Yusuf Abdurachman
"ABSTRAK
Proyek infrastruktur Jalan Tol Trans Sumatera (JTTS) direncanakan membentang
dari Bakauheni-Banda Aceh dengan perkiraan investasi sebesar Rp290 Triliun.
Studi rekayasa nilai tambah dilakukan pada proyek JTTS dengan menambahkan
enam fungsi, yaitu integrasi jalur sepeda motor, pengembangan rest area, integrasi
dry port, integrasi kereta median tol, pengembangan area periwisata dan
penambahan jaringan fiber optik. Penelitian bertujuan untuk mengetahui kelayakan
finansial dari rekayasa fungsi tambah proyek JTTS. Analisis kelayakan dilakukan
menggunakan pendekatan sistem dinamik terhadap tiga skenario tarif. Dari hasil
penelitian didapatkan hasil Internal Rate of Return untuk ketiga skenario tarif, yaitu
8.28%, 12.71% dan 13.77%.

ABSTRACT
Infrastructure project of Trans Sumatra Toll Road (JTTS) are planned stretch from
Bakauheni to Banda Aceh with an estimated investment of IDR 290 Trillion. Value
Engineering studies have been done on the project JTTS by adding six additional
functions, that are integration of the motor bike paths, rest area development,
integration of the dry port, rail way integration on median toll, development of
tourism areas, and integration of fiber optic networks . The study aims to determine
the financial feasibility of the additional functions JTTS. The feasibility analysis is
performed using a dynamic systems approach to the three tariff scenarios. The study
got the results that Internal Rate of Return for the three tariff scenarios are 8.28%,
12.71% and 13.77%.;"
2015
T44710
UI - Tesis Membership  Universitas Indonesia Library
cover
Mohammed Ali Berawi
"The Trans-Sumatera Toll Road (TSTR) Infrastructure Project is planned to stretch from Bakauheni to Banda Aceh (2527 kilometers), with an estimated investment about IDR 290 trillion. The value engineering method is applied to the TSTR project by creating six additional functions for a toll road: motorcycle lane integration, rest area development, dry port integration, median railways integration, tourism park development, and fiberoptic networking. The feasibility analysis is constructed using a system dynamic approach to three toll tariff scenarios. The result reveals that the additional functions have improved the financial feasibility of TSTR project, with the internal rate of return for the three proposed scenarios ranging from 8.28% to 13.77%"
Depok: Faculty of Engineering, Universitas Indonesia, 2015
UI-IJTECH 6:3 (2015)
Artikel Jurnal  Universitas Indonesia Library
cover
A. Jefry
"ABSTRAK
Prior to a process of public infrastructure from both the Government and the private sector, it was decided to be carried out under a PPP scheme, at a time when an evaluation of Value for Money VfM was required. VfM by Moralos and Amekudzi 2008 as the optimum combination of all lifetime cost and quality costs to meet user demand. According to Pangeran 2010 , in a few circumstances where VfM has been calculated using conventional methods rather than projects, only financially. By using this method, it can not benefit optimally from. Referring to the case of the election of modalities to infrastructure projects in Indonesia, the modalities of the Trans Sumatera toll road project have been decided by the Government to be implemented by a SOE. From the VfM test for Palembang Indralaya Toll Road shows the modalities that produce the optimal value for money is the appointment of a BUMN that is equal to 46 . Thus, the Government 39;s decision is considered to appropriately appoint a BUMN to carry out the construction of the Palembang-indralaya trans-Sumatra toll road.

