Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 119575 dokumen yang sesuai dengan query
cover
Anindyolaras Cahyo Pramusinto
"Instalasi pengolahan air minum dalam prosesnya akan menghasilkan limbah yang berupa lumpur. Berdasarkan Peraturan Pemerintah no. 16 tahun 2005 tentang Pengembangan Sistem Penyediaan Air Minum pasal 9 ayat 3 bahwa limbah akhir dari proses pengolahan air baku menjadi air minum wajib diolah terlebih dahulu sebelum dibuang ke sumber air baku dan daerah terbuka. Instalasi Pengolahan Air Minum Cibinong merupakan salah satu instalasi yang belum melakukan pengolahan limbah dari proses pengolahan air karena limbah yang dihasilkan langsung dibuang ke sungai Ciliwung. Jumlah timbulan debit lumpur dengan aliran kontinyu IPAM Cibinong I sebesar 394,35 m3/hari dan IPAM Cibinong II sebesar 187,44 m3/hari.
Tujuan dari penelitian ini untuk merencanakan instalasi pengolahan lumpur guna mentaati peraturan yang berlaku. Berdasarkan neraca massa dapat diketahui unit penghasil lumpur yang signifikan adalah unit sedimentasi, dikarenakan massa lumpur yang dihasilkan cukup besar. Akan direncanakan unit pengolahan lumpur yang terdiri dari proses thickening, chemical conditioning, dan dewatering. Pemilihan unit tahap dewatering pengolahan tersebut berdasarkan analisa SWOT dan metode decision matrix, kemudian diperoleh mechanical dewatering dengan menggunakan centrifuge.
Berdasarkan luas lahan, timbulan cake lumpur, dan kebutuhan polimer dipilih instalasi pengolahan lumpur yang terdiri dari 2 buah bak ekualisasi. Dimana 1 bak ekualisasi mengumpulkan lumpur dari unit flokulasi dan air pencucian filter, selanjutnya menuju chemical conditioner, recovery basin¸ dan gravity thickener. Sedangkan bak ekualisasi lainnya mengumpulkan lumpur dari unit sedimentasi menuju gravity thickener kemudian menuju centrifuge.

Water treatment plant produced sludge in a large quantity. Based on Government Regulation No. 16, 2005 in which under item 3 of the article 9, it is stipulated that the waste produced from any processing must be treated before it is discharged into water sources and open areas. The sludge generated from WTP Cibinong I and II is directly discharge into stream Ciliwung. The sludge generation of WTP Cibinong I in continuous flow is 394,35 m3/day and WTP Cibinong II is 187,44 m3/day.
The aim of this study is to plan for sludge treatment plant in order to comply with applicable regulations. Based on the mass balance, sedimentation is a unit which significantly produced sludge in large quantity. Sludge treatment plant will be planned consists of thickening process, chemical conditioning, and dewatering. The selection of dewatering processing unit is based on SWOT analysis and decision matrix method, with this tools it can be concluded that centrifuge will be used.
Based on land area, sludge generation, and need of polymer, will be selected sludge treatment plant which has 2 equalization basins. One equalization basin will collect the sludge from flocculation unit and backwash water and towards to chemical conditioner, recovery basin, and will be mixed in gravity thickener with outflow from other equalization basin which collects sludge from sedimentation. After that, it will toward to mechanical dewatering centrifuge.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S53053
UI - Skripsi Membership  Universitas Indonesia Library
cover
Yunisa Vaditasari
"Instalasi Pengolahan Air Minum (IPAM) di Indonesia selalu menghasilkan residu lumpur yang sebagian besar langsung dibuang ke badan air tanpa pengolahan terlebih dahulu. Salah satu upaya untuk mengurangi lumpur yang dibuang ke badan air adalah dengan memanfaatkan kembali lumpur ke dalam proses Koagulasi-Flokulasi-Sedimentasi (KFS). Dalam aplikasi pada penelitian ini, pemanfaatan lumpur dilakukan dengan lima variasi yaitu penentuan dosis optimum koagulan, dosis optimum lumpur, dosis lumpur pada dosis optimum koagulan, dan dosis koagulan pada dosis optimum lumpur. Setelah seluruh variasi dilakukan dilanjutkan dengan identifikasi variabel bebas yang signifikan melalui full factorial design.
