Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 13468 dokumen yang sesuai dengan query
cover
F. Suryatmo
Jakarta: Bumi Aksara, 1986
621.31 SUR t
Buku Teks  Universitas Indonesia Library
cover
F. Suryatmo
Jakarta: Bumi Aksara, 2004
621.31 SUR t
Buku Teks  Universitas Indonesia Library
cover
Kosasih
"Ketidakseimbangan kapasitas daya pembangkit dan daya beban pada sistem tenaga listrik terlihat dan perubahan frekuensi dari nilai nominal, berupa kenaikan atau penurunan. Penurunan frekuensi yang besar oleh lepasnya satu atau lebih unit pembangkit dari sistem bila tidak segera diatasi, akan menyebabkan lepasnya unit-unit pembangkit lain yang sensitif terhadap penurunan frekuensi seperti PLTU Suralaya dan PLTU Paiton pada sistem tenaga listrik Jawa-Bali. Bila terus tidak diatasi unit-unit pembangkit lain secara beruntun akan lepas dan sistem runtuh total. Untuk mencegah penurunan frekuensi yang besar, sejumlah beban perlu dilepas dengan menggunakan rele frekuensi kurang (under frequence relay) yang bekerja cepat.
Penerapan rele frekuensi kurang di sistem tenaga listrik Jawa-Bali adalah untuk melepas beban atau memisahkan jaringan subsistem, akibat adanya gangguan besar, dengan tujuan mengembalikan frekuensi ke normal serta menjaga keseimbangan kapasitas daya pembangkit dan daya beban.
Pelepasan beban bertahap akan dilakukan bila ada defisit daya besar secara mendadak sehingga frekuensi sistem turun dibawah batas tetapan rele frekuensi kurang. Mengingat dampak penurunan frekuensi akibat defisit daya tidak sama, maka pelepasan beban dibuat fleksibel dalam beberapa tahap. Dengan menurunnya frekuensi yang sangat cepat, koordinasi tetapan frekuensi untuk rele frekuensi kurang untuk masing masing area sangat menentukan agar sistem tidak tejadi gangguan total (black out). Program pelepasan beban ini dibuat dengan bahasa C builder versi 3.0.

The imbalance of generator power and load power capacity to the electric power system is shown by the changing of frequency from face value, in a form of increase or decrease. If this is not being overcome right away, a huge decrease in frequency by the release of one or more generator units from the system occurs and will cause the release of other generator unit, which are sensitive to the decrease of frequency such as PLTU Suralaya and PLTU Paiton to Java-Bali electric power system. If there is still no action in overcoming this problem, other generator units will release one after the other and the system will totally collapse. To avoid a huge decrease in frequency, some loads need to be shedding use under frequency relay which works fast.
The application of under frequency relay to Java-Bali electric power is to load shedding or to separate subsystem network, as a consequence of a big disruption existence, in order to return the frequency to normal, also to keep balance of generator power and load power capacity.
A gradual load shedding will be done if there is a sudden big power deficit so that the system decreases below under setting frequency relay. Considering the impact of the decrease of frequency because there is difference in power deficit, load shedding is made flexible in some stages. Program load shedding was made with C builder version 3.0.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T3764
UI - Tesis Membership  Universitas Indonesia Library
cover
Tambunan, Daniel Moses
"Tenaga listrik dibutuhkan hampir di seluruh sektor kehidupan manusia, mulai dari rumah tangga, pendidikan, industri, dan lain sebagainya. Kualitas daya listrik yang rendah pada suatu waktu akan dapat menimbulkan dampak kerugian, evaluasi terhadap kualitas daya listrik sangat penting untuk dilakukan. Tujuan penelitian ini adalah untuk mengevaluasi kualitas daya listrik pada gedung Departemen Teknik Elektro, dan memberikan rekomendasi untuk menjaga atau memperbaiki kualitas daya listrik agar sesuai dengan standar yang diijinkan. Metode yang digunakan adalah dengan melakukan survei aktivitas gedung, pengukuran, perhitungan, dan simulasi.
