Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 108951 dokumen yang sesuai dengan query
cover
Edy Sofian
"Pada dasarnya unjuk kerja Generator Sinkron Magnet Permanen Fluks Aksial (GSMPFA) ditentukan oleh tegangan dan arus. Baik nilai maupun bentuk gelombang untuk tegangan dan arus tersebut ditentukan oleh konfigurasi desain geometris pada generator. Desain konstruksi rotor pada GSMPFA dapat dibedakan berdasarkan bentuk magnet permanennya.
Skripsi ini membandingkan pola perubahan tegangan keluaran empat jenis bentuk magnet permanen pada variasi kecepatan putaran dan lebar celah udara. Hasil simulasi dan analisis menunjukkan bahwa desain konstruksi rotor dengan bentuk trapezoidal memberikan nilai tegangan keluaran yang maksimum.

The performances of Axial Flux Permanen Magnet Synchronous Generator (AFPMSG) with Coreless Stator are basicly considered from the current and voltage. Either wave form or magbitude for that caurrent and voltage depend on geometric design configuration of generator. In AFPMSG with coreless stator, rotor construction design can be classified base on permanen magnet (PM) pole shapes.
This study presents the comparison of change in output voltage in four types of PM pole shapes in various rotating speed and air gap. The result shows that design construction of rotor with trapezoidal pole shape produce maximum output voltage.
"
Depok: Fakultas Teknik Universitas Indonesia, 2011
S375
UI - Skripsi Open  Universitas Indonesia Library
cover
Rahmat Ariwidayat
"Pengembangan pemanfaatan energi baru terbarukan dilakukan dalam rangka mengurangi penggunaan energi fosil yang keberadaannya semakin berkurang, harga yang semakin tinggi, dan siklus pemulihannya yang sangat lama. Penggunaan teknologi untuk mendukung pengembangan energi baru terbarukan salah satunya adalah mesin sinkron yang dapat digunakan untuk memanfaatkan energi angin dan air. Mesin sinkron yang banyak digunakan saat ini merupakan mesin fluks radial, namun terdapat titik jenuh dalam pengembangannya. Mesin fluks aksial atau juga disebut mesin tipe cakram, adalah alternatif untuk mesin fluks radial karena bentuknya yang kompak dan kepadatan daya yang tinggi. Mesin fluks aksial dapat dioperasikan sebagai pembangkit listrik skala kecil hingga menengah, disamping itu mesin ini cukup ideal untuk aplikasi dengan kecepatan rendah. Pada skripsi ini, dilakukan rancang bangun generator fluks aksial magnet permanen. Rancangan generator ini terdiri dari rotor ganda dengan dua belas magnet permanen, serta stator tunggal dengan sembilan kumparan. Bahan dasar yang digunakan untuk stator dan rotor adalah bahan Akrilik, sedangkan magnet permanen menggunakan jenis neodymium N52. Jumlah lilitan setiap kumparan yang terdapat pada stator adalah 260 lilitan. Generator fluks aksial magnet permanen dirancang untuk menghasilkan tegangan fasa ke netral sebesar 4,03 Volt pada kecepatan nominal 500 rpm. Berdasarkan hasil pengukuran didapatkan bahwa nilai tegangan fasa ke netral pada kecepatan putar 500 rpm untuk fasa R = 2,934 Volt, S = 2,97 Volt, T = 2,95 Volt.