Metode yang digunakan adalahjartest menggunakan air baku Sungai Ciliwung dan lumpur IPAM Cibinong serta koagulan alum (Al2(SO4)3). Pada kajian penentuan dosis optimum koagulan divariasikan mulai dari 10 ppm - 50 ppm. Pada kajian penentuan dosis lumpur terlebih dahulu dilakukan uji karakteristik lumpur yang menentukan lumpur yang akan digunakan. Variasi pemanfaatan kembali lumpur dimulai dari 1%-10% dengan interval 1% dalam volume 500 mL beaker glass. Dalam setiap variasi yang dilakukan, dihitung parameter-parameter yang mempengaruhi kajian tersebut antara lain kekeruhan, suhu, pH, KMnO4, Fe, dan Koliform total.Lumpur yang tepat digunakan berupa lumpur sedimentasi Kombinasi paling tepat adalah variasi ke-5 dengan kombinasi dosis optimum lumpur sebesar 5% dan dosis koagulan 37.5 ppm. Penyisihan kekeruhan berturut-turut 97.46% & 97.23%, KmnO4 18.23% & 13.3%, Fe 84% & 85.74%, serta koliform total sebesar 98.86% dengan pH 6.69 dan suhu 27.5°C.
Hasil ini didukung dengan identifikasi variabel bebas dengan metode full factorial design dimana hasil paling signifikan dalam menyisihkan kekeruhan dan koliform total adalah interaksi antara koagulan dan lumpur dan dalam menyisihkan KmnO4 dan Fe adalah dosis koagulan. Pemanfaatan kembali lumpur tidak dapat mengurangi pemakaian koagulan, namun dapat meningkatkan efisiensi penyisihan kontaminan.

Water Treatment Plant (WTP) in Indonesia always produce sludge residuals that are directly discharged into the water body without being processed first. One of the measures to reduce sludge that is discharged into the water bodies is to reuse sludge in coagulation-floculation-sedimentation (K-F-S) processes. In the application of this study, sludge resirculation is conducted with five variations which are the optimum dosage of coagulant, the optimum dosage of sludge, sludge dosage at optimum dosageof coagulant, coagulant dosage at optimum dosage of sludge. After all variations conducted, continue with identification of significant independent variables using full factorial method.
The method used is jartest using raw water from Ciliwung River and Sludge from IPAM Cibinong with alum coagulant (Al2(SO4)3). In studies deterimining the optimum coagulant dose varied 10 ppm - 50 ppm. In determining optimum dose of sludge first tested the sludge characteristics to determine the sludge that will be used. Sludge reuse varied from 1%-10% with 1% intervalin500 mL volume of beaker glass. Parameters tested from each variations are turbidity, temperature , pH, KMnO4, Fe, and Total Coliform. Sludge use is sedimentation sludge. The most appropriate combination is the fifth variation with 5% sludge optimum dosage and coagulant optimum dosage 37.5 ppm. Allowance turbidity removal were 97/46% & 97.23%, KMnO4 18.23% & 13.3%, Fe minerals 84% & 85.74%, and total coliform 98.86% with pH 6.69 and temperature 27.5°C.
This result is supported by independent variables identification with full factorial design method which the most significant in removing turbidiy and total coliform in water is interactions between coagulant and sludge and in removing KMnO4 and Fe is coagulant dosage. Sludge reuse cannot reduce coagulant dosage, but able to improve contaminant removal efficiency.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S52998
UI - Skripsi Membership  Universitas Indonesia Library
cover
Satria Kharisma R.
"Tingginya laju pertumbuhan penduduk Kecamatan Cibinong, Kabupaten Bogor sebesar 4,63% per tahun, perlu diimbangi dengan peningkatan kapasitas penyediaan layanan air minum guna memenuhi peningkatan kebutuhan air minum masyarakat. Berdasarkan hal tersebut, penelitian ini bertujuan untuk melakukan peningkatan kapasitas Instalasi Pengolahan Air Cibinong (IPA Cibinong) melalui evaluasi dan pengembangan (uprating). Kondisi eksisting IPA Cibinong PDAM Tirta Kahuripan Kabupaten Bogor, berkapasitas 330 L/detik memiliki dua WTP yaitu, WTP 1 kapasitas 100 L/detik dan WTP 2 kapasitas 230 L/detik. Evaluasi dilakukan untuk WTP 2 karena memiliki potensi peningkatan kapasitas produksi. Evaluasi dilakukan pada unit intake, koagulasi, flokulasi, sedimentasi, filtrasi, dan reservoir berdasarkan kriteria desain.
