cover
Indra Nur Yahya
"Dalam proyek pembangunan PLTU 10.000 MW, risiko atau ketidakpastian yangm muncul di dalam proyek tersebut terdapat pada setiap tahapan proses EPC mulai dari tahap engineering, procurement, construction sampai dengan tahapan testing/commissioning yang menimbulkan pengaruh signifikan dalam kinerja biaya. Setelah dilakukan kajian dan risiko didapatkan risiko dominan yaitu sering terjadinya re-design engineering, perubahan kondisi cuaca pada fase construction. Pada proses dummy didapatkan faktor dominan risiko kurang pengalaman Partner dalam menangani proyek sejenis dan kurangnya informasi tentang perusahaan vendor. Pemodelan risiko didapatkan mean pada skala interval -2,5% < sd < 0%, artinya kinerja biaya proyek pada kondisi kecenderungan rendah atau dengan realisasi RAP aktual melebihi RAP rencana.

In a 10,000 MW power plant construction projects, risks or uncertainties arise in the project are included on each stage of the EPC process starting from the engineering, procurement and construction up to the stage of testing / commissioning are also factors that influence the risk of project performance. After doing the study and of risk that influence the cost performance of the EPC contractor on the construction, the dominant risk are the frequent occurrence of re-engineering design phase and changes in weather conditions at the construction phase. The dummy process on statistical model also found the dominant risk in the factor of partner inexperience in handling similar projects and the lack of information about the company's vendors. From the obtained mean risk modeling scenarios on a scale interval -2.5% "
Depok: Universitas Indonesia, 2011
T29916
UI - Tesis Open  Universitas Indonesia Library
cover
Cynthia Roosaly Maryana
"Sebagai pemegang izin usaha penyediaan tenaga listrik, PT PLN (Persero) wajib menyediakan tenaga listrik yang memenuhi standar mutu dan keandalan yang berlaku serta memberikan pelayanan sebaik-baiknya kepada konsumen dan
masyarakat mendukung pertumbuhan ekonomi, mendorong investasi, dan pemerataan industri. Untuk itu, Pemerintah Indonesia memberi tugas kepada PT PLN (Persero) untuk menjalankan program pembangunan infrakstruktur dalam
pencapaian rasio elektrifikasi nasional dalam bentuk proyek percepatan infrastruktur kelistrikan 10.000 MW dan dilanjutkan dengan 35.000 MW atau Mega Proyek. Pada dasarnya, penelitian ini mengidentifikasi faktor-faktor keuangan yang relevan selama proyek percepatan infrastruktur untuk menilai tingkat Kesehatan perusahaan dalam meneruskan Mega Proyek yang termasuk dalam Rencana Usaha Penyediaan Tenaga Listrik yang diterbitkan oleh Kementerian Energi dan Sumber Daya Mineral. Menggunakan mixed-method, kinerja keuangan perusahaan dianalisis menggunakan indikator tingkat kesehatan Keputusan Menteri No.100 tahun 2002. Faktor yang dapat mempengaruhi tingkat kesehatan keuangan perusahaan antara lain pendapatan usaha, porsi utang, kenaikan aset dan pengelolaan biaya adalah penting sebagai dasar formulasi perencanaan keuangan melalui laporan keuangan proforma.

PT PLN (Persero), as the only state-owned enterprise that holds the electricity supply business license in Indonesia, is required to implement government programs in achieving the national electrification ratio in the form of electricity infrastructure acceleration project which consist of 10.000 MW and followed by 35.000 MW or known as Mega Project in encouraging economic growth, investment and industrial equity. In substance, this study identifies relevant financial factors during the infrastructure acceleration project period to measure the company’s financial health in continuing the mega project which is included in Electricity Supply Business Plan issued by
the Ministry of Energy and Mineral Resources. Using mixed-method, we analyze the company’s financial health based on financial aspect health indicators issued by the Ministry of State-Owned Enterprises. Factors like sales growth, debt ratio, fixed asset ratio and cost management are evidently crucial to formulate strategic planning through pro forma financial statements in this case study.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Donny Tanama
"Rekonstruksi tempat tinggal pasca bencana tsunami adalah prioritas utama dimana hal ini mengarah pada metode konstruksi dan desain tempat tinggal yang dapat cepat dilakukan dan metode prefab menjadi salah satu alternative. Namun dengan masih jarangnya penggunaan metode prefab pada konstruksi perumahan menjadikan studi risiko yang terdiri dari identifikasi risiko, analisa dan respon terhadap risiko dirasa cukup penting khususnya bagi PT. KJ guna meningkatkan kinerja proyeknya. Dalam penelitian ini digunakan analisa AHP dan analisa statisitik dengan menggunakan SPSS v16 dimana dihasilkan 4 risiko dominan yang berkorelasi dengan kinerja biaya proyek.

