Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 16374 dokumen yang sesuai dengan query
cover
Rapier, Robert
"This book helps readers sort through energy hype, doom and gloom, and misinformation to understand what really matters in energy, and how it impacts individuals, investors, businesspeople, and policy makers worldwide. The book covers the overall global energy situation, the particular risks for the U.S. with its present energy mix, the energy outlook for the developed world and emerging economies like China and India, what peak oil really means, and the present and likely future of natural gas, coal, oil, nuclear power, and alternative energy sources."
New York: Springer, 2012
e20425558
eBooks  Universitas Indonesia Library
cover
"
ABSTRACT
Interdisciplinary in its approach and global in its perspective, Energy Systems and Sustainability: Power for a Sustainable Future, Second Edition, provides a contemporary exploration of the economic, social, environmental, and policy issues raised by current systems of energy use. Emphasizing the important issue of sustainability, it analyzes the historical evolution of the world's energy systems, the principles underlying their use, and their present status and future prospects. Beginning with a survey of basic energy concepts, the book describes the magnitude and patterns of human energy needs at various levels. It moves on to an overview of the fossil and nuclear-fuelled energy that, together with hydroelectric power and traditional biofuels, supply most of the world's commercial energy needs. Sections on economics describe the basic methods through which the monetary costs of energy are calculated, also considering the "external" costs of energy production. Finally, the book looks at the sustainability issues associated with both fossil- and nuclear-fuel use--and considers the technological advancements and social developments that might solve these problems. Providing a truly interdisciplinary approach, Energy Systems and Sustainability: Power for a Sustainable Future, Second Edition, is ideal for undergraduate engineering students and undergraduates studying policy making. "
Oxford: Oxford University Press, 2012
333.79 ENE
Buku Teks  Universitas Indonesia Library
cover
Flavin, Christopher
London: Earthscan Publications, 1995
333.79 FLA p
Buku Teks  Universitas Indonesia Library
cover
Yoga Adi Candra
"Pemerintah ditargetkan untuk bauran energi terbarukan minimal 23%. Kontribusi kapasitas pembangkit dari energi surya setara sebesar 6,5 GW dari total kapasitas pembangkitan energi terbarukan sebesar 45 GW pada 2025. Energi surya memiliki potensi lebih dari 200 GW dengan efisiensi teknologi photovoltaic yang tersedia saat ini. Namun, pemanfaatan energi surya dalam pembangkitan listrik masih kurang dari 100 MW. Tujuan penelitian ini adalah menganalisis selisih biaya tagihan litrik sebelum dan sesudah pemasangan PLTS, menentukan kecepatan pengembalian investasi pemasangan PLTS atap, mendeskripsikan dampak pemasangan PLTS atap terhadap pelanggan, PLN dan pemerintah. Hasil penelitian pada pelanggan daya 450 VA sebelum PV = Rp. 63.154, sesudah PV = Rp. 78.085 dan pada pelanggan daya 900 VA sebelum PV = Rp. 110.413, sesudah PV = Rp. 112.240. Skema export-import yang paling optimal adalah 85%. Potensi pengalihan subsidi listrik berjumlah Rp46.433.637.049.601 untuk pemasangan PLTS sebanyak 1.797.612 unit.

