Kresna Wijaya Muladi Putra
"Penelitian ini membahas faktor risiko dalam proses pengadaan pada proyek EPC yang berpengaruh pada kinerja waktu. Proses pengadaan menjadi penting karena biaya pada proses pengadaan mencapai 50-60% dari total biaya proyek. bahkan kebanyakan kegiatan pada proses ini berada pada jalur kritis proyek. oleh karena itu sangat penting untuk menemukan faktor risiko pada proses pengadaan yang mempengaruhi kinerja waktu proyek. Setelah faktor risiko utama tersebut ditemukan, maka dapat dilakukan strategi pengendalian risiko tersebut agar efek risiko yang ditimbulkan dapat diminimalisir agar proyek dapat berjalan dengan lancar dan selesai tepat pada waktu yang telah direncanakan.

This research discusses about risk factor in the procurement process on EPC project that influence on the time performance. The procurement process is important because cost of this process reach 50%-60% of the total project cost. Most of activity on this process are on the critical path of the project. Because of that, its important to find the risk factors that affects time performance of the project. After found the dominant risk factors, the risk control strategies can be made to minimize risk effect on the project, so the project can continue smoothly and can be finished on time."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S55380
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sitorus, Juanto
"Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor risiko yang mempengaruhi kinerja waktu proyek EPC gas di Indonesia, dari sisi kontraktor. Proses di dalam manajemen risiko proyek adalah identifikasi faktor-faktor risiko, analisa risiko, evaluasi risiko, dan tindakan mengelola risiko (treatment atau risk response). Penelitian untuk mengetahui faktor-faktor risiko dilakukan secara kualitatif, dengan menganalisis data persepsi yang didapat dari kuisioner dengan reponden manajer proyek, atau team inti proyek perusahaan EPC yang ada di Indonesia dan mempunyai pengalaman dalam proyek EPC gas. Analisa data diolah dengan statistik deskriptif, uji U Mann-Whitney, uji Kruskal-Wallis, analytic hierarchy process (AHP), dan analisa level risiko, untuk mendapatkan prioritas/rangking faktor. Korelasi nonparametris dilakukan dengan korelasi Kendall Tau dan Spearman, yang dilanjutkan dengan validasi ke pakar, dan validasi ke proyek EPC gas yang sedang berjalan. Hasil analisa data menunjukkan ada empat faktor risiko utama yang berpengaruh terhadap kinerja waktu proyek EPC gas di Indonesia, yaitu: keterlambatan kedatangan critical equipment yang menghambat pekerjaan lain; jadwal pengadaan material dan equipment yang sangat ketat; pemebelian peralatan dan bulk material dan equipment yang sangat ketat. pemelian peralatan dan bulk material yang kritis dan sukar diperoleh (long lead item equipment and bulk material). Perubahan desain selama proyek. Dari analisa korelasi nonparametris dengan bantuan SPSS ver 13 terlihat bahwa faktor risiko berkorelasi dengan kinerja waktu dan faktor risiko menurunkan waktu proyek.

Engineering, procurement, and construction project (EPC) were involved with many people and used a lot of resources faced a lot of uncertainty and risk which were happened, would be impact the performance of the project. This research objective is to identify the risk factors that influenced time performance of EPC Gas Project in Indonesia, from the contractor's point of view. The project management processes are risk factor identification, the risk analysis, risk evaluation, risk response or risk treatment. The risk factors research try to find out qualitatively, by analyzing the perception data as the result of the questioners to the project manager, the core team of the EPC gas project. Risk analysis quantified the risk variable from the questioner result, and then the data will be processes with descriptive statistic, Mann-Whitney U test, Kruskal-Wallis test, and analytic Hierarchy Process (AHP) in order to have priority factor. There are four main risk factor that influence time performance of EPC gas project in Indonesia: delay of delivery of critical equipment; purchasing schedule of material and equipment; purchasing of long head items equipment & bulk material; likelihood of changes during the course of project. Based on correlation analysis between risk factor and time performance with nonparametric correlation through SPSS ver.13 found that risk factor have correlation with time performance and risk factor decrease time performance."
