Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 182314 dokumen yang sesuai dengan query
cover
Tyas Atika Permatasari
"ABSTRAK
SMA Negeri 39 Jakarta dan SMA Labschool Jakarta merupakan salah satu sekolah negeri dan swasta unggulan di Jakarta Timur sehingga memerlukan kesiapan dalam menghadapi keadaan darurat di sekolah sebagai percontohan untuk sekolah lain. Penelitian dilakukan untuk mengetahui gambaran kesiapan tanggap darurat gempa bumi dan kebakaran di SMA Negeri 39 Jakarta dan SMA Labschool Jakarta di tahun 2015. Penelitian dilakukan melalui metode observasi, wawancara, dan penyebaran kuesioner dengan teknik sampel acak. Studi ini menunjukkan bahwa kedua sekolah cenderung belum memiliki kesiapan keadaan darurat yang baik. Diharapkan kedua sekolah segera membentuk perencanaan atau kebijakan mengenai keadaan darurat di sekolah secara menyeluruh.

ABSTRACT
SMA Negeri 39 Jakarta and SMA Labschool Jakarta are ones of the featured public and private schools in East Jakarta that requires emergency preparedness in their schools as pilot for other schools. The aim of this study is to determine the readiness of emergency responses of SMA Negeri 39 Jakarta dan SMA Labschool Jakarta to two kinds of disasters, which are earthquake and fire in 2015. The study was conducted through observation, interviews, and questionnaires distribution by using random sampling technique. The study showed that both schools tend not to have good emergency preparedness. Both schools are expected to immediately form a planning or policy regarding the state of emergency situation in the whole schools.
"
2015
S60133
UI - Skripsi Membership  Universitas Indonesia Library
cover
Aditha Vaniadevi
"Proteksi sarana kebakaran merupakan hal mutlak yang diperlukan oleh setiap perusahaan. Dengan adanya proteksi sarana kebakaran, maka bangunan perusahaan akan mendapatkan proteksi untuk mencegah kebakaran sehingga keamanan dan keselamatan karyawan di perusahaan tersebut akan lebih terjamin. Tujuan dari penelitian ini adalah untuk melihat apakah proteksi kebakaran di perusahaan sudah memenuhi standar atau belum. Metode pada penelitian ini merupakan deksriptif kuantitatif dengan menggunakan aplikasi CFSES yang berbasis NFPA.
Hasil penelitian menunjukkan bahwa proteksi gedung utama PT Pertamina yang sudah memenuhi standar yaitu konstruksi bangunan, segredasi dari bahaya, sprinkler, detektor asap, interior finish, jalur evakuasi, sistem pintu keluar, dan program kedaruratan. Yang harus diperbaiki yaitu bukaan vertikal, sistem alarm kebakaran dan kontrol asap, sedangkan yang harus ditambahkan untuk memenuhi kriteria CFSES yaitu pressurize fan pada tangga darurat. Dengan kondisi sekarang dan mengacu pada CFSES bahwa proteksi gedung utama PT Pertamina belum memenuhi standar.

Fire protection system is indispensable for every company. If company have fire protection system, the company’s construction will get protection to prevent the fire, so that the security and safety of employees to be more secure. The purpose of this study was to see whether the fire protection has a standard or not. The method in this research is descriptive quantitative by using application CFSES which use NFPA to the theory. The result showed that the main protection of PT Pertamina which meet the standard are building construction, segredation of hazard, sprinkler, smoke control.
The result which not meet the standard are vertical opening,fire alarm systems and smoke control, the fire protection who must be added to comply to CFSES criteria is pressurize fan on the fire escape. With this condition, based on CFSES, this main building did not meet the standard.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2013
S45548
UI - Skripsi Membership  Universitas Indonesia Library
cover
Monica Dwimandhani
"Skripsi ini meneliti mengenai persepsi pedagang ITC di Jakarta Selatan mengenai kejadian gempa bumi pada tahun 2011. Variabel yang digunakan dalam penelitian ini adalah pengetahuan, sikap, pengalaman, dan keadaan atau kondisi ITC. Penelitian ini menggunakan metode kuantitatif dengan pendekatan cross sectional. Desain yang digunakan dalam penelitian ini adalah deskriptif observasional. Data didapatkan dari penyebaran kuesioner kepada 240 responden, wawancara, dan kepustakaan. Pengumpulan data dilakukan selama satu bulan, dari bulan November ? Desember 2011. Hasil dari penelitian didapatkan bahwa variabel sikap pedagang masih paling rendah dibandingkan variabel lain dalam pembentukan persepsi mereka.Oleh karena itu, kesadaran para pedagang mengenai sikap positif dalam menghadapi gempa harus ditingkatkan dengan memberikan penyuluhan yang lebih aplikatif dan menarik kepada para pedagang.