Hasil evaluasi menghasilkan kapasitas maksimum WTP 2 sebesar 345 L/detik. Evaluasi juga memperhatikan kualitas air baku dan air produksi. Kualitas air produksi yang diuji memenuhi PERMENKES 492/2010. Hasil evaluasi dijadikan acuan uprating atau peningkatan kapasitas produksi WTP 1 menjadi sama dengan kapasitas WTP 2 setelah evaluasi. Dari evaluasi dan uprating kapasitas produksi IPA Cibinong meningkat dari semula 330 L/detik menjadi 690 L/detik. Jika dikaitkan hasil proyeksi jumlah penduduk dan kebutuhan air, kapasitas eksisting 330 L/detik dapat memenuhi kebutuhan air sampai tahun 2014. Sedangkan kapasitas hasil evaluasi dan uprating sebesar 690 L/detik mampu memenuhi kebutuhan air daerah layanan sampai tahun 2020.

The high rate of population growth Cibinong Subdistrict, Bogor Regency by 4,63% per years, needs to be balanced with the increased capacity of water supplier in order to meet the increasing demands of the public drinking water. Accordingly, this research aims to increase capacity Cibinong Water Treatment Plant (WTP Cibinong) through the evaluation and uprating. WTP Cibinong with 330 L/s capacity consist of WTP 1 capacity 100 L/s and WTP 2 capacity 230 L/s. Evaluation will be conducted for WTP 2 because it has the production capacity increasing. Evaluation start from intake, coagulation, flocculation, sedimentation, filtration, and reservoired units based on design criteria.
Evaluation result from WTP 2 has a maximum capacity of 345 L/s. The evaluation also concerned about the quality of 'raw water' and 'production water'. The quality of water production was conduct under the PERMENKES 492/2010. The result from evaluation used as reference for uprating or increasing WTP 1 production in order to equal with WTP 2. Evaluation and uprating will increase production capacity WTP Cibinong from 330 L/s to 690 L/s. Associated with population projection, the existing condition able to fulfill water demands until 2014, while the result of evaluation and uprating will be able to fulfill water demands until 2020.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S53314
UI - Skripsi Membership  Universitas Indonesia Library
cover
Okita Miraningrum Nur Atsari
"Berdasarkan Peraturan Pemerintah Nomor 16 Tahun 2005 limbah akhir dari proses pengolahan air wajib diolah sebelum dibuang IPA Legong di bawah PDAM Tirta Kahuripan selama ini langsung membuang lumpurnya ke badan air Sungai Ciliwung tanpa pengolahan apapun Dalam penelitian ini ada empat alternatif yang dibuat dan pemilihan berdasarkan pertimbangan kebutuhan lahan volume dry cake pengoperasian dan biaya Alternatif yang terpilih adalah alternatif 1 terdiri dari 1 bak ekualisasi 1 gravity thickening 1 sludge conditioning tank 1 belt filter press 1 bak penampung lumpur dan 1 bak supernatan dengan menerapkan resirkulasi air cucian filter dan supernatan menjadi air baku sehingga lumpur yang diolah hanya berasal dari unit sedimentasi Debit lumpur dari instalasi konvensional sebesar 382 87 m3 hari sedangkan debit lumpur dari instalasi heksakoloidal sebesar 191 43 m3 hari Perkiraan kebutuhan lahan yang diperlukan adalah sebesar 420 m2.