Hasil evaluasi menunjukan Pada parameter tegangan, kondisi tegangan maksimal dan minimal sistem gedung berada pada batas yang diijinkan, yaitu masih dalam batas dari 220 Volt, yaitu pada nilai tertingginya 231,53 Volt dan terendahnya pada nilai 211,27 Volt dengan nilai ketidakseimbangan tegangan marginal pada 5,35% pada fasa S dalam batas 5%. Kondisi frekuensi sistem listrik gedung berada pada batas yang diijinkan, yaitu dengan nilai fluktuasi tertinggi 50,24 Hz dan nilai frekuensi terendah pada 49,6 Hz. THD tegangan masih dalam batas yang diijinkan dengan nilai tertinggi 1,68% dari batas 3%, sedangkan THD arus mencapai nilai yang melebihi standard 5% untuk THD, yaitu pada 9,77%, dengan nilai penyumbang harmonik tertinggi pada orde kelima, yaitu 9,38%. Faktor daya terendah gedung berada pada nilai 0,62 tertinggal, dengan konsumsi daya 22,51 kVA dan daya aktif 13,99 kWatt pada pukul 18:34 WIB, jauh melebih batas standar yang diijinkan dengan kecenderungan penurunan mulai pukul 16:34 WIB.

The electrical power is needed in almost all sectors of human life, ranging from household, education, industry, etc. The low electrical power quality at a time will be able to inflict any damage, so that the evaluation of the quality of the electrical power it is very important to do. The purpose of this study is to evaluate the quality of electrical power at the Electrical Engineering Department building, and provides recommendations for maintaining or improving the quality of electric power to meet the standard. The method used is to do a survey of the activity of building, measurements, calculations, and simulation.
Evaluation results showed on the parameters of voltage, maximum voltage conditions and minimal system building is at the limit permitted, i.e. still within ± 10% of the 220 Volt, its highest value and the lowest 231.53 volts and 211.27 volts, and voltage unbalance value marginal 5.35% in S phase in the limit of 5%. The condition of the building's electrical system frequencies are at the limit permitted, i.e. with the highest fluctuation value 50.24 Hz and the frequency of the lowest value at 49.6 Hz. voltage THD is still within the limits permitted by the highest value 1.68% from the 3% limit, while the THD current reaches the value that exceeds the standard 5% THD at 9,77%, with the highest at harmonic order contributor in fifth, namely 9.38%. Lowest power factor of the building is on the left, with the value of 0.62 power consumption kVA active power and 22.51 13.99 kWatt at 18:34 GMT, far exceeds the standard limit permitted by the tendency of decrease starting at 4:34 pm."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S63138
UI - Skripsi Membership  Universitas Indonesia Library
cover
Janur Handaru Putra
"ABSTRAK
Gedung 1 dan 2 Departemen Teknik Elektro merupakan fasilitas tertua di Fakultas Teknik UI Depok sejak tahun 1986. Listrik untuk kedua gedung tersebut didistribusikan dari dua panel utama, yaitu panel P dan panel T yang terletak pada Gedung 2. Karena dipergunakan untuk ruang kerja, ruang dosen, laboratorium, dan ruang rapat yang sangat penting untuk keberlangsungan perkuliahan, maka diperlukan kualitas daya listrik yang baik agar fungsi semua perangkat tidak terganggu, dapat beroperasi dengan benar, dan tidak menjadi rusak. Audit instalasi gedung terakhir dilakukan 15 (lima belas) tahun lalu, yaitu tahun 2001. Dipandang perlu tahun ini dilakukan kembali audit instalasi untuk mendapatkan gambaran kondisi kualitas daya listrik Gedung 1 dan 2. Hasilnya digunakan sebagai acuan untuk perencanaan instalasi baru, perawatan rutin instalasi yang sudah ada, dan pemecahan masalah kelistrikan yang sering terjadi. Tahapan audit dimulai dengan melakukan pemeriksaan kelistrikan yang disebut dengan Audit Kualitas Daya, kemudian hasilnya akan dibandingkan dengan standar acuan setiap parameter listrik. Jika terdapat parameter listrik yang tidak sesuai dengan standar acuan, akan diberikan solusi. Kesimpulan yang didapat bahwa faktor daya panel P, dapat ditingkatkan hingga batas minimal standar faktor daya sebesar 0,85 dengan memasang kapasitor sebesar minimal 2,783 kVAR. Arus netral panel P dapat dikurangi dari 18 A hingga hanya sebesar 0,4 A. Untuk panel T perlu dipasang kapasitor pada fasa T sebesar minimal 0,62 kVAR. Dan arus netral panel T dapat dihilangkan dengan dilakukan perbaikan keseimbangan beban.