Housing reconstruction after the tsunami was the first priority that leads to effort of trying to find a fast construction method which prefab method is an alternative. The using of prefab method in housing construction is still rare which makes the study of risk related to it from identification, analysis and response is so important especially for PT. KJ in its effort to increase the performance of its project costs . In this research the writer used AHP and statistic analysis using SPSS v16 which in the process resulted in 4 dominant risk variables which are correlated to the project cost."
Jakarta: Fakultas Teknik Universitas Indonesia, 2008
T 25211
UI - Tesis Open  Universitas Indonesia Library
cover
Ibnu Hanan
"Secara umum kegiatan reklamasi dapat ditujukan untuk perluasan lahan dan atau untuk perbaikan kondisi lahan yang ada. Bagi suatu wilayah teritorial dengan tingkat kepadatan penduduk yang tinggi, reklamasi dapat digunakan untuk mengatasi kendala keterbatasan lahan. Reklamasi dapat juga dilakukan di kawasan berair dan lahan yang tidak berguna atau rusak seperti lahan bekas pertambangan, sehingga fungsi lahan tersebut dapat menjadi lebih baik dan lebih bermanfaat. Area reklamasi ini nantinya dapat dimanfaatkan menjadi lahan pemukiman yang baru, daerah perindustrian, kawasan niaga atau pusat bisnis, kawasan pertanian, kawasan konservasi dan objek wisata. Proyek reklamasi dengan skala yang cukup besar memiliki tingkat kompleksitas dan risiko yang tinggi. Adapun tujuan utama dari kajian ini adalah mengidentifikasi risiko-risiko dominan yang ada pada proyek reklamasi serta melakukan analisis dampak dan penyebabnya yang secara signifikan dapat mempengaruhi terhadap kualitas proyek dan kinerja waktu, kemudian hasilnya akan dievaluasi untuk menentukan tingkatan dan peringkat masing-masing risiko sehingga dapat ditentukan cara penanganan, tindakan dan rekomendasi terhadap risiko-risiko tersebut. Dengan melakukan manajemen risiko ini maka diharapkan proses pengadaan dan pelaksanaan proyek reklamasi dapat dilaksanakan dengan waktu yang efisien dan dengan kualitas pekerjaan yang baik.

