Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 35714 dokumen yang sesuai dengan query
cover
Ilham Budi Sriutomo
"Kondisi sistem kelistrikan Sumatera Bagian Utara sepanjang tahun 2014 memperlihatkan kekurangan pasokan listrik, kondisi tersebut sangatlah ironis mengingat Provinsi Sumatera Utara mempunyai potensi energi biomassa dari limbah hasil produksi kelapa sawit sebesar 4.248 GWh per tahun. PT Perkebunan Nusantara 3 melalui PLTBS Rambutan telah memanfaatkan limbah padat tersebut untuk dikonversi menjadi listrik dan dijual ke PLN, dimana dari rencana penjualan energi listrik rata-rata 1.051.200 kWh per bulan, hanya terealisasi rata-rata 115.301 kWh. Tidak tercapainya target penjualan listrik, akibat kuranganya suplai bahan bakar dan tidak kontinyu hasil limbah padatnya. Dengan realisasi tersebut, maka diperlukan skenario operasi untuk mendapatkan tingkat pengembalian investasi yang diharapkan Perusahaan. Model keekonomian pemanfaatan limbah padat yang dapat menyelamatkan investasi (NPV>0 dan IRR>14%) yaitu minimum operasi per tahun pada Faktor Kapasitas 79,18% dengan tidak ada biaya bahan bakar. Selain itu, untuk memastikan kontinuitas pasokan bahan bakar perlu mencadangkan selama 7 hari operasi dan frekuensi maintenance boiler pembangkit yang menggunakan serat tankos agar lebih rutin dibandingkan apabila pembangkit menggunakan serat (fibre).

The condition of the electrical system of Northern Sumatra throughout 2014 showed lack of power supply, this condition is ironic considering the North Sumatra province has the energy potential of waste biomass from oil palm production is about 4,248 GWh per year. PT PTPN 3 through PLTBS Rambutan have taken opportunities of the solid waste utilization to be converted into electricity and sold to PLN, where the planned sale of electricity on average 1.0512 million kWh per month, but realization only 115 301 kWh. Not achieving the target of electricity sales, due to the lack of fuel supply and not continuous of solid waste result. With this realization, so needed the operating scenarios to get the expected rate of return by the Company. Economics model of solid waste utilization that can save the investment (NPV> 0 and IRR> 14%) is minimum operation at capacity factor per year at 79.18% and with no fuel costs. In addition, to ensure the continuity of fuel supply, is needed feedstock for 7 days of operation and frequency of boiler maintenance that using empty fruit bunch to be more routine than PLTBS with using fibre."
Depok: Universitas Indonesia, 2015
T43973
UI - Tesis Membership  Universitas Indonesia Library
cover
Adam Rahmadan
"Tanaman Kaliandra merupakan salah satu varian biomassa yang memiliki potensi keekonomian sebagai sumber energi bahan bakar. Untuk menilai keekonomian dari tanaman tersebut maka dianalisis agar mengetahui bagaimana meningkatkan nilai investasi agar dapat memberikan tingkat pengembalian yang baik. Dengan menggunakan disain pembangkit berkapasitas 2 X 7 MW dan periode produksi berlangsung selama 25 tahun dimana setiap tahunnya membutuhkan suplai bahan bakar sebanyak 196.827.882 ton maka berdasarkan hasil perhitungan terbaik dimana target perusahaan (NPV > 0 dan IRR > 6 %) yaitu adalah menggunakan skenario 1 dimana dari rencana penjualan energi listrik ke PLN rata-rata 99.338 MWh dalam setahun. Total pemakaian sendiri dan losses lainnya adalah 10 % dari total kapasitas terpasang yaitu 14.000 kW atau 2 X 7 MW. Total daya yang siap di supply adalah 12.600 kW. Selain itu unuk menjaga ketersediaan pasokan bahan bakar dari resiko - resiko yang ada maka didapatkan kurang lebih 10 % dari total kebutuhan bahan bakar setiap tahunnya. Sehingga berdasar analisis keekonomian yang dilakukan terhadap tanaman kaliandra maka dapat diketahui bahwa tanaman tesebut berpotensi sebagai salah satu sumber energi bahan bakar pembangkit yang baik.