Depok: Fakultas Teknik Universitas Indonesia, 2008
T24960
UI - Tesis Open  Universitas Indonesia Library
cover
Dwinanto Budi Prakoso
"Infrastruktur yang ditunjukkan kepada publik, seperti proyek jalan tol, proyek bendungan, dan lain-lain. Makna umum dari proyek proyek "peralatan yang kompleks" adalah sesuatu yang menggunakan alat berat yang digunakan dalam 1 aktivitas. Termasuk manajemen waktu ke dalam proses yang diperlukan untuk memastikan waktu penyelesaian proyek. Sistem manajemen waktu berpusat pada apakah perencanaan dan menjalankan penjadwalan proyek. Dimana dalam perencanaan penjadwalan dan telah memberikan bimbingan khusus untuk menyelesaikan proyek-proyek lebih cepat dan juga optimal. Penelitian dilakukan dalam upaya untuk mendapatkan atau menentukan faktor dominan yang akan menyebabkan risiko keterlambatan proyek, terutama pada "peralatan yang kompleks". Pencarian intensif dilakukan dengan menyebarkan kuesioner dan pengumpulan data.
Hasil diharapkan dalam hal ini akan menunjukkan hubungan faktor risiko dalam proyek "peralatan kompleks" yang akan mempengaruhi keterlambatan dari rencana proyek selesai. Penelitian ini juga menyimpulkan bahwa dari uji chi square dan model uji regresi mendapatkan persamaan persepsi ini setiap responden faktor penyebab keterlambatan proyek solusi pada proyek jalan di Surakarta, ditinjau dari posisi responden, pengalaman responden, menilai proyek, jenis proyek yang digunakan tingkat kepercayaan 95% atau alpha 0,05 = 5% mendapatkannya sum chi square (table chi square atau signifikansi symptotic) 0,05, sehingga Ho diterima, H1 mendorong dan uji regresi mendapat sum r > dari r tabel atau jumlah F > F tabel sehingga ganda koefisien korelasi signifikan diuji, dengan peringkat bersalah 5% atau 1%.

Indonesia and also developing countries other emerging working on infrastructure projects shown to the public, such as highway projects, dam projects, and others. General meaning of the project "complex equipment" project is something that using heavy equipment used in 1 activity. Including time management into the processes required to ensure project completion time. Time management system centered on whether or not the planning and running projects scheduling. Where in the scheduling planning and has provided specific guidance to complete projects more quickly and also optimal. The study was conducted in an attempt to obtain or determine the dominant factors that will cause any risk of project delays, especially on "complex equipment". The intensive search conducted by distributing questionnaires and data collection.
Results are expected in this case will show the relationship of risk factors in the project "complex equipment" that will affect the delay of the project plan is completed. This Research also conclude that from chi square test and regression model test get this perception equation each responder to factor cause of delay of project solution on road project in Surakarta, evaluated from responder position, responder experience, assess the project, project type that is used 95% belief level or alpha 0.05 = 5% get it sum chi square (table chi square or a symptotic significance) 0.05, so Ho accepted, H1 pushed and regression test got sum r > from table r or sum F > table F so that double correlation coefficient significance tested, with guilt rank 5% or 1%.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
S60801
UI - Skripsi Membership  Universitas Indonesia Library
cover
Farid Kasmi
"Hubungan Pemilik proyek (owner) dan kontraktor dalam suatu proyek konstruksi memiliki peranan penting dalam keberhasilan proyek. Tidak jarang permasalahan proyek berawal dari perbedaan persepsi antara pemilik proyek dan kontraktornya yang berujung pada klaim dan dispute. Manajemen Komunikasi Proyek menjadi suatu disiplin yang dapat mengatur keselarasan hubungan komunikasi antara pihak-pihak yang terlibat di dalam proyek, termasuk antara kontraktor dan owner.
Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor dominan dalam manajemen komunikasi proyek EPC antara kontraktor (PT.X) dan pemilik proyek pada tahap engineering yang mempengaruhi kinerja waktu, sekaligus tindakan terhadap faktor-faktor tersebut sebagai respon resiko utama.
Proses penelitian dimulai dari identifikasi faktor-faktor risiko, analisa risiko, evaluasi risiko, dan tindakan mengelola risiko (treatment atau risk response). Penelitian untuk mengetahui faktor-faktor risiko dilakukan secara kualitatif, dengan menganalisis data persepsi yang didapat dari kuisioner dengan responden manajer proyek, atau team inti proyek pada PT.X yang mempunyai pengalaman dalam proyek EPC. Analisa data diolah dengan melakukan uji Reliability, uji U Mann-Whitney, uji Kruskal-Wallis, serta pendekatan Analytic Hierarchy Process (AHP) dan analisa level risiko untuk mendapatkan prioritas/rangking faktor. Korelasi nonparametris dilakukan dengan korelasi Kendall Tau dan Spearman. Validasi ke pakar dilakukan baik pada tahap penentuan variabel maupun validasi hasil penelitian.
Hasil analisa data menunjukkan terdapat delapan faktor-faktor dominan yang berpengaruh terhadap kinerja waktu proyek EPC yang dilakukan PT. X, antara lain : Keterlambatan penyelesaian pekerjaan (design) dan aktivitas berikutnya yang diakibatkan oleh jangka waktu persetujuan dari pemilik proyek terhadap dokumen yang diajukan oleh kontraktor tidak dibatasi atau melebihi batas waktu yang disepakati, Terjadi penyimpangan informasi dan timbulnya idle time akibat alur informasi dan koordinasi yang berbelit-belit dari kontraktor ke owner, Timbulnya idle time (waktu tunggu) akibat kurang jelasnya alur approval dari kontraktor ke owner, dan Terjadinya idle time akibat gambaran Informasi yang disampaikan tidak jelas. Dari analisa korelasi nonparametris terlihat bahwa factor risiko tersebut berkorelasi menurunkan kinerja waktu proyek.

The Relation between owner and the contractor in a construction project, shows important role to performance of project. Not rarely, problems of project is caused by difference of perception between owner and the contractor of which resulting claim or dispute. Recently, Management Communications of Project becomes a discipline that is able to control compatibility of communications among stakeholders concerned in project, including contractor and the owner.
The objective of this research is to know dominant factors in communications management of EPC Project between the contractor ( PT.X) and the owner during phase of engineering influencing time performance, and to find the risk respond of them.
Research process started from identifying risk factors, risk analysis, risk evaluation, and action ( or treatment of risk response). The risk factors research try to find out qualitatively, by analyzing the perception data as the result of the questioners to the project manager, the core team of the EPC project company in Indonesia and whom had the experienced in EPC. The data is processed by descriptive statistic, Mann-Whitney U test, Kruskal-Wallis test, and Analytic Hierarchy Process (AHP) in order to have the priority factor, and continued with validation to expert.
Data analysis results, there are eight dominant factors which have significant effect to time performance of project, Delay of design process and activities caused unlimited time or expired status to approval documents, Interrupted informations and idle time caused complicated flow of information and coordination beetween contractor and the owner, and idle time caused the detail information is unclear. This research performs that risk factor may influence the time performance, relatively.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
R.01.08.48 Kas i
UI - Skripsi Open  Universitas Indonesia Library
cover
Yuli Irawan
"Salah satu kekhasan proyek yang ruang lingkupnya dinamis adalah proyek tersebut dapat berkurang ataupun bertambah, bisa berurutan atau tidak. Sebagai contoh ketika saat pelaksanaan pekerjaan, ternyata unit yang diperiksa masih layak untuk digunakan, maka ditunda dulu pekerjaannya tersebut. Begitu pula bila pada suatu rangkaian unit produksi terdapat perbaikan yang harus didahulukan, walaupun tidak berada pada rangkaian unit yang pertama , maka harus dilakukan perbaikan terlebih dahulu. Tetapi dikarenakan dari pihak perusahaan hanya menyediakan waktu yang sedikit, maka pengelolaan proyek yang ruang lingkupnya dinamis tersebut harus dilakukan dengan cepat dan tepat.
