Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 108082 dokumen yang sesuai dengan query
cover
Agastya Searianda
"Fasilitas anjungan lepas pantai yang terletak di Lapangan Alpha merupakan fasilitas yang memiliki risiko tinggi, dan hal tersebut membutuhkan analisis risiko lebih lanjut untuk memastikan pengoperasiannya aman bagi manusia dan lingkungan di sekitarnya. Analisis risiko kuantitatif sulit dipahami oleh beberapa pihak, oleh karena itu perlu dikembangkan dengan pendekatan semi kualitatif dengan metode Risk Based Inspection (RBI). Penelitian ini ingin mendapatkan nilai risiko yang dievaluasi dalam bentuk matriks risiko dengan bantuan perangkat lunak Crystal Ball. Hasil dari penelitian ini adalah nilai risiko fasilitas anjungan lepas pantai yang berada pada tingkat yang dapat diterima.

Offshore platform facility located in the Field Alpha is a facility that has a high risk, and it requires further risk analysis to ensure the operation is safe for humans and the environment around it. Quantitative risk analysis is difficult to understand by some parties, and therefore need to be developed with a semi qualitative approach with Risk Based Inspection (RBI) methods. This study wanted to get the value of the risks evaluated in the risk matrix form with the help of Crystal Ball software. The results of this study is the risk of offshore platform facilities which are at an acceptable level."
Depok: Fakultas Teknik Universitas Indonesia, 2012
S42562
UI - Skripsi Open  Universitas Indonesia Library
cover
Kendy Pontoan
"

ABSTRAK

Nama : Kendy Pontoan
Program Studi : Magister Keselamatan & Kesehatan Kerja
Judul : Analisis Risiko Skenario Kecelakaan Major Pada Kejadian Tabrakan Helikopter Terhadap Anjungan Lepas Pantai PT. X Tahun 2018
Pembimbing : Dr. dr. Zulkifli Djunaidi, M.App.Sc
Instalasi anjungan lepas pantai adalah struktur atau bangunan yang dibangun di lingkungan lepas pantai untuk mendukung proses eksplorasi atau eksploitasi minyak dan gas. Dengan kerumitan fasilitas pemrosesan minyak dan gas dan fasilitas pendukung lainnya seperti crane, helikopter, switch gear, dll. sehingga melibatkan risiko kecelakaan major (major accident) dalam pengoperasian anjungan lepas pantai. Dampak kecelakaan akan mengakibatkan konsekuensi bencana, korban massal, masalah lingkungan, dan kelangsungan bisnis.
Penelitian ini dilakukan untuk menganalisis risiko bagi pekerja di anjungan lepas pantai dari skenario kecelakaan major yang terkait dengan operasi helikopter selama lepas landas dan mendarat di instalasi lepas pantai, dan menilai risiko terhadap serangkaian risiko perusahaan, serta mengidentifikasi pengurangan risiko dan tindakan yang mitigasi yang relevan.
Hasil dari penelitian ini dapat memberikan panduan untuk mendefinisikan peristiwa non-process major hazard, khususnya peristiwa kecelakaan helikopter dan menerapkan penilaian risiko yang tepat untuk meningkatkan prediksi risiko kecelakaan major dan pengurangan risiko. Hasil analisis untuk semua instalasi (Uniform platform dan FSO AA) menunjukkan bahwa risiko yang terkait dengan dampak helikopter yang terpapar kepada personel pada instalasi berada dalam tingkat kriteria yang dapat diterima.
Kata kunci: Risk Assessment, Offshore, Helicopter Crash, Non-Process Event, Major Accident


ABSTRACT

Name : Kendy Pontoan
Study Program : Magister of Safety and Occupational Health
Title : Risk Analysis of Major Accident Scenario Helicopter Crash on PT. X`s Offshore Platform Year 2018
Counsellor : Dr. dr. Zulkifli Djunaidi, M.App.Sc
Offshore installations are structures or buildings built at offshore environment to support the process of exploration or exploitation of oil and gas. With the complexity of oil and gas processing facilities and other supporting facilities such as cranes, helicopters, switch gears, etc. thus involving risk of major accidents in the operation of offshore platforms. Impact of major accident will lead to the consequences of catastrophic, mass casualty, environment issue, and business continuity.
This research was conducted to analyze the risks to workers on offshore platforms from major accident scenarios related to helicopter operations during take-off and landing in offshore installations, and assess risks to a series of company risks, and identify risk reduction, action measures and relevant mitigation.
The results of this research can provide guidance for defining major non-process hazard event particularly helicopter crash event and implement appropriate risk assessment to improve major accident risk prediction and risk reduction. The analysis results for all installations (Uniform platform and FSO AA) show that the risk associated with helicopter impact exposed to the personnel on the installation is within tolerable level of acceptable criteria.
Key words: Risk Assessment, Offshore, Helicopter Crash, Non-Process Event, Major Accident

