cover
Rizal Dwi Listio
"ABSTRAK
Pada pengaman lift jatuh ini dikendalikan oleh mikrokontroler menggunakan IC ATMega8535 dengan
compiler-nya adalah BASCOM-AVR. Untuk mendeteksi lift ini dalam keadaan jatuh atau tidak digunakan sensor
akselerometer yang keluarannya tegangan analog lalu dimasukan ke ADC internal yang terdapat pada ATMega8535.
Bila akselerometer mendeteksi lift dalam keadaan jatuh di lantai manapun maka rem akan aktif. Pada perancangan
mekaniknya terdapat rem untuk menghentikan laju jatuhnya lift ini. Rem ini terletak di bawah lift dan bila aktif akan
menekan bagian besi penyangga lift. Untuk menggerakkan rem digunakan motor DC yang memliki gearbox agar
kuat saat menekan besi penyangga.

ABSTRACT
At this falling down safety lift, it controlled by microcontroller ATMega8535 and the compiler is BASCOMAVR.
To detect lift whether falling down or not, we used sensor namely accelerometer that the output is analog
voltage where the voltage is plug in to the internal ADC in ATMega8535. If accelerometer detected lift is falling
down in any floor then it will activated the brake. In the mechanic design is available brake to decrease the falling
down speed. The brake is positioned underneath lift and if it active it will push iron stick to mobilize the brake used
DC motor that have gearbox, to increase the power when it pushed."
2007
TA627
UI - Tugas Akhir  Universitas Indonesia Library
cover
Kresnandar
"Penelitian ini membahas pemilihan lift pada gedung perkantoran yang memiliki 25 lantai. Sistem lift digunakan sebagai alat transportasi vertikal untuk menampung penumpang yang ingin pindah dari satu lantai ke lantai yang dituju, dimana semua penumpang yang ada di dalam gedung tersebut dapat terangkut. Di dalam penelitian ini diperlukan perhitungan traffic analysis untuk mendapatkan jumlah unit, kapasitas, dan kecepatan yang sesuai dengan kriteria pemilihan lift, dimana kriteria pemilihan lift harus memenuhi interval dan handling capacity. Hasil yang diperoleh dalam perhitungan traffic analysis untuk lift low zone 4 unit lift, kapasitas 1150 kg dan kecepatan 2.5 m/s, sedangkan untuk high zone 5 unit lift, kapasitas 1150 kg dan kecepatan 5 m/s.

This research explains about elevator selection at office tower which has 25 floors. The system of elevator is used as vertical transportation for taking in the passenger who wants to move from one floor to another floor, which is all passengers, can be lifted. In this research, is needed the formula of traffic analysis to obtain the total of unit, capacity, and speed which is suitable with the criteria of elevator chosen, which the criteria of elevator chosen has to fulfill the interval and handling capacity. The result from the calculation of traffic analysis for low zone is 4 units, 1150 kg capacity, and 2.5 m/s speed and high zone is 5 units, 1150 kg capacity, and 5 m/s speed."
Depok: Fakultas Teknik Universitas Indonesia, 2009
S50987
UI - Skripsi Open  Universitas Indonesia Library
cover
Syufrijal
Depok: Fakultas Teknik Universitas Indonesia, 2003
TA3126
UI - Tugas Akhir  Universitas Indonesia Library
cover
Ilman Solehudin
"Suatu perusahaan yang baik salah satunya terlihat pada pengelolaan inventory. Semakin kecil inventory semakin baik perusahaan itu, begitu juga sebaliknya. Sedangkan penyimpanan bahan baku yang besar menyebabkan perusahaan mengeluarkan biaya tambahan, seperti biaya pemeliharaan, biaya kehilangan, dan lain-lain. Lot sizing merupakan suatu teknik yang digunakan untuk menentukan ukuran kuantitas pemesanan yang ideal. Algoritma ukuran batch karya Lutfar R. Khan dan Ruhul A. Sarker merupakan algoritma tentang ukuran batch yang optimal dalam pemesanan bahan baku sehingga konsep Just In Time dapat tercapai. Masing-masing metode memiliki kelebihan dan kelemahannya tersendiri, sehingga perlu diketahui pengaruh dari teknik lot sizing terhadap algoritma ukuran batch Khan & Sarker tersebut terhadap total biaya dan persediaan dan memberikan usulan pengembangannya. Pengembangan algoritma ukuran batch berupa bukti bahwa algoritma tersebut hanya cocok digunakan pada jenis data stabil sedangkan jenis data fluktuatif kurang cocok.