Based on Government Regulation Number 16 Year 2005 waste produced from water treatment process must be treated before discharging Legong Water Treatment Plant under PDAM Tirta Kahuripan discharge the sludge directly into stream water Ciliwung without any treatment In this research there are four alternatives sludge treatment made and the choosing done based on land area dry cake volume operational and maintenance and financial criteria The choosen alternative is first alternative consists of 1 equalization tank 1 gravity thickener 1 sludge conditioner tank 1 belt filter press 1 dry cake tank and 1 supernatant tank by applying filter backwash waste recycle into raw water so the sludge that flows into treatment unit only comes from sedimentation unit Sludge generation from conventional installation is 382 87 m3 day and from hexacoloidal installation is 191 43 m3 day Land area needed for sludge treatment approximately is 420 m2
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
S56883
UI - Skripsi Membership  Universitas Indonesia Library
cover
R.M. Sandyanto Adityosulindro
"Air merupakan salah satu kebutuhan utama dalam menunjang kehidupan manusia. Kebutuhan terhadap air minum terus meningkat sejalan dengan meningkatnya jumlah penduduk dan aktifitasnya. Seiring dengan meningkatnya jumlah penduduk di Kota Depok secara umum dan di wilayah pelayanan Cabang I PDAM Tirta Kahuripan khususnya, maka kebutuhan akan air minum juga akan terus meningkat. Untuk memenuhi kebutuhan tersebut diperlukan evaluasi dan optimalisasi kinerja dari instalasi pengolahan air (IPA) Citayam yang mensuplai kebutuhan air minum wilayah pelayanan Cabang I, Kota Depok. Kinerja IPA dapat diketahui melalui evaluasi dengan meninjau kuantitas kebutuhan air, kapasitas pengolahan IPA dan kualitas air baku serta air produksi yang dihasilkan IPA Citayam. Selain itu tentunya dengan mempertimbangkan ketersediaan air baku. Dari hasil evaluasi dapat dilakukan optimalisasi kinerja IPA untuk meningkatkan efektifitas pengolahan dan mengetahui kapasitas optimal yang dapat diolah oleh instalasi. Evaluasi dan optimalisasi dilakukan pada instalasi yang ada di IPA Citayam yaitu Instalasi Kedasih dan Degremont. Metode penelitian yang akan dilakukan adalah observasi lapangan secara langsung di IPA Citayam. Berdasarkan proyeksi kebutuhan air diperkirakan kapasitas desain IPA akan terpakai seluruhnya pada tahun 2013.
Dari hasil evaluasi, diketahui bahwa efektifitas pengolahan instalasi sekitar 40% dan diperlukan perbaikan teknis pada unit intake, koagulasi, flokulasi, filtrasi dan desinfeksi. Untuk kinerja yang lebih optimal diperlukan perbaikan teknis pada beberapa unit pengolahan dan penambahan PAC dan/atau karbon aktif untuk mengantisipasi peningkatan kadar organik di air baku.
Dari hasil optimalisasi kapasitas desain pengolahan (kapasitas produksi), instalasi Kedasih dapat ditingkatkan kapasitasnya sebesar 30% dari 100 lt/dt menjadi 130 lt/dt. Sedangkan instalasi Degremont diperkirakan dapat ditingkatkan sebesar 50% dari 10 lt/dt-paket menjadi 15 lt/dt-paket (60 lt/dt menjadi 90 lt/dt). Maka total peningkatan kapasitas IPA Citayam adalah 37,5% dari 160 lt/dt menjadi 220 lt/dt, sehingga masih dapat memenuhi kebutuhan air sampai tahun 2015.

Water is one of the major needs in human life. Demand of drinking water is rising in line with increasing of population and activities. Along with the increasing number of residents in Depok City in general and in the service of Branch I PDAM Tirta Kahuripan particularly, the need for drinking water will also continue to increase. To meet these needs, evaluation and optimization of the performance of Citayam water treatment plant (WTP) which is supply a drinking water in Branch I service areas, Kota Depok is needed. WTP performance can be known through the evaluation by reviewing the quantity of water required, WTP capacity, and also the raw water quality and water production of WTP Citayam. Other than that, it is also important to consider the availability of raw water.
From the evaluation results, optimizing the performance can be done to improve the effectiveness of the WTP process and find out the optimum capacity that can be processed by the installation. Evaluation and optimization is performed on both existing installations in the WTP Citayam, which is Kedasih and Degremont Installation. The evaluation and optimization method is done by field observation directly on WTP Citayam. Based on the projections of water demand, it is estimated tha WTP design capacity will be used up entirely in 2013. From the results of the evaluation, the effectiveness of processing installations is around 40% and they need some technical improvements in the intake unit, coagulation, flocculation, filtration and disinfection unit.
For a more optimal performance, it needs technical improvements on several processing units and the addition of PAC and / or activated carbon to anticipate an increase in organic content in raw water. From the results of the optimization of the processing capacity (production capacity), Kedasih installation capacity can be increased by 30% from 100 L/s to 130 L/s. While the Degremont installation can be upgraded up to 50% from 10 L/s-package to 15 L/s-package (60 L/sec to 90 L/s). So the total capacity increase of WTP Citayam is 37.5% from 160 L/s to 220 L/s, so it is still able to meet the water needs until 2015."