ABSTRACT
Sebelum suatu proyek infrastruktur publik baik yang berasal dari Pemerintah APBN APBD maupun dari inisiatif pihak swasta, diputuskan untuk dilakukan dengan skema KPBU, pada dasarnya terlebih dahulu perlu dilakukan sebuah evaluasi, yaitu Value for Money VfM analysis. VfM didefinisikan oleh Moralos dan Amekudzi 2008 sebagai kombinasi optimum dari seluruh biaya pada siklus hidup dan kualitas bertujuan untuk pemenuhan permintaan pengguna. Menurut Pangeran 2010 , pada sedikit kasus dimana VfM telah diperhitungkan menggunakan metode konvensional yaitu belum memperhitungkan risiko proyek, dan hanya memperhatikan dari sisi finansial saja. Pengujian dengan metode konvensional tersebut, dapat berdampak tidak optimalnya manfaat dari pengadaan proyek publik. Mengacu pada kasus pemilihan skema modalitas terhadap proyek infrastruktur di Indonesia, skema modalitas proyek jalan tol Trans Sumatera telah diputuskan oleh Pemerintah melalui Perpres 100 tahun 2014 untuk dilaksanakan oleh suatu BUMN. Dari uji VfM untuk Jalan Tol Palembang Indralaya menunjukkan modalitas yang menghasilkan value for money yang optimal adalah dengan penunjukan suatu BUMN yaitu sebesar 46 . Sehingga, keputusan Pemerintah dinilai sudah tepat menunjuk suatu BUMN untuk melaksanakan pembangunan jalan tol trans sumatera ruas Palembang indralaya"
2017
T48625
UI - Tesis Membership  Universitas Indonesia Library
cover
Yoga Tri Anggoro
"Peningkatan jumlah kendaraan meningkat dengan cepat namun hal ini tidak sejalan dengan peningkatan jumlah dan panjang jalan, sehingga sering terjadi kepadatan kendaraan di suatu ruas jalan khususnya di jalan tol pada periode waktu puncak (peak hour). Penelitian ini bertujuan untuk mengkaji penerapan tarif tol dinamis dalam mengurai kepadatan jalan tol. Penelitian ini menggunakan variabel – variabel yang membentuk besaran dan waktu penerapan tarif dinamis antara lain tingkat kepadatan jalan tol, Ability-To-Pay (ATP), Willingness-To-Pay (WTP) serta tingkat sensitifitas tarif terhadap volume lalu lintas. Penelitian ini menemukan bahwa penerapan tarif dinamis di jalan tol dapat merubah pola serta waktu perjalanan pengguna jalan tol. Penerapan tarif dinamis ini dapat mengurai kepadatan yang terjadi pada periode waktu puncak.

The number of vehicles is increasing rapidly, but this is different from the rise in the number and length of roads, so there is often a density of vehicles on the road, especially on toll roads during peak hours. The objective of this research is to examine the application of dynamic toll tariffs in reducing toll road congestion. This research used variables that determine the amount and timing of dynamic tariffs, including the level of toll road density, Ability to Pay (ATP), Willingness to Pay (WTP), and tariff sensitivity to traffic volume. The result shows that applying dynamic tariffs on toll roads can change users' patterns and travel time. In addition, this dynamic tariff can break down the density of toll road during peak hours."
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Haikal Syarief
"ABSTRAK
Biaya investasi yang tinggi untuk proyek infrastruktur termasuk jalan tol membuat pemerintah mencari skema pendanaan baru dengan tidak membebankan seluruh anggaran pembangunan jalan dari APBN. Oleh karena itu, diperlukan alternatif skema pendanaan untuk mendanai dan mengembangkan jalan tol di Indonesia terutama pada Jalan Tol Trans Sumatera JTTS . Terdapat skema pendanaan baru untuk dapat menjawab permasalahan tersebut, yaitu skema pendanaan Deep Discount Bond DDB dapat diimplementasikan di Indonesia, dan berpotensi positif bagi pembangunan jalan tol di Indonesia. Skema pendanaan baru dapat menimbulkan permasalahan baru, namun untuk memastikan skema tersebut dapat diterapkan, model kelembagaan diperlukan untuk mengatur keterlibatan para stakeholder. Penelitian ini memiliki tiga tujuan, yaitu mengidentifikasi stakeholder yang terlibat dalam skema pendanaan DDB; mengidentifikasi faktor kesuksesan model kelembagaan DDB; dan menentukan model kelembagaan pendanaan DDB untuk JTTS. Dalam metodologi penelitian ini, pengumpulan data dilakukan dengan in-depth interview dengan tiga tahapan, dan dianalisis dengan menggunakan Relative Importance Index dan Analisa Multi Kriteria. Hasilnya, sepuluh stakeholder telah diidentifikasi berserta perannya, didapatkan sepuluh faktor kesuksesan kelembagaan dan diperoleh model kelembagaan untuk dapat mengimplementasikan skema pendanaan DDB untuk JTTS.

ABSTRACT
High investment for infrastructure projects including toll road makes government seek new funding scheme without charging the entire budget of road construction from the State Budget. Therefore, an alternative funding scheme is needed to attract investors to fund and to develop toll road in Indonesia especially at Trans Sumatera Toll Road TSTR . There is new funding to answer that problem, the Deep Discount Bond DDB funding scheme can be implemented in Indonesia, and potentially positive for development of toll road in Indonesia. New funding scheme can address new issue, but to ensure the scheme can be implemented, institutional model is needed to regulate the involvement of the stakeholders. This research has three aims i.e. identify the stakeholders involved in providing DDB funding schemes identify the success factors for DDB institutional model and determine appropriate institutional model for DDB funding scheme for TSTR. In this research methodology, collection data with in depth interview with three phase and analyzed with Relative Importance Index and Multi Criteria Analysis. For the result, ten stakeholders have identified with their roles, ten institutional success factors and obtained institutional funding model to implement DDB for TSTR."