A good company look at inventory management. The smaller is better for company's inventory, and in contrary. While the large storage of raw materials caused the company to incur additional costs, such as maintenance costs, losing cost, and others. Lot sizing is a technique used to determine the ideal size of the order quantity. Batch sizes algorithm from Lutfar R. Khan and A. Sarker is an algorithm of optimal batch in the ordering of raw materials so that the concept of Just In Time can be achieved. Each of these methods has its advantages and disadvantages. So the researcher wanted to determine the effect of lot sizing technique to batch sizes algorithms Khan & Sarker is against the total costs and inventory and give the proposed development."
Depok: Fakultas Teknik Universitas Indonesia, 2015
T44550
UI - Tesis Membership  Universitas Indonesia Library
cover
Universitas Indonesia, 2007
TA995
UI - Tugas Akhir  Universitas Indonesia Library
cover
Rucky Budiana
"Lift merupakan sebuah alat transportasi vertikal pada gedung yang memiliki fungsi cukup penting yaitu untuk membantu memindahkan pengguna gedung menuju lantai yang diinginkan. Oleh karena itu lift harus dapat mengakomodir permintaan jumlah pengguna dari gedung tersebut. Pada pagi hari di gedung kuliah S FTUI sering terlihat jumlah antrian yang cukup banyak untuk menunggu kedatangan sebuah lift. Karena itu banyak mahasiswa yang akhirnya memilih untuk menggunakan tangga untuk menuju kelas-kelas dilantai atas.
Kriteria dalam menentukan sebuah sistem lift adalah waktu tunggu rata-rata dan tuntutan arus sirkulasi. Sesuai dengan aturan-aturan yang mengikuti badan standar nasional indonesia, dengan menggunakan metode traffic analysis pada penelitian ini akan dicari sistem lift yang sesuai dengan kebutuhan gedung kuliah S. Metode ini mencari tahu kebutuhan jumlah dan kapasitas lift pada sebuah gedung berdasarkan pola sirkulasi, jumlah pengguna lift, waktu tunggu rata-rata, dan tuntutan arus sirkulasi.
Pada hasil penelitian diperoleh hasil bahwa jumlah lift yang dibutuhkan sesuai dengan jumlah lift yang tersedia sekarang ini. Lift yang dibutuhkan adalah lift dengan kapasitas 10 orang berjumlah 3 unit dengan kecepatan 60 m/m.

Elevator has an important function as a vertical transportation in the building which is to help building’s user to get into the destination floor. Because of that elevator must be able to accomodate demand of users of the building. On morning class, in building S FTUI often seen many queues to wait the arrival of an elevator. At the end many students use stairs to reach into their class in upper floor.
Criteria in selection of vertical transportation building is waiting interval and peak traffic demand. According to the badan standar nasional indonesia this final assignment is to find the optimal number of elevator sistem in lecture building S using traffic analysis method. This method is used to find the amount of elevator needed and its capacity depends on traffic pattern, elevator users, average waiting time, and peak traffic demand.
Based on observation and calculation, the result is the amount of elevator which is needed not match with the elevator available right now. The elevator that should be used is 3 elevators with capacity 10 people and the speed is 60 m/m.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S53340
UI - Skripsi Membership  Universitas Indonesia Library
cover
Harianja, Royan Hartono
"
ABSTRAK
Perhatian pemerintah dan minat masyarakat akhir-akhir ini sangat besar terhadap perencanaan dan penggunaan lift yang tepat pada bangunan-bangunan bertingkat tinggi. Disamping itu lift juga dituntut harus aman dan nyaman sebagai pelayanan umum, sehingga lift hams direkayasa sebaik mungkin agar berdaya guna dan tepat guna.