Dalam studi kasus ini, penulis menemukan proyek yang mempunyai ruang lingkup dinamis proyek turnaround di sebuah perusahaan petrokimia. Pada proyek turnaround, kinerja yang paling diutamakan adalah mutu dan safety, baik selama proyek berlangsung, maupun setelah selesai dan digunakan oleh user. Hal ini dapat dipahami karena produksi perusahaan petrokimia menggunakan bahan-bahan yang berbahaya dan juga menggunakan reaktor nuklir, sehingga beresiko tinggi. Namun dengan semakin kompetitifnya perusahaan petrokimia, maka kinerja waktu proyek turnaround juga harus diperhitungan, agar tidak ada anggapan bahwa proyek tersebut adalah proyek yang banyak memakan waktu dan tentu saja biaya. Dalam upaya meminimalkan permasalahan kinerja waktu pada proyek turnaround, digunakan manajemen resiko. Dimulai dari identifikasi resiko sampai dengan respon resiko yang diambil atas dampak yang ditimbulkan.
Dalam penelitian ini, metode yang digunakan adalah pendekatan metode kuantitatif dengan alat bantu statistika nonparametrik yang dilakukan pada 26 orang karyawan maintenance perusahaan CA. Dengan dibantu metode AHP untuk melakukan pembobotan resiko, kemudian melakukan korelasi rank Spearman, diperoleh 2 (dua) faktor yang mempengaruhi kinerja waktu pada proyek turnaround, yaitu: masih terdapat item-item yang belum masuk schedule dan keterlambatan material yang dibeli dari luar negeri. Adapun respon resiko yang diambil untuk meminimalkan dampak yang ditimbulkan adalah dengan mitigate yaitu melibatkan engineer kontraktor pada tahap detil perencanaan dan perancangan, dan transfer yaitu mengalihkan kerugian atas keterlambatan material kepada pihak asuransi.

One of spesification project with dynamic scope its extent space project can decrease and or increase, can in a series or not. For example when moment job execution, obvious unit that inspected to still proper to be used, so postponed formerly the job. So also when at one particular production unit series found repair that, although doesn't present in first unit series, so must be done repair beforehand. But caused by from side companies only prepare time a little, so project management with dynamic scope its extent space must be done swiftly and correct.
In this case study, author finds project that has dynamic scope in turnaround project at a companies petrochemical. In project turnaround, performance most gived quality and safety, good during project goes on, also after finished and used by user. This matter perceivable because production company petrochemical use dangerous ingredients and also use buclear reactor, so that tall risky. But with more the competitiveer company petrochemical, so project time performance turnaround, also must be gived, so that there is no opinion that project project many consume time and of course cost. In the effort minimize time performance troubleshoot in project turnaround, used risk management. Begun from risk identification up to risk response on impact that evoked.
In this watchfulness, method that used approach quantitative method by means of helps statistika nonparametrik that done in 26 employees maintenance company CA. With helped method AHP to help risk leveling, then do correlation rank spearman, got 2 (two) factors that influence time performance in project turnaround, that is: still found items not yet enter schedule and materials slowness that bought from outside country. As to risk response to minimize impact that evoked with mitigate that is involve engineer contractor in planning stage, and transfer that is shift loss on materials slowness to insurence side."