ABSTRACT
Buildings 1 and 2 owned by Department of Electrical Engineering are the oldest facilities in the Faculty of Engineering UI Depok since 1986. Electricity for those buildings is distributed from two main panels, panel P and T, which located on the Building 2. As those buildings are used for work space, faculty rooms, laboratories and meeting rooms that are critical to the sustainability of the lecture activity, it would require a good quality of electric power in order to make all devices in well function, not disturbed, can be operated properly, and not become damaged. The last installation audit was done 15 (fifteen) years ago, in 2001. Now it needs to re-do the installation audit to get an overview of the power quality conditions of Building 1 and 2. The results will be used as a reference for planning a new installation, routine maintenance of the existing installations, and solving electrical problems that often occur. Stages of installation audit starts by examining of electricity condition called Power Quality Audit, then the results will be compared to reference standards for every electrical parameters. If there are electrical parameters found as not comply with the standards, then solutions will be given. The conclusion of this paper are that the power factor of the panel P can be increased to the minimum limit (0.85) of power factor standard by installing capacitors of at least 2,783 KVAR. Neutral current of panel P can be reduced from 18 A up to only 0.4 A. For panel T, it needs to be installed a capacitor on phase T of at least 0.62 KVAR. And the neutral current of panel T can be removed by repairing balance the load."
2016
S64518
UI - Skripsi Membership  Universitas Indonesia Library
cover
Syarif Hidayatullah
"
Koordinasi Proteksi rele arus lebih menjadi bagian dari sistem proteksi tenaga listrik di pengeboran minyak lepas pantai. Penurunan produksi sumur menjadikan rekonfigurasi jaringan akan dilakukan sehingga studi koordinasi proteksi diperlukan agar mencapai keamanan dan keandalan operasional yang diinginkan. Studi koordinasi proteksi dilakukan dengan perangkat lunak Electric Transient and Analysis Program (ETAP). Studi ini membahas permasalahan koordinasi proteksi sistem eksisting pada sisi transmisi tenaga listrik akibat selektivitas proteksi yang kurang baik berdasarkan diagram star. Metodologi dalam perancangan ulang dilakukan dengan mengacu pada standar yang disesuaikan dengan sistem eksisting (ANSI) melalui perhitungan dengan luaran kualitatif. Perancangan ulang koordinasi sistem proteksi telah dilakukan sehingga mendapatkan koordinasi antar rele sesuai dengan tujuan awal (diatas 300ms antar rele).

Overcurrent relay protection coordination is part of the electric power protection system in offshore oil drilling. The decrease in well production means that network reconfiguration will be carried out so that a protection coordination study is required in order to achieve the desired operational security and reliability. Protection coordination studies were carried out using the Electric Transient and Analysis Program (ETAP) software. This study discusses the problem of coordinating the protection of the existing system on the power transmission side due to deficient protection selectivity based on the star diagram. The methodology for redesigning is carried out by referring to standards adapted to the existing system (ANSI) through calculations with qualitative outcomes. Redesigning the coordination of the protection system has been carried out to obtain coordination between relays in accordance with the initial goal (above 300ms between relays)."
Depok: 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Patria Mauluddin
"DC House merupakan suatu gagasan sistem kelistrikan rumah yang seluruhnya menggunakan beban DC. Sistem ini sangat baik untuk digunakan di daerah-daerah terpencil yang memiliki kendala untuk mendapatkan akses listrik. Sistem DC House biasanya diklasifikasikan pada tiga komponen utama yaitu pembangkit listrik, baterai, dan beban DC. Penulisan ini menggunakan sistem DC House yang terpisah dari pembangkit listrik, sehingga baterai beralih fungsi menjadi penyuplai daya utama. Oleh karena itu dilakukan analisis performa baterai atau Tabung Listrik TALIS yang akan digunakan pada rancangan sistem DC House dengan melihat karakteristik kurva discharge. Metodologi yang digunakan pada penelitian ini adalah metode pengosongan resistansi konstan untuk melihat performa sebenarnya ketika dipakai oleh pengguna. Didapatkan hasil pengujian Tabung Listrik 33 Ah dengan waktu pengosongan selama 23,6125 jam untuk skenario beban lampu dan 12,055 jam untuk skenario beban total. Energi yang dibutuhkan DC House adalah sebesar 0,234 kWh selama 24 jam untuk skenario beban lampu dan 0,2 kWh selama 12 jam atau 0,4 kWh selama jam 24 untuk skenario beban total.