Inti pemwsalahannya ialah pemakaian dan pemilihan komponen mekanikal yang tepat sesuai dengan daya ke:-ja lih yang clipilih atas kebutuhan dari suatu gedung bangunan.
Hal ini harus sesuai dengan tuntutan pembeli (pasar), sebab hasil karya produksi dapat bersaing, baik dalam mutu maupun kemudahan pemeliharaan, penggunaan dan tingkat biaya produksi yang wajar.
"
1997
S36635
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sigit Wiendarto
"Gedung bertingkat dibangun untuk mengatasi ketersediaan lahan yang semakin terbatas setiap waktu. Masalah yang timbul menyangkut hal ini adalah mobilitas penghuni bangunan menyangkut arus sirkulasi vertikal, lantai yang lebih tinggi secara umum akan lebih sulit untuk dicapai karena keterbatasan tenaga manusia, sistem lift digunakan untuk mengatasi masalah ini. Pemilihan sistem lift yang baik berpengaruh pada kualitas suatu gedung dari segi pelayanan transportasi vertikal, jika pemilihan yang dilakukan kurang baik maka akan berdampak pada fungsi gedung, masalah menyangkut fungsi gedung ini adalah sangat penting terutama pada rumah sakit karena sering sekali terjadi kondisi darurat yang harus segera ditangani dan mungkin berhubungan dengan nyawa manusia.
Terdapat beberapa ukuran yang menjadi dasar penilaian atau penetapan kualitas sistem lift, yaitu interval (waktu tunggu rata-rata) dan jumlah penumpang yang diangkut dalam waktu lima menit (Handling Capacity). Variabel yang digunakan dalam perhitungan untuk memperoleh nilai Interval dan Handling Capacity adalah kapasitas dan kecepatan dari Car. Metode perhitungannya yaitu harus mengetahui lebih dulu nilai Round Trip Time. Dilakukan beberapa kali perhitungan dengan variasi kapasitas dan kecepatan Car sehingga dapat dilihat Interval dan Handling Capacity yang memenuhi kriteria. Jumlah Car yang paling sedikit, Interval yang rendah dan Handling Capacity yang tinggi adalah parameter dari sistem yang dipilih.

Storey buildings are built to cope the land availability which has been decreasing every time. The problem that arises in this regard is the mobility of the building occupants regarding vertical traffic flow, higher floors are usually would be more difficult to be reached due to the limitations of human energy, lift system is used to solve this problem. Selection of a good lift system affects the quality of the building in terms of vertical transportation services, if the selection is done poorly then it will have an impact on the function of the building, issues concerning the function of the building is critical especially in hospitals due to emergency conditions that occur oftenly and needed to be adressed as fast as possible and maybe human lives are at stake in this matter.