The government is targeted to a renewable energy mix of at least 23%. The contribution of generating capacity from solar energy is equivalent to 6.5 GW of the total renewable energy generation capacity of 45 GW by 2025. Solar energy has the potential of more than 200 GW with the efficiency of photovoltaic technology currently available. However, the use of solar energy in electricity generation is still less than 100 MW. The aim of this study was to analyze the difference in the cost of electricity bills before and after PLTS installation, determine the speed of return on investment in PLTS installation, describing the impact of PLTS installation on customers, PLNs and the government. Research results on 450 VA power customers before PV = Rp. 63,154, after PV = Rp. 78.085 and at 900 VA power customers before PV = Rp. 110.413, after PV = Rp. 112.240. The most optimal export-import scheme is 85%. The potential for the shifting of electricity subsidies is Rp. 46,433,637,049,601 for the installation of 1,797,612 PLTS units."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Pasaribu, Ivan Maxmillian Putra
"Pemerintah Indonesia melalui Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) optimis untuk mencapai target bauran Energi Baru dan Terbarukan (EBT) sebesar 23% dari energi nasional pada tahun 2025. Penetrasi EBT terhadap sistem tenaga listrik memiliki kekurangan karena adanya sifat ketidakpastian sumber EBT yang bergantung pada kondisi alam. Virtual Power Plant (VPP) sebagai teknologi terbaru menyediakan solusi untuk masalah tersebut yang merupakan gugus dari pembangkit yang terdistribusi, sistem penyimpanan energi, dan beban fleksibel yang berfungsi untuk meningkatkan penetrasi sumber EBT dan menciptakan suatu sistem tenaga listrik yang terkontrol. Penilitian ini bertujuan untuk merancang VPP di kawasan industri Pulo Gadung dengan memanfaatkan Pembangkit Listrik Tenaga Surya (PLTS) dan Battery Energy Storage System (BESS) menggunakan platform XENDEE. Simulasi yang dilakukan mengoptimalkan biaya kelistrikan serta keandalan sistem ketika terjadi pemadaman. Hasil simulasi menunjukkan implementasi VPP dapat menurunkan biaya kelistrikan dari $0,1/kWh menjadi $0,881/kWh pada skenario tarif normal dan dari $0,1042/kWh menjadi $0,987/kWh pada skenario tarif dengan Time-of-Use (ToU). Hasil simulasi juga menunjukkan implementasi BESS pada VPP dapat meningkatkan keandalan sistem ketika terjadi pemadaman.

The Indonesian government through the Electricity Procurement Plan (RUPTL) is optimistic to achieve the Renewable Energy Sources (RES) target of 23% of the national energy in 2025. RES penetration into the electric power system has drawbacks due to the intermittency nature of RES that depend on natural conditions. Virtual Power Plant (VPP) as the latest technology provides a solution to this problem which is a group of distributed energy resources (DER), energy storage systems, and flexible loads that function to increase penetration of RES and create a controlled power system. This research aims to design a VPP in the Pulo Gadung industrial area by utilizing a Solar Power Plant and a Battery Energy Storage System (BESS) using the XENDEE platform. The simulations carried out optimize electricity costs and system reliability when outage occur. Optimization results show that the implementation of VPP can reduce costs of energy from $0.1/kWh to $0.881/kWh in the normal tariff scenario and from $0.1042/kWh to $0.987/kWh in the Time-of-Use (ToU) scenario. The simulation results also show that the implementation of BESS in VPP can provide system reliability during power outages."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
cover
Safira Nur Sabrina
"Tarif energi baru dan terbarukan (EBT) adalah kebijakan yang paling umum dan biasanya digunakan di dunia untuk mendorong pengembang swasta memasuki pasar pembangkit listrik EBT. Namun di Indonesia, tarif EBT yang berlaku saat ini berdasarkan Permen ESDM No. 50/2017 dianggap tidak mencukupi menguntungkan bagi pengembang swasta karena tarif EBT berbasis biaya Pembangkit PLN berbasis daerah (BPP, Harga Pokok Produksi) yang kena flat dengan pembangkit bahan bakar fosil, yang saat ini cenderung lebih mahal rendah dibandingkan dengan biaya investasi pembangkit EBT. Karena itu Dengan menggunakan Pembangkit Listrik Tenaga Surya (PLTS) Fotovoltaik Karena kasusnya, penelitian ini bertujuan untuk mengkaji seperti apa struktur tarif tersebut EBT saat ini sesuai dengan kelayakan finansial dari potensi yang ada Pembangunan PLTS Fotovoltaik tertuang dalam Rencana Umum Penyediaan Tenaga Listrik (RUPTL) 2019-2028. Penelitian ini dilakukan dengan menggunakan Pemodelan keuangan disimulasikan untuk dua skenario teknologi berbeda yaitu 1) PLTS Fotovoltaik on-grid tanpa menggunakan sistem baterai dan 2) PLTS Fotovoltaik on-grid menggunakan sistem baterai. Adapun, hasilnya dari studi ini adalah struktur tarif EBT saat ini, hanya sesuai kelayakan finansial 60% dari potensi pengembangan PLTS Fotovoltaik dalam RUPTL 2019-2028 dalam skenario PLTS Fotovoltaik on-grid tanpa sistem baterai. Sedangkan pada skenario PLTS Fotovoltaik menggunakan sistem baterai, Tarif EBT hanya sesuai dengan kelayakan finansial 24% dari potensi pengembangan PLTS Fotovoltaik dalam RUPTL 2019-2028.