This research is about ITC?s sellers perceptions in South Jakarta about earthquake event in year 2011. This assessment based on knowledge, attitude, experience, and environmental condition of ITC. The research is quantitative methode with descriptive analysis design and cross sectional approach. The research period from November until December 2011, and involving questioner collection for 240 respondent. Result suggested that attitude variable has the lowest value to make good perception. In order to increase seller?s awareness, management must give an aplicative and interesting counseling."
Depok: Universitas Indonesia, 2012
S-Pdf
UI - Skripsi Open  Universitas Indonesia Library
cover
Firly
"Pertumbuhan pembangunan gedung bertingkat maupun perkantoran yang terus meningkat memiliki potensi akan bahaya dan bencana misalnya kebakaran sehingga perlu diperhatikan sistem tanggap darurat guna meminimalisir dampak kerugian baik dari segi material maupun manusia melalui upaya mitigasi, pencegahan, dan deteksi dini.
Penelitian ini bertujuan untuk melihat gambaran sistem tanggap darurat (Emergency Response Preparedness) pada fase pra, saat, maupun pasca kebakaran di Gedung Balaikota Depok berdasarkan NFPA 1600 edisi 2013: Standard on Disaster/Emergency Management and Business Continuity Programs.
Penelitian ini menggunakan desain penelitian deskriptif analitik dengan pendekatan kualitatif. Hasil penelitian ini menunjukan bahwa sistem tanggap darurat bahaya kebakaran di gedung Balaikota Depok masih belum maksimal dan komprehensif.

The growth of multi-storey buildings and offices have hazard potential to become disaster like fire that need to be consider an emergency response system to minimize the impact of losses in terms of material and human through step of mitigation, prevention, and early detection.
This study aims to look at describtion of emergency response system (Emergency Response Preparedness) in pre, during, and post disaster of fire in the building of Balaikota Depok based on standard of NFPA 1600: Standard on Disaster / Emergency Management and Business Continuity Programs.
This study uses descriptive analytic design with a qualitative approach. From this study, it can be concluded that the emergency response system for fire hazard in the building of Depok City Hall was not optimally and comprehensive.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2016
S65365
UI - Skripsi Membership  Universitas Indonesia Library
cover
Faizah Maryam Sidiqqah
"Skripsi ini bertujuan untuk menganalisis penerapan sistem pencegahan dan penanggulangan kebakaran di Gedung Yayasan LIA Pengadegan. Penelitian ini menggunakan desain penelitian deskriptif analitik dengan dilakukannya evaluasi sesuai dengan Permen PU No. 26/PRT/M/2008 dan Permen PU No. 20/PRT/M/2009. Hasil penelitian menunjukkan bahwa sebagian besar elemen sistem pencegahan dan penanggulangan kebakaran di Gedung Yayasan LIA Pengadegan sudah memenuhi standar. Persyaratan yang belum terpenuhi pada manajemen proteksi kebakaran adalah tata laksana operasional dan sumber daya manusia. Persyaratan pada sistem proteksi dan sarana penyelamatan kebakaran belum seluruhnya terpenuhi. Utilitas bangunan dan struktur bangunan umumnya telah terpenuhi. Kesimpulan yang diperoleh, sistem pencegahan dan penanggulangan kebakaran di Gedung Yayasan LIA Pengadegan masih perlu ditingkatkan, terutama untuk perawatan dan pemeliharaan sarana sistem proteksi kebakaran.