Kaliandra plant is one variant that has the potential economics of biomass as an energy source of fuel. To assess the economic value of the plant is then analyzed in order to determine how to increase the value of the investment in order to provide a good rate of return. By using the plant design capacity of 2 x 7 MW and a production period of 25 years where each year require the supply of fuel as much as 196 827 882 tons and based on the best calculation results where the target company (NPV> 0 and IRR> 6%) which is using scenario 1 which of the proposed sale of electricity to PLN average 99 338 MWh per year. Total use of its
own and other losses is 10% of the total installed capacity is 14,000 kW or 2 x 7 MW. Total power that is ready to supply is 12,600 kW. Moreover transform and maintain the fuel supply of risk - the risk that there are obtained approximately 10% of total fuel needs annually. So based on economic analysis carried out on the plant kaliandra it is known that the plant have a good potential as a source of generating fuel energy."
Depok: Universitas Indonesia, 2016
T45953
UI - Tesis Membership  Universitas Indonesia Library
cover
Tri Sesilia
"[ABSTRAK
Dalam beberapa tahun terakhir ini terjadi krisis energi. Terjadi peningkatan
penggunaan batubara secara besar-besaran beberapa tahun terakhir ini.
Dibutuhkan bahan bakar alternatif pada unit pembangkit tenaga listrik. Dalam
studi ini dilakukan untuk mengoptimalisasikan bahan sisa atau biasa disebut
dengan biomassa menjadi bahan yang berguna untuk kehidupan sehari-hari. Data
penggunaan biomassa di unit pembangkit tenaga listrik sudah banyak dilaporkan
oleh banyak peneliti dan praktisi. Tetapi datanya sangat terbatas. Dalam thesis ini
pengolahan biomassa akan menggunakan proses Hydrotermal Waste Treatment.
Sampel data diambil dari daerah DKI Jakarta untuk dijadikan percontohan
pembuatan pembangkit listrik tenaga uap berbahan bakar biomassa olahan.
Karakteristik penggabungan pembakaran hidrotermal pada Limbah Padat
Perkotaan dan batubara Indonesia sangat mempengaruhi pembakaran.
Pencampuran antara batubara dan limbah akan dicampur dengan tingkatan 10%,
20%, 30% dan 50% (dalam berat.%). Dari hasil pencampuran didapati bahwa
pada pencampuran limbah sebesar 20% dalam pengujian pengapian, karbon dan
burnout adalah pencampuran yang sangat optimal. Bahkan ada yang lebih baik
daripada campuran batubara Indonesia, yang menunjukkan kelayakan untuk
membantu mengurangi konsumsi batubara Indonesia dengan hidrotermal
menggunakan Limbah Padat Perkotaaan.
Dengan menggunakan teknologi pengkonversian energi, maka energi ini
dapat digunakan untuk menghasilkan energi listrik dan limbah padat perkotaan
sebagai sumber bahan bakar utama dari PLTU.

ABSTRACT
In recent years the energy crisis occurs. There is an increased use of coal on
a large scale last few years. It takes an alternative fuel in the power plant unit. In
this study conducted to optimize the residue or commonly called biomass into
useful materials for everyday life. Data on the use of biomass in power generation
units has been widely reported by many researchers and practitioners. But the data
are very limited. In this thesis will use a biomass processing Hydrotermal Waste
Treatment process. Samples of data taken from the Jakarta area to be used as a
pilot manufacturing of steam power plant of processed biomass fuel.
Incorporation combustion characteristics of hydrothermal on Municipal Solid
Waste and Indonesian coal greatly affect combustion. Mixing between coal and
waste will be mixed with a level of 10%, 20%, 30% and 50% (by weight.%).
From the results of mixing was found that the mixing of waste by 20% in testing
ignition, carbon and burnout is a very optimal mixing. In fact, there is have better
than the mix of Indonesian coal, which demonstrate the feasibility to help
Indonesia reduce coal consumption by hydrothermal using urban Solid Waste.
