Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 3013 dokumen yang sesuai dengan query
cover
Dodge, H. Robert
Dallas: Business Publications, 1973
658.81 DOD f
Buku Teks  Universitas Indonesia Library
cover
Dalrymple, Douglas J.
New York: Wiley, [Date of publication not identified]
658.81 DAL s
Buku Teks  Universitas Indonesia Library
cover
Johnson, Lewis K.
Boston : Allyn and Bacon, 1957
658.81 JOH s
Buku Teks  Universitas Indonesia Library
cover
Still, Richard R.
Englewood Cliffs, NJ: Prentice-Hall, 1958
658.81 STI s
Buku Teks  Universitas Indonesia Library
cover
Still, Richard R.
Englewood Cliffs, NJ: Prentice-Hall, 1988
658.81 STI s
Buku Teks  Universitas Indonesia Library
cover
Dodge, H Robert
Dallas: , Texas Businnes Publicatins , 1973
658.81 D 304 f
Buku Teks  Universitas Indonesia Library
cover
cover
"The changes in stream water temperture help to identify the mechanism that generates the initil response . "
2010
551 LIMNO 17:2 (2010)
Artikel Jurnal  Universitas Indonesia Library
cover
Bonar Ari Nindito
"ABSTRAK
Tesis ini membahas tentang evaluasi terkait dengan opsi pengembangan LPG Plant untuk mendapatkan revenue yang maksimal di Lapangan ?X? sebagai produk tambahan dan nilai tambah selain komponen gas alam dan kondensat. Proses dasar LPG dari gas umpan adalah dengan menggunakan sistem Turbo Expander. Simulasi proses menunjukkan gas umpan dari Lapangan ?X? dapat menghasilkan produk LPG sebesar 84,89 ton per hari, kondensat sebesar 78,61 barel per hari dan lean gas sebesar 11,66 mmscfd selama 15 tahun. Dari sisi Kontraktor pengembangan LPG Plant di Lapangan ?X? dengan menggunakan metode Skenario A (skema processing fee) memiliki indikator ke-ekonomian terbaik dengan pendapatan untuk Kontraktor (NPV 12,5%) sebesar US$ 92,24Juta (skema PSC) dan sebesar US$ 167,76Juta (skema Non PSC). Dan dari sisi Pemerintah Indonesia dengan menggunakan metode Skenario B (skema EPCI) memiliki indikator ke-ekonomian terbaik dengan pendapatan untuk Pemerintah Indonesia (NPV 12,5%) sebesar US$ 176,60Juta (skema PSC) dan sebesar US$ 100,24Juta (skema Non PSC). Analisis sensitivitas terhadap pengembangan LPG Plant di Lapangan ?X? menunjukkan bahwa parameter yang paling mempengaruhi ke-ekonomian adalah harga jual LPG.

ABSTRACT
This tesis is discussing about evaluation plan of LPG extraction plant to obtain the maximum revenue in Lapangan "X" as additional product and added value from the existing ones which are natural gas and condensate. Selected process for LPG recovery is Turbo Expander. Process simulation shows the feed gas from Lapangan "X" can produce LPG products amounted to 84.89 tons per day, condensate 78,61 barel per days and lean gas 11,66 mmscfd for 15 years. From Contractor side the project development of LPG Plant in Lapangan "X" using Scenario A (schematic processing fee) has the best indicator economy with revenue obtained for Contractors (12.5% NPV) US $ 92,24MM (scheme PSC) and US $ 167,76MM (scheme Non PSC). And on the side of the Government of Indonesia using Scenario B (scheme EPCI) has the best indicator of all economies obtained revenue for the Government of Indonesia (NPV 12.5%) of US $ 176,60MM (scheme PSC) and amounted 100,24MM (scheme Non PSC). Sensitivity analysis on the development of LPG Plant in Lapangan "X" indicates that the parameter that most affects all economies is price of LPG."
2016
T46268
UI - Tesis Membership  Universitas Indonesia Library
cover
Battersby, Albert
Harmondsworth : Penguin Books, 1968
658.8 BAT s
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>