This study aimed to analyze the implementation of fire prevention and control systems in Yayasan LIA Pengadegan. This research used descriptive analytic design from evaluation in accordance from Permen PU No. 26/PRT/M/2008 and Permen PU No. 20/PRT/M/2009. The results showed that most of the elements of fire prevention and control systems in the Yayasan LIA Pengadegan Building already met the standards. The requirements have not been met in the management of fire protection were operational governance and human resources. Requirements on fire protection systems and fire rescue facilities have not been entirely fulfilled. Utility buildings and structures have generally met the standards. In conclusion, prevention and fire fighting system in Building Pengadegan LIA Foundation still need to be improved, especially for the care and maintenance of fire protection systems."
Depok: Universitas Indonesia, 2015
S60748
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Firdaus Sriyadi
"Penelitian ini bertujuan untuk menjelaskan kesiapan detektor, alarm, hidran, sistem pipa tegak, sprinkler, alat pemadam api ringan (APAR), bahan bangunan, dan konstruksi bangunan gedung dalam menghadapi bahaya kebakaran. Selain itu, penelitian ini juga bertujuan untuk mengukur tingkat pengetahuan dan persepsi pekerja terhadap alat proteksi kebakaran serta menjelaskan ketersediaan dana yang dialokasikan UI untuk penyediaan alat proteksi kebakaran. Jenis penelitian bersifat deskriptif observasional. Sampel dalam penelitian ini berjumlah 37 pekerja.
Berdasarkan hasil penelitian didapatkan tiga dari enam alat proteksi kebakaran aktif yang diteliti dalam keadaan tidak aktif. Alat proteksi kebakaran yang tidak aktif adalah detektor, alarm, dan sprinkler. Sedangkan alat proteksi kebakaran yang aktif adalah hidran, sistem pipa tegak, dan APAR. Bahan bangunan dan konstruksi bangunan siap dalam menghadapi bahaya kebakaran. Tingkat pengetahuan pekerja terhadap alat proteksi kebakaran dalam kategori baik, sedangkan tingkat persepsi pekerja terhadap alat proteksi kebakaran dalam kategori kurang baik. Belum ada alokasi dana dari UI untuk penyediaan alat proteksi kebakaran. Disarankan kepada pihak UI, K3 gedung X, dan K3L UI untuk saling berkoordinasi memperbaiki sistem proteksi kebakaran di gedung X UI.

This study aims to explain the readiness of detectors, alarms, fire hydrant, standpipe system, sprinklers, fire extinguisher (APAR), building materials, and building construction in the face of a fire hazard. In addition, this study also aims to measure the level of knowledge and perceptions of workers against fire protection tool and explain the availability of UI funds allocated for the provision of fire protection tool. Type a descriptive observational study. The sample in this study amounted to 37 workers.
Based on the results, three of the six active fire protection tool studied in an inactive state. Fire protection tool which is not active detectors, alarms, and sprinkler. While the tool is active fire protection hydrants, standpipe systems, and fire extinguisher. Building materials and construction ready to face the danger of fire. The level of knowledge workers against fire protection device in either category, while the perceived level of fire protection of workers against the tool in the unfavorable category. There has been no allocation of funds from the UI for the provision of fire protection. Recommended to the UI, K3 building X UI, and K3L UI to coordinate repair of fire protection systems in the building X UI.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2015
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Prapti Setyaningsih
"[ABSTRAK
Penelitian dengan judul Fire Load kamar asrama Y di Jakarta merupakan penelitian
deskriptif komparatif. Penelitian ini menggambarkan nilai fire load yang berasal dari
bahan perlengkapan di dalam ruangan (kamar) baik yang bersifat fixed seperti kusen dan
pintu maupun yang bersifat movable seperti kursi, tempat tidur dan lainnya. Perlengkapan
kamar kemudian dikategorikan menurut tipe pertumbuhan api, yaitu ultrafast, fast,
medium dan slow. Waktu perkiraan evakuasi dihitung dengan menggunakan model
matematis sederhana berdasarkan gambaran komponen sarana evakuasi gedung.
Dari hasil penelitian terhadap 13 kamar asrama di asrama Y diketahui rata-rata nilai Fire
Load adalah 356.0 MJ/m2. Hasil tersebut melebihi survey yang dilakukan oleh puslitkim
PU pada tahun 1997. Menurut tipe pertumbuhan apinya 66.6 % perlengkapan asrama
memiliki sifat pertumbuhan api medium, 26.9 % perlengkapan memiliki pertumbuhan api
sifat fast namun 6.5% perlengkapan asrama memiliki sifat pertumbuhan api ultra fast
(waktu tumbuh 75 detik). Hasil perhitungan waktu evakuasi tanpa hambatan adalah 15
menit 48 detik pada siang hari dan 13 menit 31 detik pada malam hari

