Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 4870 dokumen yang sesuai dengan query
cover
Berlin: Ruby Press, 2010
624 REI
Buku Teks  Universitas Indonesia Library
cover
"ABSTRAK
Four large-scale reinforced concrete beams were constructed and tested to investigate the effectiveness of external poststrenghening with prestressed fiber reinforced polymer (FRP) sheets. "
Reston: American Society of Civil Engineers, 2018
693 JCC
Majalah, Jurnal, Buletin  Universitas Indonesia Library
cover
Civitello, Andrew M.
New York: McGraw-Hill, 2008
690 CIV c
Buku Teks  Universitas Indonesia Library
cover
Gerwick, Ben C
New York: CRC Pres, 2007
665.47 GER c
Buku Teks  Universitas Indonesia Library
cover
Tichelmann, Karsten
Switzerland: Birkhauser GmbH, 2008
R 721 TIC d
Buku Referensi  Universitas Indonesia Library
cover
Arditya Satriaputra
"Sejalan dengan laju pertumbuhan penduduk di Indonesia, terjadi peningkatan jumlah pembangunan proyek konstruksi untuk dapat memenuhi kebutuhan penduduk. Hal ini menghadirkan banyaknya masalah seperti biaya dan waktu berlebih, serta hasil limbah konstruksi yang banyak. Salah satu solusi yang ditawarkan untuk menghadapi masalah tersebut adalah dengan smart construction. Smart Construction merupakan proses dari sebuah proyek konstruksi yang memanfaatkan digitalisasi, jaringan, kecerdasan, dan perkembangan teknologi untuk pembangunan. Namun penerapan smart construction di Indonesia masih sedikit dan mengalami beberapa permasalahan. Oleh karena itu, penelitian ini ditujukan untuk mengidentifikasi faktor – faktor apa saja dan hubungan antar faktor yang dapat mempengaruhi penerapan smart construction di Indonesia. Metode yang digunakan dalam penelitian ini adalah validasi pakar, survei kuesioner, dan pengolahan data menggunakan Partial Least Square – Structural Equation Modelling (PLS-SEM). Hasil dari penelitian ini yaitu didapatkan enam variabel yang mempengaruhi penerapan smart construction di Indonesia yaitu kompatibilitas, aksesibilitas, kesiapan organisasi, pendanaan, ilmu pengetahuan, dan kondisi pasar. Variabel yang memiliki pengaruh dengan tingkat signifikansi yang tinggi pada penerapan smart construction di Indonesia berdasarkan nilai T-Statistics secara berurutan yaitu ilmu pengetahuan, kompatibilitas, kesiapan organisasi, dan pendanaan. Variabel faktor pengaruh mempengaruhi pandangan pelaku konstruksi terhadap manfaat penerapan smart construction di Indonesia.

In line with the rate of population growth in Indonesia, there has been an increase in the number of construction projects to meet the needs of the population. This presents many problems, such as excess cost and time, as well as the resulting large amount of construction waste. One of the solutions offered to deal with this problem is smart construction. Smart Construction is the process of a construction project that utilizes digitalization, networking, intelligence, and technological developments for development. However, the application of smart construction in Indonesia is still small and experiencing several problems. Therefore, this research is aimed at identifying factors and the relationship between factors that can influence the implementation of smart construction in Indonesia. The methods used in this research are expert validation, questionnaire surveys, and data processing using Partial Least squares structural equation modeling (PLS-SEM). The results of this study show that there are six variables that influence the implementation of smart construction in Indonesia: compatibility, accessibility, organizational readiness, funding, knowledge, and market conditions. Variables that have a high level of significance for the implementation of smart construction in Indonesia based on the T-Statistics values sequentially are knowledge, compatibility, organizational readiness, and funding. Influence factor variables affect the views of construction workers on the benefits of implementing smart construction in Indonesia.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hegar Adrian
"Seiring dengan pertumbuhan ekonomi Indonesia yang semakin meningkat sehingga banyak diselengarakan proyek konstruksi dengan skala besar, semakin besar suatu proyek maka akan semakin komplek pekerjaannya. Proyek konstruksi sangat erat dengan berbagai risiko perubahan yang memungkinan untuk terjadinya konflik. Untuk menghindari sengketa atas konflik yang terjadi karena adanya perubahan, sangat penting bagi kontraktor untuk mengajukan klaim dengan langkah-langkah yang ditentukan sesuai dengan kondisi kontrak. Proses improvisasi pelaksanaan klaim pada penelitian ini disini berupa pengembangan sistem administrasi dan dokumentasi klaim pada proyek konstruksi.