Depok: Fakultas Teknik Universitas Indonesia, 2008
T 24888
UI - Tesis Open  Universitas Indonesia Library
cover
Andriani Karunia Prameiswari
"Proyek EPC memiliki tingkat risiko yang cukup tinggi. Permasalahan yang biasanya terjadi dalam proyek EPC adalah keterlambatan dan cost overrun. Pada proyek konstruksi, pengadaan material memiliki 50-60% dari total biaya. Angka tersebut cukuplah besar sehingga pengadaan material ini memiliki pengaruh yang cukup besar terhadap risiko yang mungkin saja terjadi dalam proyek EPC. Tujuan dari penelitian ini untuk mengidentifikasi faktor risiko yang berpengaruh, penyebab risiko dominan dan rekomendasi risiko.Data yang didapatkan akan dilakukan analisa risiko, analisa korelasi, analisa faktor dan analisa regresi. Hasil penelitian berupa faktor risiko dominan yang berpengaruh terhadap kinerja waktu yaitu "Perubahan Spesifikasi yang Mempengaruhi Pembuatan" dan "Ketidaktersediaan Material" sedangkan untuk kinerja biaya "Perubahan Spesifikasi Material" dan "Perencanaan dan estimasi biaya tidak dilakukan dengan tepat".

EPC project has high risk level. Problems that usually happen in EPC project are delay and cost overrun. On the construction project, 50-60 % of project work to be performed by material procurement. The percentage is large enough so that provision of material has a considerable influence on the risk that may occur in the EPC Project.fy factor influencing risk, the risk causes dominant and recommendation of risk. Data analyzed by risk analysis, correlation, factor analysis and regression analysis.The result is the dominant risk factor that affect the time performance are "Change specification that affect production" and "Not availability Material" while factor that affect cost performance are "Change specification that affect production" and "Planning and cost estimation not precisely""
Depok: Fakultas Teknik Universitas Indonesia, 2014
S55988
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ni Made Kerthina Mela Octavia
"[ABSTRAK
Pembangunan infrastruktur dalam bidang transportasi untuk menambah kapasitas jalan khususnya proyek Jalan Layang Non Tol merupakan salah satu alternatif yang diharapkan dapat menanggulangi masalah kemacetan lalu lintas di DKI Jakarta. Namun pada pelaksanaan proyek Jalan Layang Non Tol di DKI Jakarta mengalami keterlambatan dari rencana penyelesaian. Penelitian ini bertujuan untuk untuk mendapatkan resiko pada penerapan metode konstruksi yang
mempengaruhi kinerja waktu pembangunan Jalan Layang Non Tol yang dilihat dari sudut pandang pemilik proyek (owner) dan kontraktor. Resiko yang harus diperhatikan adalah resiko keterlambatan kedatangan alat pada tahapan erection box girder. Dengan melakukan menjadwalkan kedatangan alat dapat digunakan untuk mencegah munculnya resiko tersebut.;

ABSTRACT
Infrastructure development in the transportation sector to increase the road
capacity especially Jalan Layang Non Tol project is one alternative that expected
to solve the problem of traffic jam in Jakarta. However, the implementation of
Jalan Layang Non Tol project is delayed from the plan. This study aimed to
obtain the risk of the application of the construction method that affect the time
performance of Jalan Layang Non Tol development from the perspective of the
owner and contractor. The dominan risks that must be considered is delay in the
tools arrival on stade box girder erection. To prevent the dominan risk by doing
scheduled arrival of the tools.;Infrastructure development in the transportation sector to increase the road
capacity especially Jalan Layang Non Tol project is one alternative that expected
to solve the problem of traffic jam in Jakarta. However, the implementation of
Jalan Layang Non Tol project is delayed from the plan. This study aimed to
obtain the risk of the application of the construction method that affect the time
performance of Jalan Layang Non Tol development from the perspective of the
owner and contractor. The dominan risks that must be considered is delay in the
tools arrival on stade box girder erection. To prevent the dominan risk by doing
scheduled arrival of the tools.;Infrastructure development in the transportation sector to increase the road
capacity especially Jalan Layang Non Tol project is one alternative that expected
to solve the problem of traffic jam in Jakarta. However, the implementation of
Jalan Layang Non Tol project is delayed from the plan. This study aimed to
obtain the risk of the application of the construction method that affect the time
performance of Jalan Layang Non Tol development from the perspective of the
owner and contractor. The dominan risks that must be considered is delay in the
tools arrival on stade box girder erection. To prevent the dominan risk by doing
scheduled arrival of the tools.;Infrastructure development in the transportation sector to increase the road
capacity especially Jalan Layang Non Tol project is one alternative that expected
to solve the problem of traffic jam in Jakarta. However, the implementation of
Jalan Layang Non Tol project is delayed from the plan. This study aimed to
obtain the risk of the application of the construction method that affect the time
performance of Jalan Layang Non Tol development from the perspective of the
owner and contractor. The dominan risks that must be considered is delay in the
tools arrival on stade box girder erection. To prevent the dominan risk by doing
scheduled arrival of the tools., Infrastructure development in the transportation sector to increase the road
capacity especially Jalan Layang Non Tol project is one alternative that expected
to solve the problem of traffic jam in Jakarta. However, the implementation of
Jalan Layang Non Tol project is delayed from the plan. This study aimed to
obtain the risk of the application of the construction method that affect the time
performance of Jalan Layang Non Tol development from the perspective of the
owner and contractor. The dominan risks that must be considered is delay in the
tools arrival on stade box girder erection. To prevent the dominan risk by doing
scheduled arrival of the tools.]"