Depok: Fakultas Teknik Universitas Indonesia, 2010
S50639
UI - Skripsi Open  Universitas Indonesia Library
cover
Khoirul Abidin
"Laju pertumbuhan yang tinggi di Kecamatan Teluk Jambe Timur sebesar 5,43 % perlu diikuti dengan peningkatan kualitas dan kuantitas layanan air minum untuk memenuhi tingginya kebutuhan air minum masyarakat. Instalasi Pengolahan Air Minum (IPAM) Karawang Kabupaten Karawang berencana untuk melakukan peningkatan kapasitas eksisting dengan evaluasi dan optimalisasi. Kapasitas eksisting dari IPAM Karawang adalah 320 L/detik yang berasal dari WTP 1 100 L/detik dan WTP 2 220 L/detik. Langkah yang dilakukan untuk evaluasi adalah evaluasi kualitas air baku dan air produksi, proyeksi jumlah penduduk dan kebutuhan air, serta evaluasi WTP 2. Tingginya parameter fisika dan kimia pada air baku dapat diturunkan dengan unit yang ada di IPAM Karawang sehingga kualitas air produksi sudah sesuai dengan PERMENKES 492/2010. Evaluasi dilakukan untuk WTP 2 karena memiliki potensi peningkatan kapasitas produksi.
Evaluasi dilakukan pada unit tandon prasedimentasi, intake, WTP 2 (flokulasi, sedimentasi, dan filtrasi), dan reservoir berdasarkan kriteria desain. Hasil evaluasi menghasilkan kapasitas maksimum WTP 2 sebesar 340 L/detik. Dari evaluasi dan optimalisasi kapasitas produksi IPAM Karawang meningkat dari semula 320 L/detik menjadi 440 L/detik. Jika dikaitkan dengan proyeksi jumlah penduduk dan kebutuhan air, kapasitas eksisting 320 L/detik dapat memenuhi kebutuhan air sampai tahun 2013. Sedangkan kapasitas hasil evaluasi dan optimalisasi 440 L/detik mampu memenuhi kebutuhan air daerah layanan sampai tahun 2015.

The population rate of Teluk Jambe Timur district is 5,43 %. It needs the increase of the quality and quantity of public water treatment to fulfill the society’s need of potable water. Water treatment plant (WTP) Karawang plans to do improvement to the existing capacity by evaluating and optimizing. The existing planed are evaluating the raw water quality and the effluent, projection of chemical parameters of raw water can be reduced using the existing WTP Karawang units as PERMENKES 492/2010. This final project is to evaluate the WTP 2 because it is potentially able to increase the production capacity.
Evaluation is done to pre sedimentation, intake, WTP 2 (flocculation, sedimentation, and filtration), and reservoir based on the design criteria. Base on the evaluation result, the capacity of WTP 2 can be increase to be 340 L/s in maximum. Based on the evaluation and production capacity optimalization of WTP Karawang increase from 320 L/s to 440 L/s. Related with population projection and the need of water, the existing capacity 320 L/s can fulfill the need of water until 2013. Meanwhile, the capacity based on evaluation and optimizing 440 L/s can fulfill the need of water until 2015.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
S53556
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sarah Irhamillah
"Limbah residu lumpur dari pengolahan air wajib untuk diolah sebelum dibuang ke badan air sesuai dengan Peraturan Pemerintah Nomor 16 Tahun 2005. IPA Cipaku yang merupakan salah satu insatalasi pengolahan
air bagi PDAM Tirta Pakuan Kota Bogor saat ini masih melakukan pembuangan lumpur sisa pengolahan pada badan air sungai Cisadane tanpa melalui pengolahan limbah apapun. Timbulan volume lumpur maksimum
sebesar 1471,49 m3/hari dan timbulan volume rata-rata sebesar 724,54 m3/hari. Timbulan massa lumpur maksimum sendiri adalah sebesar 1731,38 kg/hari dengan nilai rata-rata 1074,54 kg/hari. Pemilihan
pengolahan lumpur didasarkan pada karakteristik lumpur yang dihasilkan, luas lahan, dan timbulan dry cake dari dua alternatif desain. Dari hasil perhitungan dan pertimbangan didapatkan alternatif desain berupa 1 bak
penampung, 1 Chemical Conditioning Tank, 1 Recovery Basin, 1 Gravity Thickener, dan 1 Belt Filter Press. Luas lahan yang dibutuhkan sekitar 360m2.