Metode yang digunakan pada penelitian ini berupa studi kasus penanganan klaim proyek konstruksi di PT X dengan menganalisa faktor-faktor dominan pada klaim proyek konstruksi yang didapatkan dari penelitian terdahulu serta jurnal-jurnal internasional. Faktor-faktor tersebut dianalisa lebih lanjut dengan metode Interpretive Structural Modeling (ISM) yang bertujuan untuk mendapatkan hubungan antara masing-masing faktor sehingga didapatkan suatu model proses setiap indikator klaim, hasil dari analisa ISM berupa diagram hubungan antara masing-masing variabel dari setiap indikator, antara lain: identifikasi klaim, perencanaan klaim, penyajian klaim, administrasi klaim dan dokumentasi klaim, yang dikembangkan menjadi Standar Operasional Prosedur (SOP) Klaim di PT X yang berguna untuk membantu kontraktor/penyedia jasa dalam pengajuan klaim, agar klaim yang mereka ajukan bisa diterima oleh pengguna jasa/owner.

Along with Indonesia's economic growth increased in line which held by largescale construction projects , the bigger of scale of the project will increase the complexity of work, with the result of project construction loaded with a variety of risk changes that allow for conflict, to avoid disputes over the conflict because the change, it is important for contractors to make a claim under the measures determined in accordance with the conditions of the contract. The improvement claims process in this research is the development of administrative systems and documentations claim in construction project.
The method used is a case study of handling claims on construction projects at PT X by analyze domain factors claim on construction project which got from previous research and international journals. The factors will be analyzed using Interpretive Structural Modeling (ISM) method to obtain the relationship between these factors, so the result is a proces model every claim indicator the results of the analysis ISM in the form of a flowchart between each of the variables of each indicator, among others: identification of claims, claims planning, presentation of claims, claims administration and claims documentation, developed into Standard Operating Procedure (SOP) Claims in PT X that help contractors in claims submission,in other their claim can be accepted by owner.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48908
UI - Tesis Membership  Universitas Indonesia Library
cover
Satya Nugraha
"Ketatnya persaingan di bidang konstruksi pada proyek infrastruktur di Indonesia memberikan tantangan pada perusahaan jasa konstruksi, khususnya pada industri infrastruktur Pembangkit Listrik. Untuk meningkatkan daya saing perusahaan jasa konstruksi diperlukan jaminan kepuasan pelanggan yang harus diciptakan, antara lain: produk yang dihasilkan harus sesuai dengan persyaratan, pekerjaan yang dilakukan selesai tepat waktu, biaya yang dikeluarkan relatif murah dan jaminan terhadap K3LH dapat terealisasi. Dalam menciptakan kepuasan pelanggan diperlukan konsep Budaya Mutu yang harus diterapkan. Dengan menggunakan metode Deming Cycle dalam membangun budaya mutu diharapkan perusahaan jasa konstruksi pembangkit listrik dapat meningkatkan daya saing. Penelitian ini bertujuan untuk mengetahui pengaruh membangun budaya mutu pada perusahaan jasa konstruksi pembangkit listrik, Data didapat melalui analisa arsip, wawancara dan survey kuisioner. Pengolahan data menyimpulkan aktivitas yang diperlukan dalam membangun budaya mutu pada fungsi-fungsi organisasi yang berbasis risiko di perusahaan jasa konstruksi pembangkit listrik sebagai cara untuk meningkatkan daya saing. Hasil penelitian ini adalah konsep membangun budaya mutu berbasis PDCA pada Sistem Manajemen Mutu di perusahaan pembangkit listrik.