ABSTRACT
The fire load room estimations value of Y dormitory in Jakarta and fire evacuation is a
descriptive and comparative research. This research calculated fire load derived from
room facilities material either fixed fire load (siils, door etc) and movable Fire Load(
chair, bed, etc). The material then categorized based on fire growth type,e g ultrafast, fast,
medium and slow. The evacuation time has calculated using simple mathematics method
based on evacuation means.
From 13 room in Y boardinghouse, the mean of fire load is 356.0 MJ/m2. This result is
higher than fire load that calculated by PU in 1997. Refer to fire growth type, 66.6 %
equipment have medium fire growth, 26.9 % equipment have fast fire growth and 6.5%
have ultra fast fire growth (fire growth 75 s). Evacuation time is 15 minute 48 second in
afternoon dan 13 minute 31 second at night.;The fire load room estimations value of Y dormitory in Jakarta and fire evacuation is a
descriptive and comparative research. This research calculated fire load derived from
room facilities material either fixed fire load (siils, door etc) and movable Fire Load(
chair, bed, etc). The material then categorized based on fire growth type,e g ultrafast, fast,
medium and slow. The evacuation time has calculated using simple mathematics method
based on evacuation means.
From 13 room in Y boardinghouse, the mean of fire load is 356.0 MJ/m2. This result is
higher than fire load that calculated by PU in 1997. Refer to fire growth type, 66.6 %
equipment have medium fire growth, 26.9 % equipment have fast fire growth and 6.5%
have ultra fast fire growth (fire growth 75 s). Evacuation time is 15 minute 48 second in
afternoon dan 13 minute 31 second at night.;The fire load room estimations value of Y dormitory in Jakarta and fire evacuation is a
descriptive and comparative research. This research calculated fire load derived from
room facilities material either fixed fire load (siils, door etc) and movable Fire Load(
chair, bed, etc). The material then categorized based on fire growth type,e g ultrafast, fast,
medium and slow. The evacuation time has calculated using simple mathematics method
based on evacuation means.
From 13 room in Y boardinghouse, the mean of fire load is 356.0 MJ/m2. This result is
higher than fire load that calculated by PU in 1997. Refer to fire growth type, 66.6 %
equipment have medium fire growth, 26.9 % equipment have fast fire growth and 6.5%
have ultra fast fire growth (fire growth 75 s). Evacuation time is 15 minute 48 second in
afternoon dan 13 minute 31 second at night., The fire load room estimations value of Y dormitory in Jakarta and fire evacuation is a
descriptive and comparative research. This research calculated fire load derived from
room facilities material either fixed fire load (siils, door etc) and movable Fire Load(
chair, bed, etc). The material then categorized based on fire growth type,e g ultrafast, fast,
medium and slow. The evacuation time has calculated using simple mathematics method
based on evacuation means.
From 13 room in Y boardinghouse, the mean of fire load is 356.0 MJ/m2. This result is
higher than fire load that calculated by PU in 1997. Refer to fire growth type, 66.6 %
equipment have medium fire growth, 26.9 % equipment have fast fire growth and 6.5%
have ultra fast fire growth (fire growth 75 s). Evacuation time is 15 minute 48 second in
afternoon dan 13 minute 31 second at night.]"
2015
T42952
UI - Tesis Membership  Universitas Indonesia Library
cover
Tiara Ramadhanti P
"Kejadian gempa yang terjadi dalam periode tertentu serta kondisi fisik wilayah yang mudah terkena dampak getaran seismik menjadikan wilayah Tasikmalaya menjadi wilayah rawan. Kerawanan wilayah Tasikmalaya dapat ditentukan dengan menggunakan metode skoring berdasarkan Peraturan Menteri Pekerjaan Umum Nomor 21 Tahun 2007 dengan variabel berupa kondisi geologi berupa jenis batuan, kemiringan lereng, dan PGA. Selain kerawanan wilayah, penelitian ini menghasilkan kerentanan wilayah terhadap gempa bumi berdasarkan aspek fisik berupa kerawanan wilayah dan juga aspek sosial ekonomi berupa kepadatan bangunan, keluarga miskin, kepadatan penduduk, laju pertumbuhan penduduk dan persentase penduduk wanita dengan menggunakan metode pembobotan yang menghasilkan tiga tingkat kerentanan dimana kerentanan wilayah tertinggi berada di Kecamatan Culamega. Berdasarkan metode pembobotan dengan mengurangi variabel struktur geologi, maka pengaruh kondisi fisik lebih mendominasi dibandingkan kondisi sosialnya.