By using energy conversion technologies, then this energy can be used to
generate electrical energy and municipal solid waste as a primary fuel source of
the power plant., In recent years the energy crisis occurs. There is an increased use of coal on
a large scale last few years. It takes an alternative fuel in the power plant unit. In
this study conducted to optimize the residue or commonly called biomass into
useful materials for everyday life. Data on the use of biomass in power generation
units has been widely reported by many researchers and practitioners. But the data
are very limited. In this thesis will use a biomass processing Hydrotermal Waste
Treatment process. Samples of data taken from the Jakarta area to be used as a
pilot manufacturing of steam power plant of processed biomass fuel.
Incorporation combustion characteristics of hydrothermal on Municipal Solid
Waste and Indonesian coal greatly affect combustion. Mixing between coal and
waste will be mixed with a level of 10%, 20%, 30% and 50% (by weight.%).
From the results of mixing was found that the mixing of waste by 20% in testing
ignition, carbon and burnout is a very optimal mixing. In fact, there is have better
than the mix of Indonesian coal, which demonstrate the feasibility to help
Indonesia reduce coal consumption by hydrothermal using urban Solid Waste.
By using energy conversion technologies, then this energy can be used to
generate electrical energy and municipal solid waste as a primary fuel source of
the power plant.]"
2015
T45268
UI - Tesis Membership  Universitas Indonesia Library
cover
Nino Teguh Pamuji
"Salah satu struktur biaya dalam industri pembangkit tenaga listrik adalah bahan bakar. Harga bahan bakar minyak yang relatif tinggi telah menyebabkan biaya pembangkitan atau Cost of Electricity (COE) dari pembangkit yang menggunakan bahan bakar minyak seperti MFO menjadi tinggi, sehingga konsumsi bahan bakar MFO pada PLTU minyak diturunkan, hal tersebut mengakibatkan kapasitas listrik yang dibangkitkan oleh PLTU minyak cenderung turun setiap tahunnya. Alternatif bahan bakar yang lebih murah untuk PLTU minyak diperlukan, salah satu alternatif bahan bakar yang dapat digunakan adalah Coal Water Mixture (CWM), yaitu Coal Slurry berupa campuran antara batubara dan air serta zat aditif yang berbentuk suspensi kental yang dapat menggantikan minyak bakar berat MFO (Marine Fuel Oil) yang biasa digunakan di industriindustri yang menggunakan boiler sebagai penghasil uap untuk proses maupun untuk pembangkit listrik. Untuk dapat memanfaatkan CWM, modifikasi pada boiler pembangkit perlu dilakukan.
Penelitian ini bertujuan menganalisa kelayakan pemanfaatan CWM pada PLTU serta batasan setiap parameternya agar prinsip "to produce electricity at the lowest possible cost" tetap terpenuhi. Analisis yang digunakan pada penelitian ini adalah metode probabilistik dengan simulasi Monte Carlo. Penelitian ini berhasil membuktikan bahwa pemanfatan CWM pada PLTU layak dilakukan dan dapat menurunkan biaya pembangkitan listrik pada PLTU.

One of structure of cost on power generation industry is fuel. The price of oil fuel which relatively high has make the Cost of Electricity (COE) of the Power Generation that using MFO as the fuel has become higher too, therefore the consumption of MFO on the steam turbine power plant has been decreased every year, these situation has cause the electricity that being generate by Steam turbine power plants is getting lower every year. Fuel alternative which is more cheaper for steam turbine power plant is needed, one of the fuel alternative that can be used is Coal Water Mixture (CWM), a coal slurry that a mix of coal and water and additives in a form of suspension which can be used as a replacement of MFO (Marine Fuel Oil) in Indutries that have boiler to produce steam for process or for power generation. In order to utilize CWM, a modification on the boiler of the existing steam turbine power plant is required.