ABSTRACT
Tarif energi baru dan terbarukan (EBT) adalah kebijakan yang paling umum dan biasanya digunakan di dunia untuk mendorong swasta memasuki pasar pembangkit listrik EBT. Namun di Indonesia, tarif EBT yang sesuai saat ini berdasarkan Permen ESDM No. 50/2017 respon tidak mencukupi menguntungkan bagi pengembang swasta karena tarif EBT berbasis biaya Pembangkit PLN berbasis daerah (BPP, Harga Pokok Produksi) yang kena flat dengan pembangkit bahan bakar fosil, yang saat ini cenderung lebih mahal dibandingkan dengan biaya investasi pembangkit EBT. Karena itu Dengan menggunakan Pembangkit Listrik Tenaga Surya (PLTS) Fotovoltaik Karena kasusnya, penelitian ini bertujuan untuk mengkaji seperti apa struktur tarif tersebut EBT saat ini sesuai dengan kelayakan finansial dari potensi yang ada Pembangunan PLTS Fotovoltaik tertuang dalam Rencana Umum Penyediaan Tenaga Listrik (RUPTL) 2019 -2028. Penelitian ini dilakukan dengan menggunakan Pemodelan keuangan yang disimulasikan untuk dua skenario teknologi yang berbeda yaitu 1) PLTS Fotovoltaik on-grid tanpa menggunakan sistem baterai dan 2) PLTS Fotovoltaik on-grid menggunakan sistem baterai. Adapun, hasilnya dari studi ini adalah struktur tarif EBT saat ini, hanya sesuai kelayakan finansial 60% dari potensi pengembangan PLTS Fotovoltaik dalam RUPTL 2019-2028 dalam skenario PLTS Fotovoltaik on-grid tanpa sistem baterai. Sedangkan pada skenario PLTS Fotovoltaik menggunakan sistem baterai, Tarif EBT hanya sesuai dengan kelayakan finansial 24% dari potensi pengembangan PLTS Fotovoltaik dalam RUPTL 2019-2028.

Tariff policy is important to induce RE developers to enter the market of electricity power plants. In Indonesia, the developers face uncertainty in business they experienced several changes in tariff structure for the last two years. According to MEMR Regulation No.50/2017, the current tariff structure is not the ideal case since the tariff uses mixed energy generation cost per region as the basis instead of renewable energy generation cost. Therefore, using solar PV generation as the case,this study aims to examine how the current tariff structure fits the potential development of solar PV power plants based on RUPTL 2019-2028. This research will be conducted using financial modeling to look at two scenarios, which are 1) Solar Photovoltaic on-grid without a battery system, 2) Solar photovoltaic on-grid with a battery system. The result of this study is the current tariff structure is only fits 60% of the potential development of solar PV power plants based on RUPTL 2019-2028 in a scenario without battery system and 24% of the potential development of solar PV power plants based on RUPTL 2019-2028 in a scenario with a battery system. "
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia , 2019
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hasmaratantra Dhaneswara
"Perkembangan harga dari PV belakangan ini telah membuat teknologi PV semakin terjangkau. Harga dari modul PV di US sudah menurun dari 60c/watt menjadi 40c/watt dalam 3 bulan belakangan ini., dan diperkirakan akan semakin menurun sampai sekitar 35c/watt kedepannya. Tujuan dari penelitian ini adalah untuk mencari karakteristik dari rugi-rugi pada saluran yang disebabkan oleh penetrasi PV dan mendapatkan lokasi optimum dan kapasitas PV optimum. Simulasi alliran daya dilakukan pada grid pulau sumba timur menggunaka software DIgSILENT Power factory 15.1. Pemasangan PV pada sistim distribusi radial dengan lokasi optiPerkembangan harga dari PV belakangan ini telah membuat teknologi PV semakin terjangkau. Harga dari modul PV di US sudah menurun dari 60c/watt menjadi 40c/watt dalam 3 bulan belakangan ini., dan diperkirakan akan semakin menurun sampai sekitar 35c/watt kedepannya. Tujuan dari penelitian ini adalah untuk mencari karakteristik dari rugi-rugi pada saluran yang disebabkan oleh penetrasi PV dan mendapatkan lokasi optimum dan kapasitas PV optimum. Simulasi alliran daya dilakukan pada grid pulau sumba timur menggunaka software DIgSILENT Power factory 15.1. Pemasangan PV pada sistim distribusi radial dengan lokasi optimum dan kapasitas optimum dapat mengurangi rugidaya aktif hingga 50 . Lokasi optimal dan persentase penetrasi optimal untuk sistim distribusi radial di Sumba Timur system Waingapu terletak di bus Kambajawa dengan penetrasi 40.