Earthquake events that happened in certain period, as well as the physical condition of the area that susceptible to seismic tremor cause the Tasikmalaya area become a fluid area. The fluidity of Tasikmalaya area can be determined by using scoring method in accordance with The Provision of Minister of Public Works No. 21 of 2007 with variables in geological conditions, such as rock types, slope and PGA. Other than/besides the fluidity of the area, this research results in a vulnerability of the area over the earthquake based on physical aspects, such as the fluidity of the area and also social economy aspects, such as plants density, poor families, population density, population growth rate and women population percentage by using weighting method resulting in three vulnerability levels where the greatest area vulnerability is in Culamega district. According to the weighting method by decreasing geology structure variables, the physical condition more dominates than the social condition."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2011
S1008
UI - Skripsi Open  Universitas Indonesia Library
cover
Dini Nur Anisa
"Penelitian ini bertujuan untuk melakukan analisis terhadap gambaran manajemen tanggap darurat kebakaran dan sarana penyelamatan jiwa yang ada di gedung Fakultas Farmasi Universitas Indonesia. Penelitian ini menggunakan metode deskriptif analitik dengan melakukan observasi lapangan, wawancara, dan telaah dokumen. Hasil dari penelitian ini selanjutnya dibandingkan kesesuaiannya dengan Permen PU No. 20/PRT/M/2009, Permen PU No.26/PRT/M/2008, Kepmen PU No. 10/KPTS/2000, SNI 03-1746-2000, SNI 03-6574-2001, dan dan standar internasional NFPA 101.
Hasil penelitian didapatkan bahwa Fakultas Farmasi Universitas Indonesia belum memiliki manajemen tanggap darurat kebakaran yang sesuai dengan standar. Sarana penyelamatan jiwa yang belum semuanya terpenuhi adalah koridor, pintu darurat, tangga darurat, petunjuk arah jalan keluar, dan pencahayaan darurat. Dari hasil penelitian maka diperlukan pengadaan bagi manajemen tanggap darurat kebakaran dan perbaikan bagi sarana penyelamatan jiwa yang belum memenuhi persyaratan, serta dilakukan pemeliharaan bagi yang sudah terpenuhi.

The purpose of the research is to analyze the management overview fire emergency response and facility of life saving in Faculty of Pharmacy building, University of Indonesia. This research used the descriptive analytic metod with performing field overview, interview, and document study. The result of this research will be compared its conformity with Permen PU No. 20/PRT/M/2009. Permen PU No. 26/PRT/M/2008, Kepmen PU No. 10/KPTS/2000, SNI 03-1746-2000, SNI 03-6574-2001, and NFPA 101.
This result shows that Faculty of Pharmacy in University of Indonesia yet to have standard compliant fire emergency response management. The place that yet to have life saving facility including corridor, emergency doors, emergency stares, exit directions, and emergency lightings. From this research conclude that the procurement is required for management of the fire emergency responnse and requirement for the life saving facility wich do not meet the requiremnts, and maintenace for the facility.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2016
S63627
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sudaryono
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2000
S28532
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>