This study has purpose to analyze the feasibility of CWM utilization on steam turbine power plant and the boundary of each parameters so the principle "to produce electricity at the lowest possible cost" can be achieved. In order to analyze each parameters this reasearch is using probabilistic methode by monte carlo simulation. This reasearch has proving that the utilization of CWM on steam turbine power plant is feasible to apply and it can reduce the power generation cost on steam turbine power pkant."
Depok: Universitas Indonesia, 2015
T44441
UI - Tesis Membership  Universitas Indonesia Library
cover
Novan Akhiriyanto
"ABSTRAK
Kepulauan Selayar sebagai salah satu Kabupaten penghasil kelapa beserta kopra terbesar di Provinsi Sulawesi Selatan memiliki potensi energi dari limbah industri kopra yang cukup besar berupa tempurung dan sabut kelapa. PLTD berbahan bakar BBM merupakan satu-satunya pemasok energi listrik di Selayar, sehingga biaya pembangkitan listrik relatif lebih mahal dibanding dengan menggunakan bahan bakar fosil lainnya dan juga menimbulkan permasalahan emisi gas buang. Pemanfaatan limbah industri kopra sebagai bahan bakar pembangkitan listrik merupakan alternatif yang ditawarkan dalam studi ini. Pembangkit listrik tenaga gasifikasi biomassa PLTGBm dengan reaktor downdraft gasifier menghasilkan gas mudah terbakar yang digunakan sebagai bahan bakar generator mesin gas untuk menghasilkan energi listrik diterapkan dengan 2 dua skenario pengoperasian, yaitu untuk membantu memikul beban siang 16 jam operasi dengan faktor kapasitas CF sebesar 66,67 dan beban malam 8 jam operasi dengan CF sebesar 33,33 . Potensi daya listrik dengan CF 66,67 sebesar 730 kW dari PLTGBm tempurung mempunyai kontribusi pembangkitan listrik mencapai 12,47 dalam memikul beban listrik pada April 2017 dengan potensi penghematan biaya bahan bakar menggantikan biaya pengadaan BBM untuk pembangkitan listrik sebesar Rp. 29.101.125,80 dan 1.470 kW dari PLTGBm sabut mempunyai kontribusi mencapai 25,10 dengan potensi penghematan sebesar Rp. 58.618.416,79. Sedangkan potensi daya listrik dengan CF 33,33 sebesar 1.470 kW dari PLTGBm tempurung mempunyai kontribusi mencapai 14,14 dengan potensi penghematan sebesar Rp. 19.462.180,74 dan 2.950 kW dari PLTGBm sabut mempunyai kontribusi mencapai 28,38 dengan potensi penghematan sebesar Rp. 39.063.083,22. Analisis kelayakan ekonomi juga diperhitungkan dalam studi, ditemukan bahwa PLTGBm tempurung 730 kW dan PLTGBm 1.470 kW layak untuk dikembangkan untuk memikul beban siang sedangkan PLTGBm tempurung 1.470 kW dan PLTGBm 2.950 kW tidak layak secara keekonomian.54

ABSTRACT
Selayar Islands as one of the largest copra producing district in South Sulawesi province has large enough the potential of energy from copra industry waste in the form fo coconut shell and husk. Diesel generator is the primary supplier of electricity in Selayar, so that the cost of power generation is relatively more expensive than using other fossil fuels and also raises the problem of emissions. Utilization of copra industry waste as fuel for electricity generation is an alternative offered in this study. Biomass gasification power plant PLTGBm with reactor downdraft gasifier produce flammable gas used as fuel gas engine generator to generate electrical energy is applied to the 2 two scenarios of operation, which is to help carry the day load 16 operation hours by a capacity factor CF of 66.67 and night load 8 operation hours with CF of 33.33 . Electric power potential with CF 66.67 amounting to 730 kW of PLTGBm shell contributes