There are several standards to assess the quality of a lift system, the Interval (average waiting time) and number of passengers carried in five minutes (Handling Capacity). Variables that are used on the calculation to obtain the value of Interval and Handling Capacity are Car Capacity and Car Speed. The method of calculation is to know the value of Round Trip Time (RTT) first. Calculations performed several times with variations in capacity and speed so Interval and Handling Capacity that satisfy the criteria can be seen. Least Car numbers, low Interval and high Handling Capacity are the parameters of selected system.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S46997
UI - Skripsi Membership  Universitas Indonesia Library
cover
Aliyya Maitsaa Iffat
"Kualitas udara mikrobiologis di dalam lift gedung perlu diperhatikan karena sebagian besar orang lebih memilih untuk menggunakan lift daripada tangga. Banyaknya orang berlalu-lalang memungkinkan mikroorganisme untuk masuk dan mengalami pertumbuhan pada lingkungan yang ideal di dalam lift. Studi literatur mengenai keberadaan bioaerosol di dalam lift masih tergolong sedikit. Oleh sebab itu, penelitian kualitas udara mikrobiologis penting dilakukan di salah satu ruangan pada lingkungan kampus, yaitu lift gedung kuliah saat masa libur dan aktif perkuliahan. Penelitian ini dilakukan di lift pada Gedung S, K dan EC di Fakultas Teknik Universitas Indonesia dengan tujuan untuk mengetahui serta membandingkan hasil konsentrasi bakteri pada masa libur dan aktif perkuliahan, menganalisis pengaruh faktor lingkungan dan potensi sumber pencemar mikrobiologis potensial di sekitar lift gedung perkuliahan. Metode pengambilan sampel pasif digunakan untuk mengambil sampel udara selama 15 menit agar bakteri terdeposisi secara alami ke media Tryptone Soya Agar. Pengambilan sampel permukaan dengan dry swab dilakukan untuk mengetahui apakah tombol panel lift termasuk ke dalam salah satu sumber pencemar mikrobiologis potensial. Dari hasil penelitian dapat diketahui konsentrasi bakteri pada ketiga lift gedung tidak memenuhi baku mutu, yaitu 500 CFU/m3 dan 700 CFU/m3. Pada masa libur, konsentrasi tertinggi sebesar 1.330 CFU/m3 terdapat di lift Gedung EC dan terendah sebesar 608 CFU/m3 terdapat di lift Gedung S. Sedangkan pada masa aktif,  konsentrasi tertinggi sebesar 2.084 CFU/m3 terdapat di lift Gedung S dan terendah sebesar 1.081 CFU/m3 terdapat di lift Gedung K. Hasil uji komparatif menunjukkan bahwa hanya lift Gedung S yang memiliki perbedaan konsentrasi bakteri pada kedua masa perkuliahan. Uji korelasi antara konsentrasi bakteri dengan faktor lingkungan bervariasi tergantung pada kondisi cuaca selama pengambilan sampel. Hanya kecepatan angin yang tidak mempengaruhi karena menyebabkan tidak adanya dispersi mikroorganisme. Sumber indoor bioaerosol seperti keberadaan manusia sebagai pengguna lift sangat berpengaruh sangat kuat terhadap konsentrasi bakteri di dalam lift gedung. Perlu dilakukan pemeliharaan kebersihan secara rutin terhadap pendingin ruangan beserta filter, tombol panel lift, serta lingkungan di sekitar lift gedung agar dapat menurunkan konsentrasi bakteri.

Microbiological air quality in the building elevator needs to be considered because most people prefer to use elevators rather than stairs. The number of people passing by allows microorganisms to enter and grow in the ideal environment of elevator. Literature studies regarding the presence of bioaerosol in elevators are still relatively small. Therefore, microbiological air quality research is important in one of the rooms on the campus environment, the college building elevator during holidays and active periods of lectures. This research was carried out in the elevators of the S, K and EC Buildings at the Faculty of Engineering, University of Indonesia with the air of knowing and comparing the results of bacterial concentration during holidays and active periods of lectures, analyzing the influence of environmental factors and potential sources of potential microbiological pollutants around elevators. The passive sampling method is used to take air samples for 15 minutes so that bacteria are naturally deposited into the Tryptone Soya Agar medium. The surface samples taken by dry swab is done to find out whether the elevator panel button is included in one of the potential microbiological pollutant sources. From the results of research, it can be seen that bacterial concentrations in the three building elevators did not meet the quality standards, 500 CFU/m3 and 700 CFU/m3. During the holidays, the highest concentration of 1.330 CFU/m3 is found in the EC Building elevator and the lowest is 608 CFU/m3 in the S Building. While the active period, the highest concentrations of 2.084 CFU/m3 is found in the S building elevator and the lowest is 1.081 CFU/m3 in the K Building elevator. The comparative test results show that only the S Building elevator has a difference in bacterial concentration in the two lecture periods. Correlation test between bacterial concentration and environmental factors varies depending on weather conditions during sampling Only the wind speed does not affect because it causes no dispersion of microorganisms. Indoor bioaerosol sources such as the presence of humans as elevator users have a very strong influence on the concentration of bacteria in the building elevator. Routine hygiene maintenance needs to be done on air conditioners along with filters, elevator panel buttons, and the environment around the building elevators to reduce the concentration of bacteria."