Salemba: Fakultas Teknik Universitas Indonesia, 2014
T42882
UI - Tesis Membership  Universitas Indonesia Library
cover
Runita Listiarini
"Proyek EPC memiliki tingkat risiko yang cukup tinggi. Keterlambatan dan cost overrun merupakan permasalahan yang sering terjadi pada proyek. Keterlibatan subkontraktor dalam pelaksanaan pekerjaan konstruksi sangat tinggi sehingga pengaadaan subkontraktor mempunyai pengaruh cukup besar pada proyek EPC. Penelitian ini dilakukan untuk mengidentifikasi faktor risiko yang berpengaruh, penyebab dan dampak risiko tersebut, dan tindakan preventif dan korektifnya. Metode penelitian ini melalui studi literatur, survey kuesioner, dan validasi pakar. Hasil penelitian menunjukkan faktor risiko yang berpengaruh terhadap kinerja waktu yaitu "Subkontraktor tidak memahami konsep proyek dengan baik" dan "Tidak lengkapnya klausal kontrak antara pihak kontraktor EPC dengan subkontraktor" sedangkan untuk kinerja biaya yaitu "Kurang lengkapnya kriteria penilaian teknis dalam menilai kualifikasi peserta lelang", "Pembayaran subkontraktor yang telat dan tidak sesuai", dan "Kekurangan tenaga kerja pada pihak subkontraktor".
EPC project has high risk level. Delay and cost overrun are problems that usually happen. Subcontractor’s high involvement in execution of construction work so that provision of services has a considerable influence on the risk that may occur in the EPC Project. The purpose of this research are to identification risk factor that influenced, cause and effect, preventive and corrective action from risk factor. Method in this research through literature review, survey by using questionnaire, and expert judgement. The result obtained in this research is the risk factor that affect time performance are "Subcontractor do not understand the concept of project well" and "Incomplete clause of the contract between EPC contractor and subcontractor" while risk that affect cost performance are "Incomplete technical assessment criteria in assessing the bidders qualifications", "Subcontractor payments are late and do not suitable", and "lack of labor on the part of subcontractor"."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S56043
UI - Skripsi Membership  Universitas Indonesia Library
cover
Herlina Sriwati
"Lingkungan bisnis yang semakin kompleks, turbulen serta berorientasi global menuntut perusahaan dikelola secara profesional. Pemilihan visi, misi dan strategi bisnis yang tepat akan memudahkan perusahaan mencapai sasarannya jika didukung oleh strategi SDM, struktur dan budaya perusahaan yang tepat dan sesuai. Strategi SDM yang diperlukan dalam era globalosasi ini untuk memenangkan persaingan di pasar global adalah SDM yang berkualitas. Dalam meningkatkan SDM berkualitas, diperlukan keterlibatan kepegawaian secara proaktif dimulai dari perencanaan karir para karyawan perusahaan. Akan tetapi betapapun baiknya suatu rencana karir yang telah dibuat oleh seorang karyawan yang disertai oleh suatu tujuan karir yang wajar dan realistik, rencana tersebut tidak akan menjadi kenyataan tanpa adanya pengembangan karir yang sistematik dan programatik baik dari karyawan itu sendiri maupun perusahaan. Tanpa usaha khusus manajemen dalam mengubah manajemen sumber daya manusia, maka sumber daya manusia perusahaan akan tertinggal, dan perusahaan akan semakin menjadi tidak kompetitif. Dalam hubungan ini perlu diambil langkah-langkah untuk menata dan mengendalikan pengembangan SDM di perusahaan agar lebih meningkatkan pelayanan kepada karyawan. Kegiatan pelayanan kepada karyawan diarahkan untuk memberikan informasi dan mengembangkan manajemen karir sesuai dengan kebutuhan karyawan sehingga akan memperbaiki motivasi, kinerja dan komitmen karyawan. Analisis yang dilakukan adalah mengidentifikasi faktor-faktor manajemen karir di suatu perusahaan yang berpengaruh terhadap kinerja waktu proyek. Metode yang digunakan adalah metode survey yang dilakukan di salah satu perusahaan jasa konstruksi. Pengolahan data dilakukan dengan menggunakan alat bantu program AHP. Diharapkan hasil analisis dapat menjadi bahan pertimbangan bagi perusahaan dalam menentukan kebijakaan manajemen karir.