power generation to 12.47 in the burden of electricity load in April 2017 with the potential fuel cost savings offset the cost of procurement of oil fuel for electricity generation amounted to Rp. 29.101.125,80 and 1,470 kW from PLTGBm husk have contribution to 25,10 with the potential of savings amount Rp. 58.618.416,79. While the potential of electric power with CF 33.33 of 1470 kW from PLTGBm shell has a contribution to 14.14 with a potential savings of Rp. 19.462.180,74 and 2,950 kW from PLTGBm husk have contributed to 28.38 with a potential savings of Rp. 39.063.083,22. Economic feasibility analysis is also taken into account in the study, it was found that the shell PLTGBm 730 kW and 1,470 kW PLTGBm are feasible to be developed to carry the load during PLTGBm shell while 1,470 kW and 2,950 kW PLTGBm unfeasible economically.55"
2017
T47936
UI - Tesis Membership  Universitas Indonesia Library
cover
M. Fajri Jufri
"ABSTRAK
Rasio elektrifikasi di Provinsi Jambi merupakan yang terendah di Sumatera dengan rasio eletrifikasi sebesar 39,59 . Dibutuhkan adanya tambahan energi listrik di daerah Jambi, terutama di daerah yang belum terjangkau energi listrik salah satunya adalah dengan memanfaatkan biogas yang berasal dari limbah cair pengolahan kelapa sawit atau sering disebut Palm Oil Mill Effluent POME , menjadi energi listrik. Sebagaimana diketahui kelapa sawit merupakan komoditas perkebunan yang terbesar di jambi, limbah cair dari pengolahan kelapa sawit masih belum dimanfaatkan hanya ditampung pada kolam terbuka yang dapat menyebabkan terbentuknya emisi gas rumah kaca. Pada penelitian ini akan digunakan data-data dari salah satu perkebunan kelapa sawit di Jambi, dengan produksi POME sekitar 144.859 ton/tahun. Dengan COD sebesar 64.005 mg/l. Berdasarkan kajian teknologi yang dilakukan dipilih tipe bioreaktor anaerob jenis Continues Stirred Tank Reactor CSTR dengan volume bioreaktor sebesar 2808 m3 dan HRT selama 6,79 hari . Digunakan simulasi untuk memprakirakan proses dan hasil yang terjadi pada sistem Pembangkit Listrik Biogas dari POME PLTBg POME .Berdasarkan hasil simulasi bahan baku POME sebesar 167766 kg/jam dapat menghasilkan 2777 kg/jam. Hasil simulasi Gas Engine menghasilkan energi listrik sebesar 1050 kW. Produksi biogas sebesar 2.988.889 m3/ tahun, serta energi listrik yang dihasilkan sekitar 5380 MWh per tahunnya.Nilai investasi sekitar 3.663.119 USD dapat menarik para investor jika harga jual tarif listrik diwilayah sumatera lebih dari 1.500 IDR/kWh, dengan IRR sebesar 11,2 dan NPV sebesar USD 43.010. dan payback period sekitar 8 tahun.

ABSTRACT
Electrification ratio Jambi Province is the lowest in Sumatra with eletrification ratio around to 39.59 . Needed the addition of electrical energy in Jambi, especially in areas which not reached by electricity. One of choice is using biogas derived from liquid waste from palm oil mill or called Palm Oil Mill Effluent POME into electrical energy.As it is known palm oil is the largest plantation commodity in Jambi, liquid waste from palm oil mill is still not used only accommodated in open ponds which can lead to the formation of greenhouse gas emissions.In this research will be using data from one of the oil palm plantations in Jambi, with POME production about 144 859 tonnes year. With COD 64 005 mg l. Based on studies conducted chosen technology type anaerobic bioreactor types Continues Stirred Tank Reactor CSTR with volume of bioreaktor 2808 m3 and HRT for 6,79 days Using a simulation to predict the processes and outcomes that occur on the system of POME Biogas Power Plant PLTBg POME .Based on simulation results feed POME 16766 kg hour will be produce methane 2777 kg hour, it can be generate electicity 1050 kW.Biogas production amounted to 2,988,889 m3 year, and the electrical energy produced approximately 5380 MWh per year.Investment value approximately 3,663,119 , will be attractive for investors if the sale price of electricity tariffs in the region of Sumatra more than 1,500 IDR kWh, with an IRR of 11 2 and a NPV of USD 43 010. and payback period of about 8 years.