The tight competition in the construction sector in Indonesia's infrastructure projects presents a challenge to construction service companies, especially in the power plant infrastructure industry. To improve the competitiveness of construction service companies, customer satisfaction guarantees must be created, as follows: 1) Products must be in accordance with the requirements, the project done is completed on time, the costs incurred are relatively cheap and collateral for Health, Safety and Environment (HSE) should be realized. In creating customer satisfaction, the concept of Quality Culture needs to be applied. By using the Deming Cycle method in building a quality culture, it is expected that power plant construction service companies can increase competitiveness. This study aims to determine the effect of developing a quality culture on power plant construction service companies, data obtained through archival analysis, interviews and questionnaire surveys. Data processing concludes the activities needed on developing a quality culture for risk-based organizational functions in power plant construction service companies as a way to increase competitiveness. The results of this study are the concept of building a PDCA-based quality culture in the Quality Management System in a power plant construction services company."
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53360
UI - Tesis Membership  Universitas Indonesia Library
cover
Rossy Armyn Machfudiyanto
"Industri Konstruksi memiliki kontribusi besar dalam perekonomian. Permasalahan yang sering terjadi bahwa industri konstruksi memiliki catatan kecelakaan yang buruk dibandingkan industri yang lain. Penelitian ini bertujuan melakukan improvement kebijakan dan kelembagaan untuk meningkatkan tingkat kematangan dan kinerja keselamatan pada Industri Konstruksi di Indonesia.
Metode Penelitian menggunakan data primer dan sekunder dari hasil literatur yang divalidasi pakar serta melakukan survei kuesioner responden yang dianalisa menggunakan Metode SEM-PLS.
Hasil Penelitian menjelaskan bahwa kebijakan keselamatan, pembiayaan, reward dan punishment merupakan faktor yang dominan yang diintegrasi dengan lembaga yang terlibat dalam K3 untuk memperbaiki budaya keselamatan ditinjau dari elemen tingkat kematangan dalam meningkatkan kinerja keselamatan dan kinerja proyek konstruksi di Indonesia.

The Construction Industry has a huge contribution in the economy. The frequent problem is that the construction industry has a poor record of accidents compared to other industries. This study aims at improving the policies and institutions to improve the level of maturity, safety performance and project performance in the Construction Industry in Indonesia.
Methods The study used primary and secondary data from the literature that validated the expert and conducted a questionnaire survey of respondents who analyzed using the SEM-PLS Method.
The results of the study explain that the safety, financing, reward and punishment policies are the dominant factors that are integrated with the institutions involved in OSH to improve safety culture in terms of the elements of maturity level in improving the safety performance and performance of construction projects in Indonesia.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
D2644
UI - Disertasi Membership  Universitas Indonesia Library
cover
Alifia Ariyanti
"Pandemi Covid-19 berdampak besar terhadap kinerja perekonomian sektor konstruksi. Selama pemberhentian sementara, banyak pekerjaan konstruksi yang ditunda maupun diberhentikan sehingga mengakibatkan perusahaan konstruksi di berbagai negara mengalami kerugian materiil dan kendala terkait tenaga kerja padahal industri konstruksi memainkan peran penting dalam pemberdayaan ekonomi dan menciptakan peluang kerja bagi miliaran pekerja. Walaupun telah dirancang dan diimplementasikannya berbagai kebijakan untuk mengurangi dampak Covid-19 pada sektor konstruksi, pelaksanannya perlu diawasi dan dievaluasi untuk mengetahui keefektifannya.
Penelitian ini bertujuan untuk menghasilkan strategi peningkatan penerapan kebijakan pemerintah di masa Covid-19 yang diharapkan dapat meningkatkan kinerja perusahaan konstruksi. Metode yang digunakan adalah wawancara terhadap pakar dan survei terhadap 36 responden. Dengan penyusunan strategi menggunakan metode benchmarking kebijakan negara Malaysia dan Singapura di sektor konstruksi.