In environment business which progressively complex, turbulen and also orient global claim company managed professionally. The correct chosen of vision, mission and business strategy will facilitate the target of company if supported by strategy of human resource, the right culture and structure of company. Strategy of human resource which needed in this era of globalosasi to win emulation in global market is the human resource which with quality. In improving human resource which with quality, it needed involvement of officer by proaktif started from planning of career of employeeses. However, the good career plan which have been made by a employees accompanied by fair career target and realistic, the plan will not become fact without existence of development of systematic career and programatic either from itself employees and company. Without a special effort of management in altering human resource management, hence human resource of company will drop behind, and company will progressively becoming not competitif. In this relation require to be taken an action to arrange and control development of human resource in company so that more improve service to employees. Activity of service to employees instructed to give information and develop career management as according to requirement of employees so that will improve motivation, and performance of comitmen employees. The taken analysis is identifying career management factors in a company which having an effect on to time project performance. The used method is method of survey in one of the construction service firm. The processing data using appliance assist program of AHP. The expected result of analysis can become consideration for company in determining career management policy."
Depok: Fakultas Teknik Universitas Indonesia, 2008
T21251
UI - Tesis Open  Universitas Indonesia Library
cover
Silmi Mardiatusholihah
"ABSTRAK
Kontrak design and build merupakan inovasi kontrak konstruksi yang baik digunakan untuk pembangunan proyek konstruksi yang memiliki risiko tinggi dan dapat mempercepat durasi pekerjaan. namun, dalam kenyataan, kontrak design and build banyak mengalami keterlambatan pelaksanaan proyek karena kurangnya pengelolaan kontrak tersebut. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor risiko pengelolaan kontrak rancang bangun yang berpengaruh terhadap kinerja waktu proyek dengan menggunakan metode survei, melakukan wawancara dan menyebar kuisioner kepada pakar, pilot survey, dan responden. Terdapat 19 faktor risiko dominan setelah validasi pakar akhir dan dilakukan respon risiko tersebut untuk memperoleh kinerja waktu yang efisien.

ABSTRACT
Design and build contract is a good innovation of contruction contract that is used for construction development with high risk and it can accelerate work duration . however, in real case, design build contract has a lot of experience delays in project implementation due to lack of contract management. This research aims to identify risk factors in design and build contract management that affect project time performance using survey method through interview and questionnaire to experts, pilot survey, and respondents. After expert validation, there are 19 dominant risk factors identified and risk responses were done to achieve efficient time performance. "
2017
S69734
UI - Skripsi Membership  Universitas Indonesia Library