"
2019
T52592
UI - Tesis Membership  Universitas Indonesia Library
cover
Patria Wiratama
"Selama masa operasional pada instalasi Onshore Receiving Facility ditemukan potensial hazard yang dapat mengakibatkan kegagalan pada peralatan utama penunjang operasional. Oleh karena itu perlu dilakukan analisis risiko dengan cara mengidentifikasi hazard, menentukan probabilitas kegagalan dan konsekuensi kegagalan serta melakukan perhitungan risiko sehingga profil risiko pada operasional instalasi ORF dapat diketahui beserta akibatnya terhadap keselamatan, lingkungan, asset, dan reputasi perusahaan. Dari hasil analisis risiko didapat nilai total forecast risiko pada instalasi Onshore Receiving Facility sebesar 3,86. Jika mengacu pada matriks risiko termasuk ke dalam low risk level yang menunjukkan bahwa profil risiko pada instalasi ORF dapat diterima dan instalasi dapat berfungsi dengan aman. Untuk analisis sensitivitas didapat faktor-faktor yang paling berkontribusi terhadap risiko kegagalan pada operasional ORF yaitu laju korosi (29,4%), pengaruh usia (18,4%), dan kelebihan tekanan (11,4%). Hal ini dapat membantu untuk menentukan rekomendasi yang tepat untuk diterapkan pada fasilitas sehingga risiko dapat dikendalikan.

During the operational period of the Onshore Receiving Facility installation, potential hazards were found which could result in failure of the main operational equipment. Therefore, it is necessary to carry out a risk analysis by identifying hazards, determining the probability of failure and the consequences of failure and performing risk calculations so that the risk profile of the ORF installation operation can be known and its consequences to safety, environment, assets, and company reputation. Based on the results of the risk analysis, the total risk forecast value for the Onshore Receiving Facility installation is 3.86. Refers to the risk matrix, it is included in the low risk level which indicates that the risk profile of the ORF installation is acceptable and the installation can function safely. For sensitivity analysis, the factors that most contribute to the risk in ORF operations are the corrosion rate (29.4%), equipment service life (18.4%), and excess pressure (11.4%). This result can be used as a reference to determine appropriate recommendations to be applied to the facility so that risks can be controlled. "
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Luki Cahyadi
"Tujuan penelitian ini dilakukan adalah untuk memberikan gambaran resiko individual pertahun untuk personel yang tinggal dan bekerja di WHP-X. Serta mengevaluasi kegiatan mitigasi / kontrol yang bertujuan untuk menurunkan resiko pada tingkat yang bisa diterima dengan melakukan analisa semi kuantitatif. Penelitian ini menggunakan pendekatan kuantitatis dan kualitatif."
Depok: Fakultas Teknik Universitas Indonesia, 2011
T30320
UI - Tesis Open  Universitas Indonesia Library
cover
Ajang Indra
"Perhitungan risiko pada fasilitas industri diperlukan untuk melihat nilai risiko yang dapat berdampak kepada aspek keselamatan pekerja, lingkungan, finansial, dan reputasi perusahaan. Perhitungan risiko pada fasilitas Normally Unmanned Installation (NUI) biasanya tidak mengakomodir keberadaan personil atau pekerja, sehingga nilai risiko tidak dapat diterapkan ketika ada rencana penempatan pekerja ke atas NUI. Penelitian ini ditujukan untuk mengetahui nilai risiko yang ada di NUI bersamaan dengan rencana penempatan personil keamanan. NUI yang dijadikan objek kajian adalah dua tipe platform dengan kondisi berbeda. Nilai risiko diperoleh dengan pendekatan metode Semi Quantitative Risk Analysis (SQRA) melalui penjabaran faktor-faktor risiko ke dalam kriteria likelihood dan consequence. Kriteria likelihood dan consequence dirangking dari nilai 1 sampai 5 sesuai dengan Matriks Risiko skala 5 x 5 yang digunakan. Hasil perhitungan risiko menunjukkan bahwa nilai risiko pada NUI berada pada level “low risk” dan acceptable.

