Ditemukan 36844 dokumen yang sesuai dengan query
Zhang, Boming
Singapore : Cengage Learning, 2011
621.319 ZHA a;621.319 ZHA a (2)
Buku Teks SO Universitas Indonesia Library
Akbar Muhammad Faizal
"Sumber daya alam cadangan gas dan jumlah produksi gas di wilayah kerja pada suatu sistem tenaga listrik offshore jaringan terisolasi di Sumatera sudah terindikasi menipis dan tidak dapat ditingkatkan kembali, sehingga perlu meminimalisir pengoperasian dari unit pembangkit. Tindakan tersebut dapat memungkinkan terjadinya masalah undervoltage pada beberapa bus di sistem karena tidak tersuplai dengan maksimal akibat unit pembangkit tersisa perlu memikul beban yang tersebar, maka dibutuhkan suatu alternatif rekonfigurasi jaringan untuk lebih mengoptimalkan kerja dari sistem tenaga listrik. Dengan melakukan rekonfigurasi jaringan pada sistem ini, akan mempengaruhi kondisi kestabilan pada sistem dan memerlukan suatu tambahan komponen pendukung seperti circuit breaker, kabel jaringan, dan transformator yang telah ditentukan spesifikasinya. Maka dari itu, dilakukan simulasi sistem menggunakan perangkat lunak ETAP dan beberapa studi yaitu aliran daya dan stabilitas dengan berbagai variasi skenario yang telah ditentukan. Berdasarkan hasil dari simulasi perangkat lunak ETAP, didapatkan alternatif rekonfigurasi jaringan adalah dengan melakukan penambahan saluran dari bus PAB01 atau PAB11 menuju bus yang ada pada unit bisnis utara seperti WIDP11, WIDA16, HYSY11, atau LISA11. Hasil simulasi aliran daya dan stabilitas didapatkan beberapa variasi skenario masih memenuhi standar grid code operasi sistem.
The reserve of natural gas resources and gas production levels in the working area of an isolated offshore power system in Sumatra are indicating to decreased and will not be increased, so it is necessary for power generation units to minimize the operation. This action may result an undervoltage problems on several buses in the power system, especially in central and north business unit because they are not supplied well due to the generations of remaining power generation units needs to bear the distributed load. Therefore, an alternative network reconfiguration was needed to optimize the performance of the power system. By doing the network reconfiguration in the system, it will affect the stability conditions and require additional supporting components such as circuit breakers, network cables, and transformers that have been specified. Therefore, a system simulation using ETAP software and several studies, including power flow and stability, with various predetermined scenarios, is needed. Based on the results of the ETAP software simulation, the alternative network reconfiguration was done by adding network cables from the bus PAB01 or PAB11 to the buses in the northern business unit such WIDP11, WIDA16, HYSY11, or LISA11. The power flow and stability simulation results show that several in scenario variations still meet the system's grid code operation standards."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership Universitas Indonesia Library
Weedy, B.M.
London : John Wiley & Sons, 1993
621.319 1 WEE e
Buku Teks SO Universitas Indonesia Library
Elgerd, Olle I.
Reading, Mass.: Addison-Wesley, 1977
621.31 ELG b
Buku Teks SO Universitas Indonesia Library
Rao, T.S. Madhava
New Delhi: Khanna, 1974
621.314 RAO p
Buku Teks SO Universitas Indonesia Library
Brown, Richard E.
Boca Raton: CRC Press, Taylor & Francis Group, 2009
621.319 BRO e
Buku Teks SO Universitas Indonesia Library
Still, Alfred
New York: McGraw-Hill, 1927
621.319 STI e
Buku Teks SO Universitas Indonesia Library
Woodruff, L.F.
New Delhi: Wiley Eastern, 1938
621.319 WOO p
Buku Teks SO Universitas Indonesia Library
Chapman, Stephen J.
New York: McGraw-Hill, 2002
621.310 42 CHA e
Buku Teks Universitas Indonesia Library
Mablekos, Van E.
New York: Harper and Row, 1980
621.30142 MAB e
Buku Teks SO Universitas Indonesia Library