Residual sludge waste from water treatment plant needs to be treated before being discharged into water bodies in accordance with Peraturan Pemerintah No. 16 Tahun 2005. IPA Cipaku as one of Water Treatment Plant under PDAM Tirta Pakuan Kota Bogor still disposes process residual sludge to river Cisadane water bodies without going through any waste processing. The maximum sludge generation volume is 1471,49 m3/day and the average generation volume is 724,54 m3/day. The maximum mass of sludge generation alone is 1731,38 kg/day with an average mass generation value of 1074,54 kg/day. The selection of sludge treatment is based on the characteristics of the sludge produced, the land area, and the dry cake generation of two alternative designs.
The calculations and considerations resulted an alternative design of a sludge treatment plant consisting of 1 holding tank , 1 Chemical Conditioning Tank, 1 Recovery Basin, 1 Gravity Thickener, and 1 Belt Filter Press. The land area required is approximately 360 m2."
Depok: Fakultas Teknik Universitas Indonesia, 2015
S60838
UI - Skripsi Membership  Universitas Indonesia Library
cover
Puji Fitria Utami
"Penelitian ini membahas mengenai penggunaan koagulan pendukung yang berasal dari pemulihan lumpur IPAM Legong. Pemulihan koagulan dilakukan dengan metode asidifikasi menggunakan asam sulfat hingga mencapai rentang pH 0,5 sampai 2,5. Efisiensi pemulihan aluminum dengan pH asidifikasi 0,5; 1,0; 1,5; 2,0; dan 2,5 berturut-turut adalah 46,7, 37, 28, 16, dan 12,7, sedangkan kinerja penurunan kekeruhan air baku oleh kelima koagulan berturut-turut adalah 92,36, 92,25, 92,20, 91,97, dan 91,82.
Hal ini menunjukkan bahwa koagulan hasil pemulihan lumpur IPAM dapat digunakan sebagai koagulan pendukung dalam proses koagulasi-flokulasi-sedimentasi di IPAM. pH 2,5 dipilih sebagai pH optimum untuk asidifikasi karena kebutuhan asam sulfat untuk asidifikasi paling rendah namun kinerja penurunan kekeruhannya mencapai 91,82. Koagulasi dengan campuran koagulan PAC murni 10 ppm dan koagulan pemulihan 30 ppm mampu menurunkan kekeruhan air baku sebesar 95,74. Penggunaan skenario kaogulasi tersebut mampu mengurangi 50 penggunaan PAC murni sehingga IPAM Legong dapat menghemat biaya sebesar 581,4 juta rupiah per tahun.

This study discusses the use of a support coagulant that is produced from water treatment plant WTP sludge recovery. Recovery of coagulant uses acidification method with sulphuric acid until sludge pH drops under 2,5. Variation of pH, that is used as independent variable, are 2.5, 2.0, 1.5, 1.0, and 0.5. Aluminum recovery percentage of those variation pH are 46,7, 37, 28, 16, and 12,7 respectively. Meanwhile the efficiency of turbidity removal are 92,36, 92,25, 92,20, 91,97, and 91,82 respectively.
This result shows that that the WTP sludge recovery coagulant can be used as a supporting coagulant in the coagulation flocculation sedimentation process in WTP. pH 2.5 is chosen as the optimum pH for acidification because the sulfuric acid requirement for acidification was lowest but its turbidity removal performance reached 91.82. Coagulation with a mixture of 10 ppm pure PAC and 30 ppm recovery coagulant can reduce 95,74 of raw water turbidity. The use of this scenario can reduce 50 of the use of pure PAC so that WTP can save costs of 581.4 million rupiah per year.
"
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Achmad Ilham Azhari
"Kebutuhan terhadap air minum terus meningkat sejalan dengan meningkatnya jumlah penduduk dan aktifitasnya. Seiring dengan meningkatnya jumlah penduduk di Kecamatan Benda, Kota Tangerang, kebutuhan akan air minum juga akan terus meningkat. Instalasi Pengolahan Air Benda dibangun tahun 2010 di kawasan Perumahan Duta Garden, Kota Tangerang. Namun, hingga saat ini belum pernah dilakukan evaluasi kinerja unit pengolahan dari IPA Benda. Kinerja instalasi pengolahan air diketahui melalui evaluasi dengan meninjau kualitas dan kuantitas air baku yang digunakan, kualitas air produksi yang dihasilkan, dan kapasitas pengolahan instalasi Benda. Dari hasil evaluasi dapat dilakukan optimalisasi kinerja instalasi untuk mengetahui efektifitas unit pengolahan dari instalasi.