Risk assessment on industrial facilities needed to see the risks that may impact on safety, environmental, financial, and corporate reputation. Risk assessment on Normally Unmanned Installation (NUI) facilities usually do not accommodate the existence of personnel or employees, so the risk value can not be applied when there is a plan to personnel deployment on NUI. This study aimed to determine the risk value inherent with security personnel deployment planning at NUI. The NUI that will be assessed are two type platforms with different conditions. Risk values obtained by semi quantitative risk analysis method through determination of likelihood and consequence criteria. Likelihood and consequence criteria values ranked from 1 to 5 according to scale of Risk Matrix 5 x 5 used. Risk assessment results show that NUIs risk level is at "low risk" and broadly acceptable."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S47202
UI - Skripsi Membership  Universitas Indonesia Library
cover
Gustiyanto
"Energi merupakan satu kebutuhan pokok buat manusia, salah satunya berasal dari gas bumi. Memang pada awalnya gas tidak dimanfaatkan sehingga gas yang merupakan produksi sampingan dari suatu sumur minyak bumi akan dibuang ke udara tanpa memberikan nilai ekonomi. Namun saat ini, gas bumi merupakan salah satu sumber energi yang dimanfaatkan dan memiliki nilai ekonomi yang bagus, tidak kalah dengan minyak bumi. Apalagi saat ini produksi dan ketersediaan minyak bumi semakin menipis seiring semakin banyaknya minyak bumi yang diambil untuk dijadikan sumber energi.Investasi buat pengembangan industri minyak dan gas bumi memerlukan modal atau kapital yang besar sehingga perlu adanya pertimbangan di awal sebelum diputuskan akan dikembangkan. Salah satunya adalah dengan melihat risiko yang ada sebelum pekerjaan pengembangan itu dilakukan. PT. XYZ yang berada di Provinsi Kalimantan Utara, yang merupakan salah satu perusahaan milik negara berencana untuk melakukan pembangunan fasilitas produksi gas bumi. Sebelum diputuskan, tentu akan mempertimbangkan segala potensi yang ada, salah satunya adalah potensi risiko yang ada sehingga akan menjadi dasar untuk menyiapkan tindakan mitigasi jika pembangunan ini tetap akan dilakukan.

Energy is a basic need for humans, one of which comes from natural gas. At first gas was not utilized so that gas which is a by-product of an oil well would be discharged into the air without providing economic value. But at this time, natural gas is one of the energy sources that is utilized and has good economic value, not inferior to petroleum. Moreover, currently, the production and availability of petroleum are dwindling as more and more petroleum is taken to be used as an energy source. Investments for the development of the oil and gas industry require large amounts of capital, so there is a need for initial consideration before it is decided to develop it. One way is to see the risks that exist before the development work is carried out. PT. XYZ, which is located in Province North Kalimantan, that plans to build a natural gas production facility. Before it is decided, of course, it will consider all the potential that exists, one of which is the potential risk that exists so that it will become the basis for preparing mitigation actions if this development continues."
Jakarta: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Mutiara Alam Addini
"Skripsi ini berisi tentang analisis risiko pada kegiatan Praktikum Kimia Analitik Kuantitatif di Laboratorium Kimia Metalurgi Tahun 2012. Tujuannya adalah untuk menilai tingkat risiko di laboratorium kimia. Metode identifikasi hazard menggunakan Task Risk Analysis, sedangkan untuk analisis risiko dilakukan dengan menggunakan metode analisis risiko semikuantitatif dengan kriteria penilaian risiko (consequence, likelihood, dan exposure).
Hasil analisis tingkat risiko yang didapatkan, yaitu risiko dengan tingkat risiko very high sebanyak 4 (4,5%), priority 1 sebanyak 6 (6,7%), substantial sebanyak 42 (47,2%), priority 3 sebanyak 25 (28,1%), dan acceptable sebanyak 12 (13,5%). Saran yang dapat diberikan yaitu diperlukannya manajemen keselamatan di laboratorium melalui program keselamatan laboratorium.
The focus on this study is risk analysis in Quantitative Analytical Chemistry at Department Metallurgical and Material Engineering Chemistry Laboratory of University of Indonesia in 2012. This aim to assess risk level at the laboratory activity. Hazard identification method using the Task Risk Analysis, while for risk analysis is undertaken by semi-quantitative method that uses risk assessment criteria (consequence, likelihood, exposure).
Level of risk analytical results is risk with very high level has 4 (4,5%), priority 1 level has 6 (6,7%), substantial level has 42 (47,2%), priority 3 level has 25 (28,1%), and acceptable level has 12 (13,5%). The recommendations are need a safety management at laboratory with create a laboratory safety program.
"
Depok: Universitas Indonesia, 2012
S-Pdf
UI - Skripsi Open  Universitas Indonesia Library
cover
Saptadiyah Dwi Anggorowati
"Penelitian ini menguji model penilaian risiko pemberian pembiayaan konsumer dengan menggunakan model Logistic Regression (LR) dan Radial Basis Function (RBF). Hasil penelitian menunjukkan RBF memiliki tingkat akurasi yang lebih tinggi untuk mengklasifikasikan aplikasi yang direkomendasikan sedangkan LR memiliki tingkat akurasi yang tinggi untuk mengklasifikasikan aplikasi yang tidak direkomendasikan. RBF memiliki Tipe II error yang lebih besar dibandingkan LR. Tipe II error merupakan kesalahan pengklasifikasian aplikasi yang bersifat bad menjadi good sehingga memberikan dampak risiko pembiayaan dan cost yang tinggi.

