan menganalisis data persepsi yang didapat dari kuisioner dengan responden pakar, stakeholder (kontraktor dan konsultan) serta yang mempunyai pengalaman dalam bidang konstruksi jalan. Dan secara kuantitif dengan mencoba menemukan nilai-nilai realistik terhadap konsekuensi dan menganalisa secara terperinci pengaruh relatif berbagai faktor yang mengarah kepada risiko.

In general, quality of construction of road hardly influenced by planning process, auction process and execution of construction and assorted usage of human recourse. Development of construction area of inefficient road will result extravagance, so that will affect signifikan to the low of quality of construction of road. Therefore, this research haves an eye to does a study about factors having an effect on to the low of quality of project of construction of road so that service plan age of road is not reached, case study project of in Province East Nusa Tenggara evaluated from side expert and stakeholders.
To answer and evaluates what causing and how doing treatment to factors resulting the low of quality of project of construction of road, identification need to be done through risk method, where this method selected to be able to see rank influencing election of factor having an effect on to the low of quality of project of construction of road and through risk management covering risk factors, risk analysis, evaluation of risk, and action manages risk (treatment or risk response).
Research is expected able to know factors cause, by doing qualitative analysis, with perception data analysis gotten from kuisioner with responder expert, stakeholder ( contractor and consultant) and having experience in the field of construction road. And in kuantitif by trying to finds values realistik to consequence and analyses detailedly relative influence various factors leading to risk.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
T40661
UI - Tesis Open  Universitas Indonesia Library
cover
Indra Pandu Prasetyo
"Waktu dan kualitas merupakan dua hal penting yang saling berkaitan dalam proyek konstruksi. Ketepatan waktu dalam penyelesaian dan kualitas hasil pekerjaan yang baik merupakan penentu keberhasilan proyek. Namun proyek konstruksi tidak dapat luput dari adanya resiko yang dapat menyebabkan kualitas rendah dan keterlambatan penyelesaian, untuk itu peneliti di sini melakukan identifikasi faktor-faktor yang menyebabkan hal tersebut bisa terjadi.
Penelitian ini dilakukan secara kualitatif. Faktor-faktor penyebab yang didapatkan dari literatur disebar kepada kontraktor melalui kuesioner untuk melihat presepsi dari kontraktor. Data hasil kuesioner dianalisis dengan menggunakan uji statistik, AHP, dan analisis level dampak untuk mendapatkan faktor-faktor utama. Hasil analisis menyatakan perubahan desain saat peleaksanaan sebagai faktor utama penyebab keterlambatan dan rendahnya kualitas hasil pekerjaan.

Time and quality are two important things related to each other in construction projects. Timeliness in project completion and good quality of work result are determinant keys of project success. However the construction project can?t be escaped from the risks that can lead to poor quality and delays in completion, so the researcher here to identify the factors that cause it could happen.
The research was conducted qualitatively. Cause factors that obtained from the literature are distributed to contractors through a questionnaire to perceive contractor?s perception. Result data from questionnaire were analyzed using statistic test, AHP, and analysis level of impact to obtain major factors. The analysis show the design changes in implementation as a lead factor causing delay and poor quality.
"
Depok: Fakultas Teknik Universitas Indonesia, 2012
S42206
UI - Skripsi Open  Universitas Indonesia Library