Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 64442 dokumen yang sesuai dengan query
cover
cover
Kamakshaiah, S.
New Delhi: Tata McGraw-Hill, 2011
621.313 KAM h
Buku Teks  Universitas Indonesia Library
cover
Kamakshaiah, S.
New Delhi: McGraw-Hill Education (India) Private, 2013
621.319 KAM h
Buku Teks SO  Universitas Indonesia Library
cover
London: The Institution of Mechanical Engineers, 1993
629.229 6 ENV
Buku Teks SO  Universitas Indonesia Library
cover
Dimas Ramananda
"ABSTRAK

Kebutuhan energi listrik dari tahun ke tahun semakin meningkat. Peningkatan ini sejalan dengan meningkatnya laju pertumbuhan ekonomi, laju pertumbuhan penduduk, dan pesatnya perkembangan di sektor industri. Kebutuhan energi Indonesia, salah satunya energi listrik saat ini terpusat di Jawa-Bali. Untuk memenuhi kebutuhan listrik sistem Jawa-Bali ke depan, sebagian besar akan disuplai dengan PLTU berbahan bakar batubara yang telah direncanakan akan dibangun di Pulau Jawa.

Sumber energi primer batubara di Pulau Jawa hampir dapat dikatakan tidak ada. Sehingga untuk memenuhi kebutuhan batubaranya harus didatangkan dari Pulau Sumatera dan Kalimantan yang memiliki sumber batubara. Disamping itu ada rencana pembangunan transmisi HVDC sebagai sistem interkoneksi Sumatera-Jawa dengan membangkitkan energi listrik di Mulut Tambang Sumatera Selatan kemudian energi listriknya ditransmisikan langsung ke Pulau Jawa. Skripsi ini bertujuan menganalisis keekonomian penggunaan transmisi HVDC untuk sistem interkoneksi Sumatera-Jawa dalam penyedia tenaga listrik di Jawa dibanding dengan pengiriman batubara dari Sumatera untuk PLTU di Jawa.


ABSTRACT

Electricity needs from year to year increase. This increase is in line with the increasing pace of economic growth, population growth, and rapid development in the industrial sector. Indonesia's energy demand, one of which electrical energy is currently concentrated in Java-Bali. For Supply demand of the Java-Bali electricity system in the future, most will be supplied by coal-fired power plant planned to be built in Java.

Primary energy sources of coal in Java almost nothing can be said. So as to meet the needs of the coal must be imported from the island of Sumatra and Kalimantan, which has a coal resource. Besides, there are plans to build a HVDC transmission system with a Java-Sumatra interconnection generate electricity in South Sumatra Mine Mouth then electrical energy is transmitted directly to Java. This study aims to analyze the economical use of HVDC transmission system for the Java-Sumatra interconnection of electric power provider in Java than with the delivery of coal to the power plant in Sumatra, Java

"
Fakultas Teknik Universitas Indonesia, 2014
S56831
UI - Skripsi Membership  Universitas Indonesia Library
cover
Amil Mardha
[Place of publication not identified]: Jurnal Pengembangan Energi Nuklir, 2009
JPEN 11:2(2009)(1-2)
Artikel Jurnal  Universitas Indonesia Library
cover
Sen, Amartya, 1933-
Oxford: Basil Blackwell , 1960
330.9 SEN c
Buku Teks SO  Universitas Indonesia Library
cover
Rizky Fajar Adiputra
"Sebagai perusahaan negara yang memiliki tugas melistriki nusantara PT PLN Persero harus memenuhi penyediaan energi listrik secara efisien. Akhir tahun 2014 dicanangkan Program Nasional untuk memperkuat sistem listrik di Indonesia melalui program 35.000 MW. Rencana Usaha Penyediaan Tenaga Listrik RUPTL 2018-2027 menyebutkan sebesar 22,2 perencanaan pembangunan pembangkit listrik baru adalah pembangunan pembangkit dengan menggunakan gas sebagai energi primer. Diperlukan jenis pembangkit gas yang tepat untuk dibangun berdasarkan pola operasi pembangkit, sehingga akan menghasilkan pembangkit yang beroperasi secara efisien. Untuk mendapatkan efisiensi dan nilai ekonomi dari pengembangan pembangkit listrik gas yang tepat, digunakan metode perhitungan Levelized Cost of Electricity LCOE yang dihitung berdasarkan Net Present Value NPV selama umur operasi pembangkit gas, dengan memperhitungkan biaya investasi, biaya operasi, biaya pemeliharaan dan biaya penyediaan bahan bakar. Penggunaan pembangkit listrik mesin gas dengan tipe siklus terbuka untuk pola operasi pemikul beban puncak peaker menghasilkan biaya penyediaan energi listrik sebesar 1,976.84 IDR/kWh dapat menghemat biaya penyediaan energi listrik PLN sampai dengan sebesar Rp 15 Miliar per tahun. Penggunaan pembangkit listrik turbin gas dengan tipe siklus terbuka untuk pola operasi pemikul beban sistem load follower menghasilkan biaya penyediaan energi listrik sebesar 1,209.24 IDR/kWh dapat menghemat biaya penyediaan energi listrik PLN sampai dengan sebesar Rp 16 Miliar per tahun. Penggunaan pembangkit listrik turbin gas dengan tipe siklus gabungan untuk pola operasi pemikul beban dasar base load menghasilkan biaya penyediaan energi listrik sebesar 1,021.35 IDR/kWh dapat menghemat biaya penyediaan energi listrik PLN sampai dengan sebesar Rp 73 Miliar per tahun.