Recent price wars of the PV technology have made PV technology become more accessible. The price of solar modules in the US has already fallen from around 60c watt to 40c watt in the last quarter alone, and is expected to fall further to around 35c watt in the current quarter. The objectives of this research are to get the characteristic of line losses caused by PV penetration and get the optimum location and optimum PV penetration percentage. Load flow simulation was done on East Sumba Grid by using software DIgSILENT Powerfactory 15.1. Installation of PV in radial distribution system with optimum location and optimum percentage penetration able to decrease the active power losses up to 50 . Optimal location and penetration capacity percentage for radial distribution system in East Sumba Waingapu System Grid located in Kambajawa bus with 40 Penetration."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S66050
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sihombing, Adolf Leopold S.M.
"ABSTRACT
Pembangkit listrik tenaga hidro (minihidro dan mikrohidro) memiliki peranan yang besar dalam bauran energi di Indonesia. Pembangunan pembangkit listrik tersebut meningkatkan penggunaan material dan energi yang secara langsung maupun tidak langsung berkontribusi terhadap emisi karbondioksida (C02). Tujuan dari studi ini adalah menghitung intensitas energi dan C02 serta Energy Payback Time (EPBT) dari siklus hidup pembangkit listrik tenaga minihidro dan mikrohidro. Studi ini menggunakan metode Life Cycle Analysis (LCA) dengan lingkup analisis mulai dari tahapan konstruksi hingga operasional pembangkit. Unit fungsional yang digunakan adalah jumlah energi dan C02 yang dihasilkan dari setiap produksi listrik (MJ/kWh dan gram COz/kWh). Selain itu dilakukan analisis EPBT guna mendapatkan jumlah tahun yang dibutuhkan untuk mengembalikan seluruh investasi energi selama siklus hidup pembangkit. Nilai intensitas energi untuk PLTM dan PLTMH berkisar antara 0,06 to 0,85 MJ/kWh atau 0,01to 0,1 kWhprim/kWh. Nilai intensitas emisi C02 untuk PLTM dan PLTMH berkisar antara 3,99 to 76,94 g COz/kWh dengan kontribusi terbesar berasal dari pekerjaan sipil yaitu minimal 90,72o o. Rentang nilai Primary Energy Payback T ime (PEPBT) untuk PLTM dan PLTMH adalah 0,07 to 1,74 tahun dengan nilai penghematan energi sebesar 4,42 to 331,68 GWh. Sedangkan rentang nilai untuk COEmisi C02 Payback T ime (COZPBT) untuk PLTM dan PLTMH adalah 0,112,09 tahun, dengan penghematan emisi C02 sebesar 1,78 x 106 115,76 x 106 kg C02 selama siklus hidup pembangkit."
