Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 151146 dokumen yang sesuai dengan query
cover
cover
Harrison, Jared F.
Englewood Cliffs, NJ: Prentice-Hall, 1974
658.4 HAR m
Buku Teks  Universitas Indonesia Library
cover
"PAL Indonesia as Internationally class domestic industry which is moving on naval architect is always improving its productivity. The background of this research is unreachable production capacity from the target....."
Artikel Jurnal  Universitas Indonesia Library
cover
Ikhsan Mahyuddin
"Setelah diresmikannya Ship Building Plant untuk Divisi Kapal Niaga pada tahun 1994, maka PT. PAL mempunyai kemampuan untuk membangun kapal niaga sampai dengan 50.000 DWT. Untuk mengembalikan investasi yang sudah ditanam, strategi yang ditempuh PT. PAL adalah dengan mendapatkan order sebanyak mungkin. Walaupun sudah mendapatkan order sampai tahun 1999, namun revenue yang didapat belum memenuhi target yang ingin dicapai (Total assets turn over). Selain itu, alokasi jadwal pembangungan kapal diatas dok menjadi sangat terbatas (lintasan kritis). Bila ada suatu proyek pembangunan kapal yang terlambat, akan berpengaruh kepada proyek-proyek berikutnya. Untuk meningkatkan revenue sesuai dengan target yang ingin dicapai, maka PT. PAL harus menentukan produk-produk yang diunggulkan, yang mempunyai harga jual tinggi dan nilai tambah besar. Untuk menentukan produk-produk yang diunggulkan, harus dibuat kriterianya serta dianalisa potensi pasarnya. Dengan melakukan simulasi kombinasi jumlah dan jenis produk unggulan, maka dapat dilihat jenis dan jumlah produk unggulan yang akan dipasarkan, agar target penjualan produk kapal niaga dapat dicapai.

Having inaugurated Ship Building Plant of Merchant Ship Division on year 1994, PAL has capability to build merchant ships which capacity up to 50.000 DINT. In order to speed up the return of investment, the strategy of PAL is to get the orders as many as possible. Even though PAL has got the orders up to year 1999, but the income revenue has not achieved the expected target yet (Total assets turn over). On the other hand, the schedule for allocation of shipbuilding at dock become so limited (critical path). in order to increase revenue in accordance with the expected target, PAL has to determine the selected products, which have high selling price and have high added value. To determine the selected products, PAL has to establish the criteria and analyze the market potential. By simulating the combination of number and types of selected products, we will get the number and types of selected products that should be marketed, so that the sales target of merchant ship products can be achieved.
"
1997
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Fakultas Teknik Universitas Indonesia, 1996
S36419
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sukrisno
"Ship Building Plant (SBP) 50.000 DWT adalah merupakan bagian dari Divisi Kapal Niaga, yaitu fasilitas dock tempat pembuatan Kapal, khususnya untuk jenis Kapal Niaga atau Kapal Cargo, yang dilengkapi dengan fasilitas kerja seperti : Fabrication Shop, Sub-Assembly & Assembly Shop, Erection Shop, Pipe Shop dan Machinery Shop.
Dalam menghadapi era globalisasi menuntut dunia industri untuk menciptakan keunggulan bersaing, dimana salah satu faktor agar dapat mampu bersaing yang cenderung dapat kita kendalikan adalah faktor internal dan perusahaan itu sendiri yaitu yang menyangkut masalah performansi dan input sumber daya yang digunakan, dan performansi dad output atau produk yang dihasilkan_ Untuk dapat melakukan pengendalian faktor-faktor tersebut diperlukan suatu parameter yang dapat digunakan untuk menilai dan mengevaluasi performansi produksi dimana dalam penelitian ini digunakan metode Multi Factor Productivity Measurement Model dan mengotimalkan metode pengendalian manajemen dalam produksi kapal yaitu Performance Chart dan Efek Diagram Pareto dari unsur sumber daya yang digunakan.
Hasil analisa performansi produksi yang diperoleh adalah sebagai berikut :
- Terdapat unsur-unsur biaya produksi yang penggunaan biayanya cenderung terus meningkat, khsusnya untuk input tenaga kerja tak langsung dan perawatan mesin
- Periode 1 dan 2 tahun 1997 produktivitas perusahaan rendah, sebesar 0.75 % dan 0.82%, sedang produktivitas periode 3 dan 4, 1998 meningkat menjadi 1.23 dan 1,45.
- Perusahaan kehilangan peluang untuk mendapatkan keuntungan sebesar + Rp 28,000,000,000,- karena adanya kenaikan harga material dan ongkos kerja.
- Performance Chart menunjukkan adanya deviasi penyelesaian proyek sebesar 20 s/d 38% antara rencana dan realisasi.
- Diagram Pareto untuk mendeteksi unsur sumber daya yang perlu mendapat perhatian dari manajemen , sebagai gambaran 13 % dari total material yang digunakan, biaya yang telah diserap sebesar 58.5% dari total biaya periode 1.