2017
T48061
UI - Tesis Membership  Universitas Indonesia Library
cover
Fasya Nazhirah Lukitaputri
"Penelitian ini mengangkat studi kasus jalan tol Cisumdawu. Cileunyi - Sumedang – Dawuan atau Cisumdawu terletak di Jawa Barat. Pembangunannya dimulai pada tahun 2017 dan direncanakan dapat beroperasi penuh pada tahun 2019. Namun, karena masalah pembebasan lahan dan pandemi COVID-19, pengoperasian jalan tol Cisumdawu tertunda selama kurang lebih tiga tahun, sehingga berdampak negatif pada profitabilitas proyek. Menyikapi kondisi tersebut, penelitian ini bertujuan untuk menilai dan mengevaluasi kembali kelayakan investasi Jalan Tol Cisumdawu dengan mempertimbangkan variabel risiko dan ketidakpastian dengan menggunakan metode Discounted Cash Flow (DCF) dan simulasi Monte Carlo. Analisis tersebut menggunakan beberapa kriteria atau indikator kelayakan, yaitu Net Present Value (NPV), Internal Rate of Return (IRR), dan Payback Period. Hasil analisis kelayakan menunjukkan bahwa proyek Cisumdawu masih layak untuk dilaksanakan dengan nilai NPV sebesar Rp1.431.749.000.000, IRR sebesar 6,4%, dan Payback Period selama 23,3 tahun. Hasil penelitian menunjukkan bahwa kelayakan investasi menurun ketika dihadapkan pada risiko dan ketidakpastian. Hasil analisis juga menunjukkan bahwa risiko yang paling signifikan mempengaruhi kelayakan investasi adalah volume lalu lintas. Tiga skenario tambahan dirancang untuk mengeksplorasi berbagai potensi hasil dan menilai kelayakan finansial proyek dalam berbagai kondisi.

This research uses the case study of Cisumdawu toll road. Cileunyi - Sumedang - Dawuan or Cisumdawu toll road is located in West Java. The construction started in 2017 and was expected to fully operate in 2019. Unfortunately, due to land acquisition issues and COVID-19 pandemic, the Cisumdawu toll road operation has been delayed by approximately three years, thus negatively impacting the project’s profitability. In response to this condition, this research aims to assess and re-evaluate the feasibility of Cisumdawu Toll Road investment by considering risks and uncertainty variables using Discounted Cash Flow (DCF) and Monte Carlo simulation. The analysis uses several criteria or indicators of feasibility, Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period. The result of the feasibility analysis shows that the Cisumdawu project is still feasible with a NPV of Rp1.431.749.000.000, an IRR of 6,4%, and a Payback Period of 23,3 years. The results shown that the investment feasibility decreases when faced with risks and uncertainties. It also shows that the most significant risk affecting the investment feasibility is the traffic volume. Three additional scenarios are designed to explore different potential outcomes and assess the project's financial feasibility under various conditions."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dicky Hadinata
"Salah satu penyebab kemacetan di Jakarta adalah antrian pada pintu-pintu masuk dan keluar jalan tol. Penelitian ini ditujukan untuk perubahan kebijakan jalan tol menjadi freeway pada jalan tol dalam kota Jakarta, khususnya ruas tol Cawang-Tomang. Dalam upaya penetapan freeway pada ruas tol Cawang-Tomang, penulis mengkaji aspek finansial ruas tol melalui pendekatan ekonomi teknik untuk melakukan analisis pengembalian investasi, menghitung nilai bisnis dan saham ruas tol yang perlu dibayarkan oleh pemerintah kepada pihak PT. Jasa Marga Tbk untuk mengambil alih ruas tol tersebut. Penulis juga menghitung panjang antrian kendaraan yang terjadi sekarang pada pintu-pintu masuk tol ruas Cawang-Tomang menggunakan pendekatan teori antrian, dimana antrian tersebut diharapkan akan hilang saat freeway diimplementasikan. Strategi-strategi yang efektif pada penetapan freeway ruas tol Cawang-Tomang diharapkan juga mampu mengatasi permasalahan kemacetan yang terjadi di Jakarta.