In general, reclamation activities can be aimed at expanding land and or improving existing land conditions. For a territorial area with a high population density, reclamation can be used to overcome the constraints of limited land. Reclamation can also be done in watery areas and useless or damaged land such as ex-mining land, so that the function of the land can be better and more beneficial. The reclamation area can be utilized as a new residential area, industrial area, commercial area or business center, agricultural area, conservation area and tourist attraction. A large-scale reclamation project has a high level of complexity and risk. The main objective of this study is to identify the significant risks that contained in the reclamation project and to conduct an analysis of the impacts and causes that can significantly affect the quality of the project and time performance, then the results will be evaluated to determine the level and ranking of each risk so that it can be determined how to handle, act and manage these risks. By doing this risk management, it is expected that the procurement of reclamation projects can be carried out with more efficient time, and with good quality.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Simanjuntak, Junifer Saut Pangidoan
"Pertumbuhan konsumsi tenaga listrik di Indonesia mencapai 8,6 per tahun berimplikasi terhadap peningkatan produksi energi listrik. Pemerintah telah mengantisipasinya melalui Program Pembangunan 35.000 MW yang didominasi PLTU batubara yang dapat meningkatkan emisi Gas Rumah Kaca secara signifikan. Penelitian ini bertujuan untuk untuk menentukan jenis teknologi batubara bersih yang diimplementasikan dalam unit PLTU Program Pembangunan 35.000 MW. Metodologi yang digunakan dalam penelitian ini adalah pemodelan skenario penggunaan teknologi batubara bersih yang disesuaikan dengan kelas kapasitas PLTU dan penentuan skenario terbaik didasarkan potensi emisi GRK terendah di sektor pembangkitan tenaga listrik dan module cost balance tertinggi, melalui simulasi LEAP. Berdasarkan hasil simulasi, seluruh unit PLTU Program Pembangunan 35.000 MW di regional Jawa-Bali harus menggunakan teknologi ultra super-critical untuk kelas kapasitas diatas 1.000 MW, super-critical untuk kelas kapasitas diatas 500 MW dan PFBC untuk kelas kapasitas dibawah 500 MW. Pada regional Sumatera, teknologi yang digunakan adalah super-critical dan PFBC untuk masing-masing kelas kapasitas diatas 500 MW dan dibawah 500 MW. Pada regional Kalimantan dan Sulawesi, penggunaan teknologi PFBC merupakan skenario terbaik untuk kelas kapasitas dibawah 500 MW, sedangkan teknologi CFBC digunakan pada unit kelas kapasitas pembangkit yang sama di regional Nusa Tenggara Barat. Potensi penurunan emisi GRK sektor pembangkitan tenaga listrik akibat implementasi teknologi batubara bersih dalam seluruh unit PLTU Program Pembangunan 35.000 MW sampai dengan 2020 mencapai 41,91 juta ton CO2e yang melampaui target penurunan emisi nasional dalam Rencana Aksi Nasional Gas Rumah Kaca RAN-GRK dalam skema nasional atau berkontribusi 74,84 dalam skema unilateral. Pada 2025, penurunan emisi diperkirakan akan mencapai 57,87 juta ton CO2e atau berkontribusi 30,46 dari rencana target penurunan emisi nasional pasca 2020 dalam skema optimistik. Oleh karena itu, implementasi teknologi batubara bersih dalam unit PLTU batubara dapat direkomendasikan sebagai salah satu kegiatan utama penurunan emisi GRK sektor energi dalam draft kebijakan RAN-GRK pasca 2020 yang sedang disusun Pemerintah saat ini.

The growth of electricity consumption in Indonesia 8.6 per year has implications toward increasing of the electricity generation. The Government of Indonesia had anticipated through 35,000 MW Electricity Development Program predominantly coal fired power plants CFPP that increase Greenhouse Gas GHG emissions significantly. The study aims to determine the type of clean coal technology implemented in the CFPPs of 35,000 MW Electricity Development Program. The methodology on the study is modeling the scenario for the use of clean coal technology in the CFPPs in accordance to their capacity size, while the selection of best scenario based on the lowest GHG emission potential in power generation sector and the highest module cost balance by using LEAP. Based on the simulation results, all of them in Java Bali region should use ultra super critical for capacity size above 1,000 MW, super critical for above 500 MW and PFBC for below 500 MW. In the region of Sumatra, the technology should be used is super critical and PFBC for the capacity size above 500 MW and below 500 MW respectively. In the region of Kalimantan and Sulawesi, the use of PFBC is the best scenario for capacity size below 500 MW, while CFBC is used in the their same size located in the West Nusa Tenggara region. The potential for GHG emission reduction in the power generation sector due to the implementation of clean coal technology in the 2020 in all of them is expected to reach 41.91 million tonnes CO2e that exceed the national scheme emission reduction target in GHG National Action Plan RAN GRK or have contribution 74.84 in its unilateral scheme. By 2025, emissions reduction is expected to reach 57.87 million tonnes CO2e or have contribution 30.46 of post 2020 national emissions reduction target plan in the optimistic scheme. Therefore, the implementation of clean coal technology in the CFPPs is recommended as one of the main activities of GHG emission reduction in the energy sector of the post 2020 RAN GRK policy currently being drafted by the Government of Indonesia."
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48052
UI - Tesis Open  Universitas Indonesia Library
cover
David Kurniawan
"Investasi di bidang ketenagalistrikan adalah salah satu faktor yang sangat penting untuk menjamin tersedianya tenaga listrik dalam jumlah yang cukup yang dapat memenuhi permintaan pasokan. Dengan Kebijakan pemerintah dalam program percepatan pembangunan pembangkit listrik 10.000 MW yang tidak hanya bertujuan untuk mengatasi krisis listrik tetapi juga untuk mendorong perekonomian di Indonesia. Sumber daya primer yang melimpah di Indonesia khususnya batubara mencapai sebesar 104.9 milyar ton menjadi sumber energi utama penggerak pembangkit listrik 10.000 MW (PLTU) sehingga dapat menghasilkan energi yang dapat dijual sesuai dengan kapasitas masing-masing pembangkit.
Dengan menggunakan analisa model Inter Regional Input Output (IRIO) dapat diketahui hubungan antar sektor dan antar wilayah akibat adanya permintaan akhir sektor tertentu pada suatu wilayah sehingga dapat meningkatkan output dan pendapatan masyarakat. Dampak akibat pembangunan pembangkit listrik 10.000 MW terhadap perekonomian Indonesia dari kurun waktu 2011 sampai tahun 2014 dilihat dari peningkatan output berturut-turut sebesar 0,51%, 1,31%, 1,97% dan 2,34% dari output awal sebesar Rp. 5.081,29 triliun, sedangkan peningkatan pendapatan berturut-turut sebesar 0.42%, 0,99%, 1,45% dan 1,72% dari pendapatan awal sebesar Rp. 825,92 triliun. Sekaligus memiliki disparitas yang cenderung mengecil pada tahun 2014.