This study examined the risk assessment model using Logistic Regression (LR) and Radial Basis Function (RBF). The results showed RBF has a higher degree of accuracy for classifying accepted loan applications whereas LR has a high degree of accuracy for classifying rejected loan applications. RBF has a Type II error is greater than LR. Type II error is missclassification applications that are bad to good so that they impact of risk financing and cost high."
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2016
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Watanabe, Dina
"ABSTRACT
Data Badan Pusat Statistik (2012) menunjukkan bahwa Indonesia mengalami peningkatan jumlah kendaraan bermotor, pada tahun 2010 berjumlah 76.907.127 menjadi sejumlah 94.373.324 di tahun 2012. Hal tersebut memberikan dampak buruk bagi kesehatan, salah satunya kematian akibat kanker paru-paru. IARC mengakui pencemaran udara dari sumber lalu lintas dan industry penyebab utama kanker paru-paru. Salah satu polutan yang terdapat dalam asap buangan kendaraan bermotor adalah benzo(a)pyrene. IARC mengklasifikasikan benzo(a)pyrene ke dalam golongan 1 yang artinya agent yang bersifat karsinogenik pada manusia.
Penelitian ini bertujuan untuk mengetahui asupan benzo(a)pyrene, risiko efek karsinogenik dan manajemen risiko melalui pola aktivitas dan karakteristik antropometri. Disain penelitian yang digunakan adalah Analisis Risiko Kesehatan Lingkungan dengan metode Sampling Incidental. Pengumpulan data dilakukan dengan cara pengukuran benzo(a)pyrene di 5 titik, serta wawancara dengan kuesioner untuk mengetahui karakteristik dan pola aktivitas.
Hasil analisis menunjukkan bahwa pada kelompok pembanding akan ada 36 kasus kanker dari 100 orang populasi, sedangkan pada kelompok sopir akan ada 7 kasus kanker dari 100 populasi dan pada seluruh kelompok akan ada 22 kasus kanker dari 100 populasi. Konsentrasi benzo(a)pyrene pada udara ambien sebesar 126,031 mg/m3, dan konsentrasi pada pembanding (indoor) 630,583 mg/m3. Manajemen risiko bagi seluruh kelompok adalah konsentrasi benzo(a)pyrene aman sebesar 1,75 mg/m3dengan waktu 4 menit dalam 2 hari selama setengah bulan. Pada kelompok sopir, konsentrasi aman sebesar 1,98 mg/m3dengan waktu 12 menit dalam 5 hari selama 2 bulan. Pada kelompok pembanding konsentrasi aman sebesar 1,46 mg/m3dengan waktu 2 menit dalam sehari selama 11 hari.