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T49684
UI - Tesis Membership  Universitas Indonesia Library
cover
Moch Zulfikar Eka Prayoga
"Indonesia sebagai negara kepulauan masih mengandalkan Pembangkit Listrik Tenaga Diesel (PLTD) untuk elektrifikasi 111 pulau terluar dan daerah pedesaan terpencil. Dengan total produksi 41.7 juta ton CPO pada akhir 2018, Indonesia menjadi produsen Crude Palm Oil (CPO) terbesar di dunia. Saat ini, sudah tersedia teknologi Pembangkit Listrik Tenaga nabati Crude Palm Oil (PLTBn CPO) yang menggunakan 100% CPO. Dalam penelitian ini, dilakukan perbandingan biaya bahan bakar high speed diesel (HSD) yang digunakan pada PLTD, dengan CPO yang digunakan pada PLTBn CPO. Dengan memperhitungkan komponen harga pembelian dan biaya pengiriman untuk HSD, sedangkan CPO diperoleh dari perkebunan setempat (tanpa biaya transportasi). Hasilnya, harga pembelian HSD sebesar IDR 22,245/liter di Oksibil, Papua, menghasilkan biaya produksi pembangkitan PLTD sebesar IDR 6,386/kWh. Jika menggunakan CPO dengan harga pembelian sebesar IDR 7,334/liter (tanpa biaya transportasi), diperoleh biaya produksi pembangkitan PLTBn CPO sebesar IDR 2,760/kWh. Sehingga, biaya produksi pembangkitan PLTBn CPO lebih murah dibandingkan PLTD. Tetapi di beberapa tempat lain, seperti di Pulau Subi, Kepulauan Riau, harga HSD sebesar IDR 8,853/liter, menghasilkan biaya produksi pembangkitan PLTD IDR 2,660/kWh. Sedangkan harga CPO sebesar IDR 7,334/liter, menghasilkan biaya produksi pembangkitan PLTBn CPO sebesar IDR 2,760/kWh. Yang ternyata, biaya pembangkitan PLTD lebih murah dibandingkan PLTBn CPO. Dengan kondisi ini, dapat disimpulkan bahwa pedesaan terpencil dan pulau terluar di Papua lebih diutamakan memanfaatkan CPO daripada HSD. Sehingga diharapkan dapat mengurangi impor HSD.

Indonesia as an archipelago country still relies on Diesel Power Plants (PLTD) for electrification of remote areas. With total production of 41.7 million tons at 2018, Indonesia become the largest Crude Palm Oil (CPO) producer in the world. Currently, technology of Crude Palm Oil Fired Power Plant (PLTBn CPO) is available which uses 100% CPO. This study compared high speed diesel (HSD) fuel price used in PLTD, with CPO used in PLTBn CPO. By calculating purchase price and shipping cost for HSD, while CPO obtained from local plantation (without shipping cost). As a result, HSD purchase price IDR 22,245/liter in Oksibil, Papua, resulted generation cost IDR 6,386/kWh. If using CPO with purchase price IDR 7,334/liter, obtained generation cost IDR 2,760/kWh. Thus, generation cost of PLTD is more expensive than PLTBn CPO. But in other places, on Subi Island, Riau, HSD purchase price IDR 8,853/liter, resulted generation cost IDR 2,660/kWh. Whereas, using CPO IDR 7,334/liter, resulted generation cost IDR 2,760/kWh. Evidently in Subi island, PLTD generation cost is cheaper than PLTBn CPO. With this condition, it can be concluded that remote areas with high shipping cost, such as Papua, are preferred to use CPO rather than HSD, to reduce HSD import."