Investment in the electricity sector is on every important factor to ensure the availability of electricity in sufficient quantities to meet rising demand. With Government policy in the acceleration of 10,000 MW power project, which not only aims to overcome the power crisis but also to stimulate the economy in Indonesia. Primary resources are abundant in Indonesia, especially for coal reached 104.9 billion tons to the main energy source driving the 10,000 MW power plant (power plant) so as to generate energy that can be sold in accordance with the capacity of each plant.
By using the analysis model of the Inter Regional Input Output (IRIO) can be determined the relationship between sectors and between regions due to there cent demand for a particular sector in a region so as to increase output and incomes. Impacts due to construction of 10,000 MW power plant on the economy of Indonesia from the period 2011 to 2014, seen from the increased output respectively by 0.51%, 1.31%, 1.97% and 2.34% of initial output of Rp. 5081.29 billion, while revenue increased respectively by 0:42%, 0.99%, 1.45% and 1.72% of the initial income of Rp. 825.92 trillion. Well have a disparity that tends to shrink in 2014.
"
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012
T31827
UI - Tesis Open  Universitas Indonesia Library
cover
Budi Suanda
"PT. PP (Persero) banyak mengalami cost overrun karena masalah kontrak walaupun telah diterapkan Standard Prosedur Manajemen Risiko. Tujuan dari penelitian ini adalah untuk mendapatkan pengelolaan risiko kontrak. Metode penelitian yang digunakan adalah studi kasus dan pengumpulan data menggunakan metode survei. Data diolah dengan analisa Deskriptif, AHP, Korelasi dan Regresi.
Hasil penelitian menunjukkan terdapat 12 risiko kontrak yang menjadi prioritas, Pengguna Jasa yang memiliki risiko kontrak tertinggi adalah Swasta Developer, dan tindakan risiko yang selalu dilakukan yaitu identifikasi dan analisa risiko, risk contingency, kondisi penawaran, dan negosiasi kontrak ulang.