ABSTRACT
Central Bureau of Statistics (2012) showed that Indonesia increased experienced number of motor vehicles, in 2010 totaled 76.907.127 be a number 94.373.324 in 2012. This provides a negative effect on health, one of them is lung cancer. IARC recognizes the source of air pollution from traffic and industry, the main cause of lung cancer. One of the pollutants contained in the exhaust fumes of motor vehicles is benzo (a) pyrene. IARC classified benzo (a) pyrene in Group 1, which means that the agent is carcinogenic to humans.
This study aims to determine the intake of benzo (a) pyrene, carcinogenic risk and risk management through activity patterns and anthropometric characteristics. The design of the study is Environmental Health Risk Analysis with incidental sampling method. The data collection was done by the measurement of benzo (a) pyrene in 5 points, as well as interviews with a questionnaire to determine the characteristics and activity patterns.
The analysis showed that in the comparison group there were 36 cases of cancer will be from a population of 100 people, while in the group there will be 7 driver of cancer cases and 100 population, in all groups there will be 22 cases of cancer of the 100 population. The concentration of benzo (a) pyrene in ambient air of 126,031 mg/m3, and concentrations in comparison (indoor) 630,583 mg/m3. Risk management for the entire group is the safe concentration of benzo (a) pyrene was 1,75 mg/m3 with 4 minutes in 2 days for half a month. In the group of drivers, safe concentration of 1,98 mg/m3 with a time of 12 minutes within 5 days for 2 months. In the comparison group safely at 1,46 mg/m3 concentration with time of 2 minutes a day for 11 days."
2014
S55593
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rehulina Br Karo Sekali
"Penelitian ini bertujuan untuk mengevaluasi implementasi budaya risiko perusahaan yang telah diterapkan oleh perusahaan dengan menilai dari perspektif individu dan perspektif organisasi. Pengumpulan data dilakukan dengan metode survei dan wawancara. Survei didistribusikan ke seluruh staf hingga tingkat manajemen menengah untuk memperoleh perspektif individu dan wawancara dilakukan kepada manajemen tingkat atas untuk mencari perspektif organisasi. Kerangka kerja Budaya Risiko IRM digunakan sebagai acuan untuk mengevaluasi bagaimana budaya risiko yang telah berjalan di dalam organisasi. Penelitian menemukan bahwa tipe karyawan perusahaan memiliki cenderung memiliki perspektif risiko jenis deliberate and composed, yang artinya memiliki toleransi risiko sedang hingga tinggi. Berdasarkan pengambilan keputusan etis, seluruh kelompok cenderung mengambil keputusan berdasarkan etika hati nurani yang mengutamakan empati, kepedulian, dan rasa hormat. Budaya organisasi yang ada di perusahaan berdasarkan apabila dilihat dari dimensi sosial dan solidaritas memiliki tingkat solidaritas dan sosial yang tinggi atau disebut dengan kategori komunal. Tipe organisasi komunal ditandai dengan distribusi risiko yang adil antar karyawan, kerja tim yang baik antar fungsi dan lokasi, serta hubungan yang erat antar individu. Evaluasi terhadap delapan aspek budaya risiko (IRM Aspect Model) dari perspektif sosial dan solidaritas, ditemukan bahwa terdapat empat aspek yang belum memenuhi kriteria IRM. Aspek-aspek tersebut adalah Risk Decision, Risk Resource, Responding To Bad News, dan Reward.

The aim of this research is to obtain on the company’s risk culture that has been implemented by the company by assessing their individual perspective and organizational perspective. Data were collected with method of survey and interview. The survey distributed to all staff at lower to middle management level of employee to seek individual perspective and the interview held to upper level of management to seek organization perspective. The IRM Risk Culture framework took place to evaluate how did the risk culture went within the organization. The research found out that employee’s type of the company has the types of risk perspective as deliberate and composed, which means it has a medium to high risk tolerance. Based on ethical decision-making, the entire group tends to make decisions based on conscience ethics that prioritize empathy, care, and respect. The existing organizational culture in the company based on the social and solidarity dimensions has a high level of solidarity and socialization or called as communal category. The Communal category is characterized by fair risk distribution among employees, good teamwork among functions and locations, and close relationships between individuals. The evaluation of the eight aspects of risk culture (IRM Aspect Model) from the social and solidarity perspective, there are four aspects that do not meet the expectations of the IRM. These aspects are Risk Decision, Risk Resource, Responding to Bad News, and Reward."
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>