Depok: Fakultas Teknik Universitas Indonesia, 2019
T52917
UI - Tesis Membership  Universitas Indonesia Library
cover
Indah Prihastuti
"ABSTRAK
Pembangkit Listrik Tenaga Sampah (PLTSa) merupakan pembangkit listrik yang
ramah lingkungan yang dapat mengatasi masalah tingginya pertumbuhan sampah
di Indonesia sekaligus memenuhi kebutuhan listrik untuk masyarakat.
Berdasarkan grafik dari kedua model estimasi produksi metana, produksi gas
metana dan laju penurunannya berbeda untuk setiap komposisi dan jenis sampah.
Produksi gas metana menentukan banyaknya listrik yang dihasilkan yang pada
akhirnya mempengaruhi besarnya pendapatan. Oleh karena itu, penentuan waktu
untuk membangun PLTSa menjadi faktor penting untuk diperhatikan karena dapat
mempengaruhi layak atau tidaknya investasi. Penelitian ini menggunakan sampah
padat rumah tangga dan sampah padat industri kelapa sawit yang dibedakan
menjadi 5 skenario komposisi sebagai bahan baku untuk PLTSa dan
menggunakan dua model estimasi produksi metana, yaitu model US EPA dan
model EPER France. Analisis kelayakan investasi yang dilakukan menggunakan
metode NPV, IRR, dan Payback Period. Setelah dilakukan simulasi pembangunan
PLTSa dengan adanya penundaan waktu dalam membangun, maka untuk skenario
1,4, dan 5, waktu untuk membangun PLTSa yang masih layak dan memberikan
keuntungan adalah dalam range tahun pembangunan awal 2014-2015, sedangkan
untuk skenario 2 dan 3 dalam range tahun pembangunan awal 2014-2018 dimana
pada tahun tersebut NPV masih bernilai positif. Sedangkan nilai NPV tertinggi
untuk semua skenario adalah pada tahun 2014 atau tahun tercepat PLTSa dapat
dibangun.
ABSTRACT
Waste Power Plant (PLTSa) is an environmentally friendly power plant that can
overcome the problem of waste growth in Indonesia as well as meet the electricity
needs for the residents. Based on the graphs from the two models for estimating
methane generation, methane generation and the rate of decline is different for
each composition and type of waste. Methane generation determine the amount of
electricity that is generated which eventually affects the income. Therefore, the
determination of time to build PLTSa is an important factor to consider because it
can affect the feasibility of investment. This study uses municipal solid waste and
industrial palm solid waste which is divided into 5 composition scenarios as
feedstock for PLTSa and uses two models for estimating methane generation, the
U.S. EPA and EPER France model. Investment feasibility analysis is performed
using the method of NPV, IRR, and Payback Period. After doing the simulation of
construction PLTSa with a delay time in build, then for scenario 1, 4, and 5, a
time to build PLTSa which still feasible and provide profit is in the range of early
construction years from 2014 to 2015, while for scenario 2 and 3 in range of early
construction years from 2014 to 2018 where the NPV is still positive in that year.
And the highest NPV value for all scenarios is in 2014 or the fastest year PLTSa
can be built."
Fakultas Teknik Universitas Indonesia, 2013
T36076
UI - Tesis Membership  Universitas Indonesia Library
cover
Citra Kusumadewi
"Salah satu pemanfaatan gas suar bakar adalah sebagai bahan bakar pembangkit. Pembangkit Listrik X adalah PLTGU existing yang menghasilkan daya listrik 410 MW dengan menggunakan bahan bakar gas alam sebanyak 87,74 MMSCFD. Pada penelitian ini gas suar bakar akan dijadikan bahan bakar pengganti gas alam untuk membangkitkan listrik 410 MW. Total maksimum laju alir gas suar bakar yang tersedia adalah 7,9 MMSCFD. Pemanfaatan gas suar bakar sebagai bahan bakar pembangkit listrik akan menurunkan biaya bahan bakar namun juga menambah biaya investasi berupa alat kompresor.