Hasil dari penelitian ini adalah didapatkan 4 variabel dengan 21 indikator dari penerapan kebijakan pemerintah pada sektor konstruksi selama masa pandemi Covid-19 yang berpengaruh terhadap kinerja perusahaan konstruksi, yaitu (1) struktur birokrasi; (2) sumber daya; (3) disposisi; (4) komunikasi. Nilai penerapan kebijakan pada kontraktor BUMN berskala besar yang ditinjau per indikator memiliki nilai bervariasi antara 68,89% (penerapan kebijakan cukup sesuai dengan indikator) sampai dengan 87,78% (penerapan kebijakan sangat sesuai dengan indikator).
Terdapat 5 strategi utama yang perlu dilakukan untuk meningkatkan kinerja perusahaan konstruksi pada masa pandemi Covid-19, yaitu (1) Menambahkan kebijakan terkait pengelolaan penambahan biaya akibat kebijakan pembatasan pergerakan; (2) Menerapkan insentif positif bagi perusahaan yang memiliki track record baik atas kepatuhannya berupa pendanaan bersama pengadaan fasilitas atau upah pengawas kepatuhan (3) Tidak memberlakukan perubahan nama kebijakan melainkan kebijakan dibuat per level serta menyampaikan dari awal batasan kegiatan; (4) Memberikan perpanjangan waktu secara universal akibat penundaan akibat kebijakan pembatasan pergerakan; (5) Menegakkan pemberian insentif negatif bagi perusahaan konstruksi yang melanggar kebijakan Covid-19.
Kemudian, strategi tambahan untuk agar terus terjadinya peningkatan kinerja perusahaan konstruksi meliputi: (1) SOP dibuat secara langkah per langkah yang detail dan sistematis ; (2) Terdapat standardisasi pelatihan kepada pengawas kebijakan Covid-19; (3) Setiap kebijakan tersedua di semua media; (4) Diadakannya sosialisasi yang membahas skema bantuan untuk perusahaan konstruksi beserta kebijakan yang berlaku selama masa pandemi Covid-19.

The Covid-19 pandemic has caused a major impact on the economic performance of various sectors, one of which is the construction sector. During temporary closure, many construction works were either temporarily suspended or terminated which results to financial losses and labor-related constraints in construction companies in various countries despite construction industry plays an important role in economic empowerment and creates job opportunities for billions of workers. Although various policies have been designed and implemented to reduce the impact of Covid-19 on the construction sector, their implementation needs to be monitored and evaluated to determine the effectiveness.
This study aims to produce a strategy to increase the implementation of government policies during the Covid-19 period which is expected to improve the performance of construction companies. The method used in this research is interviews with experts and a survey of 36 respondents. By formulating the strategy using the benchmarking method of Malaysia and Singapore policy in the construction sector.
The results of this study were obtained 4 variables with 21 indicators from the implementation of government policies in the construction sector during the Covid-19 pandemic that affected the performance of construction companies, namely (1) bureaucratic structure; (2) resources; (3) disposition; (4) communication. The score of policy implementation on large-scale SOE contractors that are reviewed per indicator varies between 68.89%  to 87.78%.
5 main strategies need to be carried out to improve the performance of construction companies during the Covid-19 pandemic, namely (1) Adding policies related to the management of additional costs due to movement restriction policies; (2) Implementing positive incentives for companies that have a good track record of compliance with policies in the form of joint funding for the procurement of Covid-19 facilities or wages for policy compliance supervisor; (3) Does not apply a change in the name of the policy, but the policy is made per level and conveys from the beginning the limits of activities that are allowed or not; (4) Provide universal extension of time due to delays caused by movement restriction policies; (5) Enforce the provision of negative incentives for construction companies that violate Covid-19 policies.
Then, additional strategies to continuously improve the performance of construction companies include: (1) SOPs are made step by step in detail and systematically; (2) There is a standardization of training for Covid-19 policy supervisors; (3) Each policy is available in all media; (4) Conducting socialization discussing aid schemes for construction companies and policies.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>