As a state owned enterprises that has an assignment to electricity whole Indonesia, PT PLN Persero should meet the provision of electric energy efficiently. The end of 2014 is the National Program to strengthen the electricity system in Indonesia through the 35,000 MW program. Rencana Usaha Penyediaan Tenaga Listrik RUPTL 2018 2027 mentions 22.2 of the planned development of new power plants is the construction of power plants using gas as primary energy. The right type of gas power plant is needed to build on the operating mode of the plant, thus generating efficiently operated plants. To obtain the efficiency and economic value of the development of the appropriate gas power plant, the calculated Levelized Cost of Electricity LCOE calculated based on the Net Present Value NPV over the life time of the gas power plant operation, taking into account investment costs, operating costs and maintenance costs as well fuel costs. The use of open type gas engine power plants for peak load operation mode resulted in a cost of electricity supply of 1.976,84 IDR kWh can save PLN 39 s electricity supply costs up to Rp 15 billion per year. The use of a gas turbine power plant with an open cycle type for the load follower operating mode generates a cost of electricity supply of 1.209,24 IDR kWh can save PLN 39 s electricity supply costs up to Rp 16 billion per year. The use of gas turbine power plant with combined cycle type for base load mode generates electricity cost of 1.021,35 IDR kWh can save PLN electricity supply cost up to Rp 73 Billion per year."
Depok: Fakultas Teknik Universitas Indonesia, 2018
T51527
UI - Tesis Membership  Universitas Indonesia Library
cover
Nausa Nugraha SP
"Teknologi nuklir merupakan salah satu teknologi yang menghasilkan energi yang sangat besar. Untuk itu, peraturan-peraturan tentang keselamatan kerja pada lingkungan instalasi nuklir harus dipahami dan dijalankan dengan sebaik-baiknya. Aspek keselamatan yang menjadi perhatian adalah keselamatan terhadap potensi bahaya radiasi nuklir, limbah radioaktif dan bencana gempa. Analisis dilakukan dengan mengkaji beberapa peraturan-peraturan dan laporanlaporan, baik internasional maupun nasional, serta kesiapan bangsa Indonesia dalam aspek teknis dan kultur nasional untuk penyelenggaraan PLTN. Badanbadan yang terkait langsung, Badan Tenaga Atom Nasional (BATAN) dan Badan Pengawas Tenaga Nuklir Nasional (BAPETEN), telah membuat beberapa peraturan nasional mengenai aspek tersebut dan dalam waktu berjalan juga memberikan sosialisasi kepada masyarakat mengenai peraturan keselamatan. Dengan tercapainya hal-hal tersebut, Indonesia akan memiliki peraturan keselamatan nuklir yang signifikan dengan kapasitas base loads yang sesuai terhadap kebutuhan energi nasional.

Nuclear technology was one of the technology that generates energy with a great magnitude. For that reason, there are regulations concerning the safety which have to be understood and operated, both strongly and carefully. Aspects which paid attention here were safety aspect concerning the potential danger on nuclear radiation, radioactive waste and earthquakes. Analysis was done by studying several regulations and reports, both international and domestic, also technically and national culturally aspect preparedness of Indonesia to hold a Nuclear Power Plant (NPP). Badan Tenaga Atom Nasional (BATAN) and Badan Pengawas Tenaga Nuklir Nasional (BAPETEN), as two major institution which directly involved to the domestic nuclear activities, have made several regulations concerning those aspects and also conducted a socialization program for the society, especially for those who lived around the future NPP site. With the achievement on those mentioned points, Indonesia will have a significant regulatory with sufficient base loads capacity concerning the domestic need of energy."
Depok: Fakultas Teknik Universitas Indonesia, 2008
S37315
UI - Skripsi Open  Universitas Indonesia Library
cover
Wood, Janet
"Introduction to the various types of nuclear reactors worldwide and information on prototype designs
Many different reactor systems have been proposed and some of these have been developed to prototype and commercial scale. Six types of reactor (Magnox, AGR, PWR, BWR, CANDU and RBMK) have emerged as the designs used to produce commercial electricity around the world. A further reactor type, the so-called fast reactor, has been developed to full-scale demonstration stage. These various reactor types will now be described, together with current developments and some prototype designs."
London: Institution of Engineering and Technology, 2007
e20451586
eBooks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>