Hasil analisis data kependudukan menunjukan laju pertumbuhan penduduk di Kecamatan Benda mengikuti pola pertumbuhan aritmatik dengan rata-rata pertambahan penduduk sebesar 2564 jiwa setiap tahunnya. Hasil perhitungan proyeksi kebutuhan air menunjukan bahwa terdapat kenaikan kapasitas kebutuhan air menjadi 100 L/detik hingga tahun 2018 dan 150 L/detik hingga tahun 2026. Hasil dari evaluasi instalasi eksisting dengan debit 50 L/detik adalah dapat mengolah air baku sehingga menghasilkan air produksi yang memenuhi standar kulitas air minum. Namun terdapat beberapa masalah pada beberapa unit pengolahan yang sebaiknya diperbaiki guna meningkatkan kinerja instalasi.

The need for drinking water continues to increase along with the increasing of population and its activities. As the increasing number of population in Kecamatan Benda, Kota Tangerang, the need for drinking water will also continue to increase. Benda Water Treatment Plant was built in 2010. Until now, there has been no evaluation of the performance of processing units from WTP Benda. The performance of the water treatment plant is known through evaluation by reviewing the quality and quantity of the raw water used, the quality of the produced water, and the processing capacity of the plant.
The analysis of population data indicate the rate of population growth in Kecamatan Benda follow the arithmetic growth pattern with average population increase of 2564 people each year. The result of water demand projection shows that there is an increase of water demand capacity to 100 L sec until 2018 and 150 L sec until 2026. The result of the existing installation evaluation with the discharge of 50 L sec is able to process raw water to produce production water that meet drinking water quality standard. However, there are some problems in several processing units that should be improved to enhance the performance of the installation.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S67785
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ghina Aldila Cahyani
"Mengacu pada Rencana Pembangunan Jangka Menengah Daerah (RPJMD) Kabupaten Tangerang yaitu meningkatkan cakupan pelayanan SPAM sebesar 65% pada tahun 2023, salah satu langkah mewujudkan rencana tersebut dengan meningkatkan kapasitas penyerapan IPAM Cikokol sebesar 300 l/s sehingga kapasitas debit IPAM Cikokol dari 1275 l/s menjadi 1575 l/s. Penelitian ditunjukan untuk mengevaluasi kinerja instalasi pengolahan dari segi kuantitas dan kualitas pada kapasitas debit eksisting sebesar 1275 l/s dan pada kapasitas debit setelah peningkatan debit sebesar 1575 l/s. Metode evaluasi yang dilakukan pada penelitian ini terdiri dari proyeksi kebutuhan air, analisis kualitas air baku dan produksi, dan evaluasi unit instalasi. Hasil evaluasi menunjukan bahwa terdapat beberapa kinerja unit instalasi yang belum memenuhi standar/kriteria desain yang ada diantaranya unit flokulasi, sedimentasi, dan filtrasi. Meski begitu dari segi kualitas air produksi, seluruh parameter air minum masih memenuhi peraturan baku mutu yang ada. Berdasarkan proyeksi kebutuhan air wilayah pelayanan IPAM Cikokol pada tahun 2030 dengan debit 1575 l/s hanya memenuhi 21% tingkat pelayanan dari 11 kecamatan yang dilayani oleh IPAM Cikokol.

Refer to the Tangerang Medium-term Development Plan (RPJMD) which is to increase the coverage of SPAM services by 65% in 2023, one of the program to realization those plan is to increase the capacity of Cikokol WTP in the amount of 300 l/s from 1275 l/s to 1575 l/s. This research is purposed to evaluate the performance of installation unit in terms of quantity and quality in the existing capacity of 1275 l/s and the increased capacity of 1575 l/s. Research methods include the water demand projections, analysis of raw and production water quality, and evaluation if installation units. From the evaluation result, known that there are installation units that not eligible with standard criteria including flocculation, sedimentation, and filtration units. Nevertheless the water production quality still comply the existing quality standards. Based on the water demand projection of WTP Cikokol service area with capacity 1575 l/s in 2030 only obtain 21% of the service levels in 11 districts served by WTP Cikokol."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>