One of the causes of traffic congestion in Jakarta is the queue at the entrances and exit the toll road. This study aimed to transform toll road policy into freeway in the city of Jakarta, particularly the toll road Cawang-Tomang. In an effort determining freeway on Cawang-Tomang section, the author examines the financial aspects of the toll road through engineering economics approach to analyze the return on investment, calculating the value of the business and share the toll roads that need to be paid by the government to the PT. Jasa Marga Tbk to take over the toll road. Authors also calculate the length of the queue of vehicles going on now at the entrances toll Cawang-Tomang using queuing theory approach, where the queues are expected to be lost when the freeway is implemented. Strategies are effective in determining freeway on Cawang-Tomang section also expected to address the congestion problems that occurred in Jakarta."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S46781
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Ridho Fakhrin
"Berdasarkan data RPJMN tahun 2015-2019, realisasi pembangunan infrastruktur jalan tol di Indonesia mengalami keterlambatan sebesar 49% atau sepanjang 904 km dari rencana total. Salah satu penyebab keterlambatan adalah akibat dari faktor kelembagaan. Studi kasus pada penelitian ini adalah Pembangunan Jalan Tol Trans Sumatera (JTTS). Tujuan dari penelitian ini adalah untuk mengevaluasi serta melakukan pengembangan fungsi kelembagaan pada Pembangunan JTTS berdasarkan risiko yang paling dominan. Analisis risiko dilakukan berdasarkan fungsi, peran, tugas, dan tanggung jawab dari setiap stakeholder yang dilakukan pada Tahap Pendanaan, Tahap Perencanaan Teknik, dan Tahap Pelaksanaan Konstruksi. Penelitian ini dilaksanakan dengan mengumpulkan data melalui survei kuesioner, selanjutnya diolah menggunakan metode statistik yaitu uji homogenitas, uji kecukupan data, uji validitas, dan uji reliabilitas, serta dilanjutkan dengan penilaian risiko menggunakan matriks risiko. Hasil dari analisis didapatkan 28 risiko yang paling dominan dari 20 stakeholder yang ada pada JTTS. Pengembangan fungsi kelembagaan dilakukan dengan merubah sistem pendanaan yang semula menggunakan pendanaan perusahaan (corporate finance) menjadi pendanaan proyek (project finance). Sehingga, dalam melaksanakan Pembangunan JTTS digunakan pendanaan yang didapatkan dari sponsor/investor. Sedangkan, anggaran Pemerintah dapat lebih difokuskan untuk membiayai pembebasan lahan.

Based on the 2015-2019 RPJMN data, the realization of toll road infrastructure development in Indonesia experienced a delay of 49% or 904 km of the total plan. One of the causes of delays is the result of institutional factors. The case study in this research is the construction of the Trans Sumatra Toll Road (JTTS). The purpose of this study is to evaluate and develop institutional functions in JTTS development based on the most dominant risk. Risk analysis is carried out based on the functions, roles, duties, and responsibilities of each stakeholder which is carried out at the Funding Stage, Technical Planning Stage, and Construction Implementation Stage. This research was conducted by collecting data through a questionnaire survey, then processed using statistical methods, namely homogeneity test, data adequacy test, validity test, and reliability test, and continued with risk assessment using a risk matrix. The results of the analysis are 28 of the most dominant risks of the 20 stakeholders in JTTS. The development of institutional functions is carried out by changing the funding system which originally used corporate finance to become project finance. Thus, in carrying out the JTTS development, funding obtained from sponsors/investors is used. Meanwhile, the Government's budget can be more focused on financing the land acquisition."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Hamdani
"Tesis ini melakukan analisa terkait kebutuhan masyarakat terhadap konsep rest area pada Jalan Tol Trans Sumatera Ruas Tebing Tinggi – Parapat. Penelitian ini dilatarbelakangi karena perencanaan rest area yang ada saat ini masih belum efektif secara konsep dan kurang memerhatikan aspek komersial. Padahal dengan sisi komersial rest area yang optimal, biaya pemeliharaan rest area dapat dibiayai dari pendapatan yang diperoleh. Dengan demikian, Perseroan tidak perlu mengeluarkan biaya tambahan untuk pemeliharaan, mengingat terdapat beban keuangan Perseroan yang diakibatkan oleh pembangunan JTTS yang tidak layak secara finansial. Analisis yang digunakan dalam penelitian ini adalah Model Analytic Network Process (ANP) yang nantinya akan dibagi menjadi 3 cluster yaitu cluster tujuan, cluster kriteria, dan cluster alternatif. Klaster tujuan merupakan tujuan akhir yang ingin dicapai dalam penelitian ini. Kriteria cluster merupakan kriteria penilaian yang digunakan dalam penelitian ini berdasarkan analisis benchmark rest area eksisting, studi literatur, dan validasi ahli. Klaster alternatif merupakan pilihan pengembangan yang diperoleh dari hasil analisis penggunaan tertinggi dan terbaik.