Dalam penelitian ini dilakukan dua skenario, yaitu skenario existing menggunakan bahan bakar gas alam dan skenario menggunakan variasi laju alir gas suar bakar terhadap laju alir gas alam sebagai bahan bakar Pembangkit Listrik X. Skenario yang paling memberikan keuntungan dari pada desain existing adalah saat menggunakan laju alir gas suar bakar sebesar 7,9 MMSCFD dengan laju alir gas alam sebesar 79,06 MMSCFD. NPV skenario desain tersebut 56.976.160,22 dengan pay back period 14,84 tahun.

Utilization of flare gas is as fuel for power plants. Power plant X is the existing gas and steam power plant that generates 410 MW of electrical power using natural gas fuel as much as 87.74 MMSCFD. In this study flare gas will be used as fuel instead of natural gas to generate 410 MW of electricity. The maximum total flare gas flow rate provided is 7.9 MMSCFD. Utilization of flare gas as power plant fuel will reduce fuel costs but also add to the cost of investment of compressor tool.
In this study two scenarios will be compared, the existing scenarios using natural gas fuel and scenarios using a variation of the flow rate of gas flaring on the flow rate of natural gas as fuel for power plants X. Scenario would benefit from the existing design are currently using flow rate gas flare 7,9 MMSCFD and natural gas with flow rate 79,06 MMSCFD. The design scenarios NPV is 56.976.160,22 with a payback period of the plant investation is 14,84 years.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T47340
UI - Tesis Membership  Universitas Indonesia Library
cover
Stefanus Wisnu Nusantoro
"ABSTRAK
Kabupaten Kepulauan Selayar sangat mengandalkan kelapa sebagai salah
satu komoditas utama sektor perkebunan. Banyak industri pengolahan kelapa yang
berkembang di Selayar, salah satunya adalah industri kopra. Masih banyak
pengolahan kopra yang dilakukan secara tradisional dengan mutu yang rendah dan
proses produksi yang lama hingga 7 hari. Limbah industri kopra berupa tempurung
dan sabut kelapa yang hanya ditumpuk dan tidak dikelola dengan baik dapat
mengakibatkan timbul permasalahan lingkungan. Oleh karenanya, limbah kopra
yang tidak ada nilainya perlu dimanfaatkan untuk menjadi sesuatu yang mempunyai
nilai tambah bagi produktivitas industri kopra. Limbah kopra digunakan sebagai
bahan bakar pembangkit listrik tenaga biomassa dengan cara gasifikasi sehingga
dapat menghasilkan energi listrik. Disamping itu panas buang dari pembangkit
digunakan untuk proses pengeringan kopra dalam rangka meningkatkan mutu dan
produksi kopra. Pada industri kopra skala kecil dengan kapasitas produksi 2.000 kg
didapatkan limbah kopra sebesar 857,14 kg tempurung dan 2.500 kg sabut.
Kapasitas daya pembangkit yang diperoleh adalah sebesar 53,07 kW dan daya
pengeringan kopra sebesar 48,51 kW dengan waktu beroperasi selama 14 jam.
Mampu dihasilkan kopra sebanyak 293.504,51 kg dan produksi listrik sebesar
173.560,30 kWh dalam setahun.

ABSTRACT
Kepulauan Selayar Regency relies on coconut as one of the main
commodities in the plantation sector. Many coconut processing industries are
growing in Selayar, one of which is the copra mill. There is still a lot of copra
processing done traditionally with low quality and long production process up to
7 days. The copra waste, coconut shell and husk, which is only stacked and not
managed properly can cause environmental problems. Therefore, unnecessary
copra wastes need to be utilized to be something of added value to the
productivity of the copra. Copra waste is used as a fuel for biomass power
generation by means of gasification so that it can generate electrical energy.
Besides, the exhaust heat from the plant is used for copra drying process in order
to improve the quality and production of copra. In the small-scale copra industry
with a production capacity of 2,000 kg obtained copra waste of 857.14 kg shell
and 2,500 kg of husk. The generated power capacity is 53.07 kW and copra
drying capacity is 48.51 kW with 14 hours operating time. Able to produce copra
as much as 293,504.51 kg and electricity production of 173,560.30 kWh in a year."
2017
T45122
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>