Ship Building Plant (SBP) 50.000 DWT is fasility of Merchant Ship Division of PT PAL which consist of Grafing Dock with Capacity up to 50.000 DWT and supporting work shop i.e Fabrication Shop, Sub Assembly-Assembly Shop,Erection Shop, Pipe Shop and Machinery Shop.
To face the globalisation era, the industry is challenge to improve their competitiveness. The competitive factor that can be controllable is the internal factor in the company, which is the performance from usage of resources input and performance of output or product result. To control those factor we need the parameter that can use to evaluate production performance, where in this study we use MFPMM method (Multi Factor Productivity Measurement Model) and optimalization of control management method in ship production that is Performance Chart and Pareto Diagram Effect from element of resource that used.
Result of production performance analysis outcome as follow :
- Found that element of production cost which in use, tend to grow, especially for input from indirect labour and maintenance of machine.
- In period 1 and 2 in 1997, the productivity in company is low as 0.75 and 0.82, where the productivity in periode 3 and 4 in 1998 is grow and become 1.23 and 1.45.
- The company lost the change to get profit as amount of Rp 28 millions, because of increase of material price and labour cost.
- The performance Chart show that the deviation of project complete as 20 to 38 % between planning and realization.
- Effect Pareto Diagram tb detect elemens of resourse that need attention from management For example, 13 % of the total material that has been used, the cost that absorbedis 58.5 % from total cost of period 1.
"
Depok: Fakultas Teknik Universitas Indonesia, 1999
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Dani Mauliate Saroha
"
ABSTRAK
Pemeliharaan mempakan jenis kegiatan yang tidak dapat dipisahkan dengan kegiatan memproduksi barang atau jasa. Seiring dengan semakin banyaknya tuntutan akan hasil produksi yang baik, fungsi pemeliharaan menjadi bagian integral dari fungsi-fungsi lain pada perusahaan. Penelitian skripsi ini dilakukan pada PT. Sharp Yasonta Indonesia Divisi HAD (Home Appliance Dcparrrnemf) yang memproduksi kuIkas. Sistem kerja yang diamati adalah preventive maintenance pada satu Iini produksi yang merupakan tanggung jawab dari Bagian (Bag.) Maintenance divisi HAD.
Sistem kerja pada bagian maintenance selama ini adalah menggunakan sistem manual yang disesuaikan dengan penjadwaian yang telah ditentukan, yaitu penjadwalan kegiatan pemeliharaan dan penjadwalan pengadaan atau pembelian suku cadang. Banyaknya data mesin-mesin produksi maupun jadwal pemeliharaan untuk setiap mesin tersebut menyebabkan bagian maintenance mengalami kesulitan dalam menentukan waktu kegiatan pemeliharaan untuk tiap mesin produksi dilaksanakan, suku cadang mana saja yang harus dibeli atau diambil dari gudang serta jenis kerusakan yang terjadi pada setiap mesin.
Penulisan skripsi ini untuk merancang sistem manajemen database pemeliharaan mesin-mesin produksi terkomputerisasi yang dapat memberikan informasi yang akurat dan tepat waktu sehingga waktu yang terbuang untuk penyusunan file-file dapat dihindari dan kegiatan pemeliharaan akan berjalan sesuai rencana. Penelitian dilakukan dengan menggunakan prinsip dasar sistem manajemen database, untuk mengolah data-data pemeliharaan mesin-mesin produksi yang diperoleh pada bagian maintenance divisi HAD menjadi informasi yang berguna dalam pengambilan keputusan dengan bantuan program komputer database.
"
1997
S36188
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sitio, Katarina Rosmina
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2009
S5235
UI - Skripsi Open  Universitas Indonesia Library
cover
Ade Asmi
"Perkembangan industri yang diikuti dengan meningkatnya masalah lingkungan yang disebabkan kapasitas alam dalam mendaur ulang hasil pencemaran yang terbatas, menjadikan pertimbangan bagi pemerintah untuk menggalakkan perubahan arah dalam mengurangi pencemaran pencemaran lingkungan dari pengolahan pada limbah yang dihasilkan kearah pencegahan pencemaran yang bersifat proaktif yaitu dengan program produksi bersih yang lebih ditekankan pada efisiensi proses produksi suatu industri.
Manfaat dari pencegahan pencemaran dapat meningkatkan efisiensi penggunaan bahan baku dan proses produksi. Dalam penelitian ini dilakukan pengamatan dan pengumpulan data tentang pemakaian air dalam proses produksi mulai dari sumber, penggunaannya pada proses produksi, pembersihan hingga pembuangan akhir. Selain itu dilakukan juga pengamatan mengenai kondisi lingkungan kerja yang ada di lokasi penelitian. Sehingga dari berbagai pengamatan yang penulis lakukan pada penerapan program pencegahan pencemaran dapat meningkatkan efisiensi pemakaian energi serta kondisi lingkungan kerja industri."
Depok: Fakultas Teknik Universitas Indonesia, 1999
S35014
UI - Skripsi Membership  Universitas Indonesia Library
cover
Evi Frillyanti Barokah
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2008
S10702
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>