DC House is an idea of a house electrical system that entirely uses DC loads. This system is good for use in remote areas that have constraints to gain access to electricity DC House systems are usually classified on three main components power plants, batteries, and DC loads. This writing uses a DC House system that is separate from the power plant, so the battery switch function becomes the main power supplier. Therefore, a battery or Electric Tubes TALIS performance analysis will be used in the planned DC House system by looking at the characteristics of the discharge curve. The methodology used in this study is the method of discharge of constant resistance to see the user 39 s real performance. The obtained test results for 33 Ah Power Tubes are discharge time of 23.6125 hours for the lamp load scenario and 12.055 hours for the total load scenario. The required energy for DC House system are 0.234 kWh in 24 hours for lamp load scenario and 0.2 kWh in 12 hours or 0.4 kWh in 24 hours for the total load scenario."
Depok: Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Aulia Hafiz
"Listrik merupakan kebutuhan yang dapat dikategorikan sebagai kebutuhan utama dalam keberlangsungan suatu rumah sakit. Kualitas daya listrik merupakan hal yang vital dalam sistem kelistrikan, apabila kualitas daya listrik buruk hal tersebut dapat memengaruhi umur performa peralatan elektronik, apabila masalah tersebut tidak ditanggulangi maka peralatan elektronik akan mengalami kerusakan. Pada penenilitan ini dilakukan pengukuran parameter kualitas daya listrik pada Panel AC Lift, Panel Lampu, dan Panel Cathlab pada Gedung Rumah Sakit Sentra Medika Cibinong. Parameter-parameter kualitas daya listrik yang diteliti ialah tegangan, arus, frekuensi, harmonisa, dan factor daya. Setelah didapatkan data akan dilakukan analisis dan perbandingan data hasil pengukuran dengan standar acuan yang telah ditentukan. Melalui hasil pengukuruan didapatkan nilai parameter tegangan, arus, dan frekuensi yang sesuai, namun tidak untuk nilai harmonisa dimana memiliki nilai TDD pada Panel Cathlab 36.97 dan Panel Lampu 29.894 . Sementara nilai factor daya pada Panel Cathlab juga tidak sesuai standar dimana nilainya 0.8016. Dengan dilakukannya penelitian ini dapat diperoleh solusi untuk meningkatkan mutu daya listrik pada Gedung Rumah Sakit Sentra Medika Cibinong.

Electricity is a necessity that can be categorized as a major need in the sustainability of a hospital. The quality of electric power is vital in the electrical system, if the bad electrical power quality can affect the age performance of electronic equipment, if the problem is not addressed then the electronic equipment will be damaged. In this study, the measurement of electrical power quality parameters in AC Lift Panel, Lamp Panel, and Cathlab Panel at Cibinong Medical Center Hospital Building. The parameters of electric power quality under study are voltage, current, frequency, harmonics, and power factor. After obtaining the data will be done analysis and comparison of measurement data data with reference standards that have been determined. The result shows that the parameters of voltage, current, and frequency are suitable, but not for harmonic values which have TDD value in Cathlab Panel 36.97 and Panel Lamp 29.894 . While the power factor value in Cathlab Panel is also not according to the standard where the value is 0.8016. With this research can be obtained a solution to improve the quality of electrical power at the Cibinong Medical Center Hospital Building."
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Daryanto
Jakarta: Bumi Aksara, 2003
621.31 DAR t
Buku Teks  Universitas Indonesia Library
cover
F. Suryatmo
Jakarta : Bumi Aksara , 2005
629.804 3 SUR t
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>