The paper establishes and analyzes research regarding community needs for the concept of rest areas on the Trans Sumatra Toll Road Section of Tebing Tinggi - Parapat. The background of the research is due to the fact that the current planning of rest areas is still not effective yet in concept and does not pay much attention to the commercial aspect. Even though with the optimal commercial side of the rest area, the cost of maintaining the rest area can be funded from the income earned. Thus, the Company does not need to incur additional costs for maintenance, considering the Company's financial burden due to the construction of JTTS which is not financially feasible. The analysis used in this study is the Analytic Network Process (ANP) Model which will later be divided into 3 clusters namely the destination cluster, the criteria cluster, and the alternative cluster. The objective cluster is the final goal to be achieved in this study. Cluster criteria is the assessment criteria used in this study based on analysis of existing benchmark rest areas, literature studies, and expert validation. Alternative cluster is development options obtained from the results of the highest and best use analysis."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Arie Irianto
"Keberadaan serta pengembangan infrastruktur menjadi salah satu faktor penentu dari pertumbuhan perekonomian nasional, termasuk jalan tol yang dibangun dalam rangka privatisasi proyek infrastruktur jalan. Walaupun sempat mengalami penundaan akibat terjadinya krisis moneter pada tahun 1997, melalui Keppres 15 tahun 2002 Tentang penerusan proyek-proyek infrastruktur termasuk jalan tol, pelaksanaan pembangunan jalan tol dimulai kembali seiring dengan semakin membaiknya perekonomian di Indonesia. Jasa Marga saat ini sedang melaksanakan kelanjutan dari paket pembangunan jalan tol JORR, yaitu jalan tol JORR Seksi W2, El Tahap 2, E2, E3, N yang membutuhkan dana secara keseluruhan sebesar 3,7 Trilyun rupiah. Mengingat adanya keterbatasan kondisi keuangan perusahaan, pola pinjaman perbankan konvensional dengan tingkat nilai suku bunga tertentu merupakan salah satu bentuk pembiayaan yang telah digunakan saat ini. Tujuan dari penelitian adalah melakukan risk assessment terhadap alternatif pola pendanaan syariah pada pembangunan proyek JORR. Alasan penelitian adalah bahwa pola pinjaman dengan suku bunga perbankan konvensional yang tidak mengenal prinsip risk sharing bertentangan dengan adanya berbagai risiko pada investasi jalan tol dimana risiko-risiko tersebut harus secara adil dan proporsional ditanggung bersama oleh pihak-pihak yang terlibat di dalam investasi jalan tol ini.
Dalam penelitian ini, dilakukan identifikasi risiko terhadap faktor-faktor yang akan timbul pada saat pelaksanaan konstruksi dan pengoperasian jalan tol bagi Jasa Marga sebagai peminjam dana (kreditur) dan kesiapan lembaga keuangan syariah sebagai pemberi pinjaman (debitur) termasuk faktor-faktor eksternal yang berhubungan dengan publik maupun regulasi dari pemerintah sehubungan dengan penerapan sistem tersebut di atas.
Dari risiko-risiko tersebut diidentifikasi tingkat penting risiko dan meneliti potensi-potensi risiko yang harus diberikan perhatian khusus dan tindakan (respons) apa yang dapat dilakukan untuk mengelola risiko-risiko tersebut. Penelitian ini menggunakan cara kajian literatur, wawancara, dan survey (kuisioner), sedangkan pcngolahan datanya menggunakan metode Analytical Hierarchy Process (AHP) dan analisis statistik dengan menggunakan soft ware SPSS 11.0 untuk mendapat model persamaan dari analisis regresi berganda linier sebagai input simulasi Montecarlo untuk melihat sejauh mana tingkat kesuksesan pencapaian tujuan penerapan pola pendanaan syariah tersebut.
Kesimpulan akhir dari penelitian ini, tingkat kesuksesan penerapan pola pendanaan syariah berada pada skala sedang yang artinya tujuan tercapai sesuai rencana, dimana kendala jumlah aset likuid perbankan syariah yang masih relatif kecil menjadi variabel risiko yang paling mempengaruhi tercapainya tujuan proyek."
Depok: Fakultas Teknik Universitas Indonesia, 2005