PT. PP (Persero) has underwent many cost overrun at its projects caused by contract risks even though Standart of Risk Management Procedure is already applied. The purpose of this research is to get management of contract risk. Method applied in this research is case study and collecting data by using survey method. Datas are processed by Analysis of Descriptive, AHP, Correlation and Regression.
As Results, there are 12 prioritized contract risks, service user with highest contract risk is Private Developer, and main risk responses are identification-risk analysis, risk contingency, condition of bid, and re-negotiation of contract."
Depok: Fakultas Teknik Universitas Indonesia, 2008
T25240
UI - Tesis Open  Universitas Indonesia Library
cover
Deddy Gusnadi
"Secara umum proyek konstruksi mempunyai kegiatan yang kompleks dan memiliki unsur ketidakpastian sehingga mengandung resiko. Tdak terkecuali juga dengan proyek jalan tol. Dimana resiko-resiko yang diterima proyek selama masa konstruksi berpotensi mempengaruhi kinerja proyek, termasuk kinerja biaya pelaksanaan proyek.
Untuk mengetahui resiko apa yang berpotensi memberikan pengaruh terhadap kinerja biaya pelaksanaan diperlukan manajemen resiko sebagai pendekatan untuk mengelola resiko. Identifikasi resiko selama masa pelaksanaan diperlukan untuk mengetahui resiko apa yang berpotensi mempengaruhi kinerja biaya pelaksanaan. Dengan demikian akan diperoleh tingkat prioritas masing-masing resiko, sehingga dapat dievaluasi dan diperoleh tindakan penanganan yang tepat (alokasi resiko).
Hasil penelitian menunjukkan bahwa tindakan penanganan yang dilakukan oleh pihak kontraktor terhadap resiko cenderung berbeda. Ini menunjukkan bahwa belum diterapkannya prosedur yang baku terhadap pengelolaan resiko. Untuk itu diharapkan kontraktor jalan tol untuk menerapkan prosedur pengelolaan resiko yang baku.

In general the project of construction have complex activity and have uncertainty element so that contain risk. Do not aside from also with project of turnpike. Where accepted risks the projects of during a period of construction have potency to influence performance of is project of, including performance is expense of execution of project.
To know risk what have potency to give influence to performance is expense of execution needed by risk management as approach to manage risk Identify risk during a period of execution needed to know risk what have potency to influence performance of is expense of execution. Thereby will be obtained by priority level of is each risk, so that can evaluate and obtained by handling action which is accept risk allocation.
Handling action conducted by contractor party to risk tend to differ. This indicates that not yet applied of standard procedure to management of risk. Is for that expected by turnpike contractor to apply procedure management of standard risk.
"
Depok: Fakultas Teknik Universitas Indonesia, 2004
T14787
UI - Tesis Membership  Universitas Indonesia Library
cover
Rulianti Darwanto
"ABSTRAK
Dalam mengoperasikan sebuah PLTU yang terdiri dari beberapa unit, selalu diinginkan optimasi biaya. Dengan mengolah data harian setiap unit, melalui cara regresi dapat diperoleh karakteristik input - output masing - masing unit. Karakteristik input - output tersebut digunakan dalam perhitungan optimasi pembagian beban diantara unit - unit, yang kemudian juga dapat dikembangkan untuk dipakai dalam pemilihan dan penjadwalan unit - unit yang akan dioperasikan, serta juga untuk pengendalian pembangkitan pada sistem yang mempunyai interkoneksi dengan sistem lain.
Dengan data harian unit - unit PLTU Muara Karang, aplikasi kajian ini memperlihatkan bahwa optimasi yang telah dilakukan secara sistem masih dapat ditingkatkan.
"
1995
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Riza Fandopa
"Pada pelaksanaan pekerjaan proyek-proyek jalan jenis perkerasan lentur yang dikerjakan oleh PT X menurut data yang ada sering terjadi rework. Kejadian rework merupakan cerminan dari buruknya kinerja mutu pelaksanaan pekerjaan proyek. Indikator suksesnya pelaksanaan suatu proyek salah satunya adalah kinerja mutu. Banyak faktor yang mempengaruhi kinerja mutu pelaksanaan proyek jalan jenis perkerasan lentur. Penelitian ini bertujuan untuk mengidentifikasi resiko, mengetahui dampak penyebab resiko tersebut, serta merespon peristiwa resiko pada pelaksanaan pekerjaan proyek jalan jenis perkerasan lentur PT X dalam rangka meningkatkan kinerja mutu proyek.

In the execution of flexible pavement road work projects undertaken by PT X according to existing data frequent incidence of rework. Incidence of rework is a reflection of the poor quality performance of project work execution. One of successful indicators of a project execution is the quality performance. Many factors affect the quality performance on the flexible pavement road project work execution.This study aims to identify risks, determine the impact of the cause of the risk, and respond to risk events on the PT X flexible pavement road project execution in order to improve the project quality performance."
Depok: Fakultas Teknik Universitas Indonesia, 2012
T30312
UI - Tesis Open  Universitas Indonesia Library