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Noviani Rahmawati
"Optimalisasi gas lift sistem  pada salah satu lapangan fasilitas kompressi gas di lapangan A, pada PT XYZ untuk menaikkan produksi menjadi 1500 bopd dan 2.5 mmscfd. Berdasarkan perhitungan / perkiraan kebutuhan daya untuk gas lift sistem  baru adalah sebesar  100.57  KVA dan 132.33 KVA beban puncak , dimana sistem kelistrikan saat ini terdiri dari PLN 33 KVA,3 phase,50 HZ dan GEG 106 KVA,3 phase,50 HZ . Dengan kondisi seperti diatas maka sistem kelistrikan saat ini tidak dapat digunakan untuk memenuhi kebutuhan gas lift sistem  yang baru sehingga memerlukan pengembangan sistem kelistrikan. Instrument air package merupakan suporting sistem  untuk gas lift sistem  yang vital, dimana  berhentinya sistem ini lebih dari 15 menit akan menyebabkan gas lift sistem  berhenti beroperasi dan menyebabkan shutdown plant. Biaya pemadaman / biaya yang diakbatkan berhentinya sistem  adalah sebesar  6199 usd/ jam. Pada penelitian ini akan dilakukan analisis pengembangan sistem kelistrikan untuk mendukung optimalisasi gas lift syatem. Analisis meliputi kriteria teknis dan non teknis. Evaluasi teknis meliputi analisis kecukupan daya, kehandalan sistem  dengan menggunakan simulator ETAP 12.6 serta indeks keandalan sistem  dengan menggunakan reliability blok diagram sedangkan untuk evaluasi non teknis melalui biaya investasi dan biaya yang timbul akibat pemadaman. Pada penelitian dilakukan 3 skenario pengembangan, skenario 1,2.1.2.2 dan 3 untuk kemudian dilakukan evaluasi baik teknis maupun non teknis. Berdasarkan penelitian skemario 2.2 merupakan sistem kelistrikan yang optimum  dengan indeks keandalan 0.9963633 dan 0.9493694 dengan biaya investasi sebesar Rp. 8.631.771.033,07. Dan biaya pemadaman sebesar RP. 2.903.023.023.515.

Optimization of  the gas lift sistem  in one of  gas compression facilities in field A, at PT XYZ to increase production to 1500 bopd and 2.5 mmscfd. Based on the calculation / estimation of power requirements for the new gas lift sistem  is 100.57 KVA and the beban puncak  is 132.33 KVA, while the current electricity sistem  consists of PLN 33 KVA, 3 Phase, 50 HZ and GEG 106 KVA, 3 Phase, 50 HZ. With the requirements above, the current electricity sistem  cannot be used to meet the needs of a new gas lift sistem  so that requires the development of an electrical sistem . The instrument air package is a vital support sistem  for gas lift sistem , in case the package shutdown down for more than 15 minutes will cause the gas lift sistem  shutdown and cause a plant shutdown. The cost of loss production because shutdown plant is about 6199 USD / hour. In this research, an analysis of the development of the electrical sistem  will be carried out to support the optimization of gas lift syatem. Analysis consist of Technical Criteria and Non-Technical Criteria evaluation / analysis. Technical evaluation are assessment of power adequacy, sistem  sistem  analysis using the ETAP 12.6 simulator, calculate reliability indeks using reliability block diagram and for non-technical evaluation are investment costs and cost of loss production. In the research carried out 4 development scenarios, scenarios 1,2.1,2.2 and 3. Based on the research of Scenario 2.2 is the optimum scenario."
Depok: Fakultas Teknik Universitas Indonesia, 2018
T51895
UI - Tesis Membership  Universitas Indonesia Library