Jakarta: Badan Penelitian dan Pengembangan Energi dan Sumber Daya Mineral, 2016
621 KLET 15:2 (2016)
Artikel Jurnal  Universitas Indonesia Library
cover
Fahmi Firdaus Angkasa
"Pada tahun 2025 pemerintah menargetkan peran energi baru terbarukan (EBT) minimal 23% dari bauran energi nasional ketenagalistrikan. Salah satu jenis EBT adalah panas bumi yang menjadi salah satu potensi yang besar. Berdasakan data Kementiran ESDM, potensi energi panas bumi sebesar 28.579 MWe yang terdiri dari sumber daya sebesar 11.073 MWe dan cadangan sebesar 17.506 MWe. Selain itu berdasarkan RUPTL 2019-2028, komposisi bauran energi listrik regional Sumatera akan mencapai 38,5% bersumber EBT atau mencapai total 2647,1 MW yang terdiri dari air sebesar 20,1%, panas bumi sebesar 19,5%, dan sumber EBT lainnya sebesar 1,9%. Pada tahun 2019-2023, terdapat Pembangkit Listrik Tenaga Panas Bumi (PLTP) yang direncanakan akan memasuki sistem interkoneksi Sumatera Utara pada dengan total kapasitas 240 MW. Oleh karena itu, studi interkoneksi dibutuhkan untuk mengetahui efek dari pembangkit terhadap jaringan interkoneksi dan kesesuaian dengan standar yang ada. Studi interkoneksi yang dilakukan terdiri dari studi aliran daya, studi stabilitas sistem tenaga listrik, dan studi hubung singkat menggunakan perangkat lunak DIgSILENT Power Factory 2019 SP 4. Hasil dari studi aliran daya menunjukan level tegangan pada pembangkit dan dua Gardu Induk (GI) terdekat sesuai dengan aturan yang berlaku pada Aturan Jaringan Sistem Tenaga Listrik Sumatera 2007 2.1.b yang menyebutkan standar tegangan pada jaringan interkoneksi 150 kV harus selalu diantara 135 kV dan 165 kV (±10% tegangan nominal). Selain itu, stabilitas sistem tenaga listrik dilihat dari parameter tegangan, frekuensi dan sudut rotor. Jaringan interkoneksi tetap stabil ketika ada gangguan di salah satu generator pembangkit, gangguan di satu atau dua saluran antara pembangkit dan GI terdekat, dan pelepasan beban di salah satu GI. Ketidakstabilan terjadi ketika dua GI terdekat terisolasi dengan jaringan interkoneksi Sumatera yang menghasilkan pemadaman total. Sementara itu, penambahan kapasitas pembangkit pada sistem interkoneksi 150 kV Sumatera Utara menyebabkan nilai arus hubung singkat di GI meningkat. Seluruh nilai arus hubung singkat masih memenuhi standar IEEE Std C37.06-2009.

In 2025 the government is targeting the renewable energy at least 23% of the national electricity energy mix. One type of renewable energy is geothermal which has a great potential. Based on the Ministry of Energy and Mineral Resources Republic of Indonesia data, the potential for geothermal energy is 28,579 MWe consisting of resources 11,073 MWe and reserves 17,506 MWe. Further based on 2019-2028 RUPTL, the composition of Sumatra's regional electric energy mix will reach 38.5% from renewable sources or reach a total of 2647.1 MW consisting of water 20.1%r, geothermal 19.5%, and other renewable sources by 1.9%. In 2019-2023, there is a Geothermal Power Plant which is planned to enter the North Sumatra interconnection system with a total capacity of 240 MW. Therefore, an interconnection study is needed to determine the effect of the new power plant on the interconnection grid and compliance with the standards. Interconnection studies carried out consist of power flow, stability, and short circuit study using the DIgSILENT Power Factory 2019 SP 4 software. The results of the power flow study show that the voltage level at the power plant and the two closest substations is in accordance with the Grid code Electricity System Power System 2007 2.1.b which states the voltage standard on the 150 kV interconnection grid must always be between 135 kV and 165 kV (± 10% nominal voltage). In addition, the stability of the electric power system can be seen from the voltage, frequency and rotor angle parameters. The grid remains stable when there is a disturbance in one of the power plant generators, disturbance in one or two cables between power plant and the nearest substation, and the release of load in one of the substations. Instability occurs when it is isolated with the Sumatra interconnection grid which results in total blackouts. Meanwhile, the addition of generating capacity through PLTP in the 150 kV North Sumatra interconnection system causes the value of short circuit current in substations increase. All short circuit current still meets IEEE Std C37.06-2009 standard."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>