The use of renewable energy overtook fossil fuels cause their decrease in existence, increase in price, and a very long recovery cycle. One of the technologies used to support renewable energy is a synchronous machine. This machine can be used to convert wind and water energy. The radial flux machine is the type of Synchronous machine widely used today, but there are some difficulties in improving their performance. Axial flux machine, also called disc-type machine, is an alternative to radial flux machine due to their compact shape and high power density. Axial flux machines can be operated as small to medium-scale power plants and are ideal for low-speed applications. This thesis focused on designing and building a permanent magnet axial flux generator. The generator design consists of a dual rotor with twelve permanent magnets and a single stator with nine coils. The primary material used for the stator and rotor is Acrylic, and neodymium N52 for a permanent magnet. The number of turns in each coil in the stator is 260 turns. The axial flux permanent magnet generator is designed to produce a line-to-neutral voltage of 4.03 Volts at a speed of 500 rpm. Based on the measurement results, the values of the line-to-neutral voltages at a speed of 500 rpm are R = 2.934 Volt, S = 2.97 Volt, T = 2.95 Volt."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ramadhan Jarekson
"ABSTRAK
Pada dasarnya, unjuk kerja generator sinkron magnet permanen ditentukan oleh
arus dan tegangan keluaran. Hasil keluaran tegangan dan arus ditentukan oleh
kesimetrisan dan konfigurasi desain geometris dari generator tersebut. Skripsi ini
membandingkan jarak antar magnet permanen pada rotor terhadap fluks magnet
yang dihasilkan. Fluks tersebut akan menentukan gelombang sinusoidal yang
terbentuk dan tegangan keluaran. Hasil dari simulasi dan analisa menunjukan
bahwa jarak antar magnet permanen tidak secara langsung mempengaruhi unjuk
kerja dari desain generator yang ditentukan.

ABSTRACT
Basically, performance of axial flux permanent magnet coreless type stator
synchronous generator determined by the current and voltage output. Voltage and
current output determined by symmetry and geometric design configuration of
this generator. This undergraduate thesis compares the distance between polar
magnetic permanent magnet on the rotor with magnetic flux generated. Flux will
determine the sinusoidal wave and output voltage. Result of simulation and
analysis indicate that the distance between polar magnetic permanent magnet does
not directly influence to the performance of given generator design."
Fakultas Teknik Universitas Indonesia, 2011
S1803
UI - Skripsi Open  Universitas Indonesia Library
cover
M. Arief Yuniardi
"Aplikasi generator fluks aksial terus mengalami kemajuan. Berbagai tipe di coba untuk meningkatkan efisiensi dan penggunaanya. Salah satunya adalah generator fluks aksial magnet permanen rotor cakram ganda tanpa inti stator.
Pada skripsi ini akan dibahas mengenai perbandingan fluks magnet antara rotor tipe UU dan rotor tipe US demikian pula tegangan keluaran yang dihasilkannya. Dikaji pula besar dan bentuk gelombang fluks dan tegangan yang dihasilkan generator tanpa merubah material dan massa dari generator.

The application Axial flux generator continues to progress. Various types to improve efficiency and usage are being experimented. One of it is the axial flux permanent magnet dual disc rotor without stator core generator.
Bachelor thesis the magnetic flux of the type NN and NS type rotor are being compared its resulting output voltage. The value and form of flux and voltage that produced of both types of these generators without changing the material and the mass of the generator.
"
Depok: Fakultas Teknik Universitas Indonesia, 2010
S51178
UI - Skripsi Open  Universitas Indonesia Library
cover
Muhammad Kahlil Firdausi
"Generator sinkron magnet permanen fluks aksial rotor ganda tanpa inti stator adalah generator fluks aksial yang biasa digunakan untuk putaran rendah. generator fluks aksial jenis ini mudah dalam hal pembuatan, namun disain optimal dari rotor generator tersebut masih perlu diperhitungkan.
Skripsi ini membandingkan pengaruh jumlah pasang kutub magnet pada rotor terhadap fluks magnet yang dihasilkan. Fluks tersebut menentukan bentuk gelombang sinusoidal, fluks magnetik, tegangan dan torsi elektromekaniknya. Hasil dari simulasi dan analisa menunjukkan bahwa rotor berkutub 24 percakram paling optimal untuk di disain.

A permanent magnet axial flux dual disk rotor coreless stator syncrhonous generator is normally used for low speed. Generators of this type are more easy to built, but the design optimization of these generators must be taken into account.
In this bachelor's thesis the effect of the rotor magnetic poles number to the magnet flux generated are being compared. Its flux will determine the wave shape, voltage and electromechanical torque of the generator. Results of the simulation and analysis indicate that a rotor with 24 poles perdisk is the most optimal design.
"
Depok: Fakultas Teknik Universitas Indonesia, 2010
S51216
UI - Skripsi Open  Universitas Indonesia Library
cover
Sinaga, Arnol
"Penggunaan Pembangkit Listrik Tenaga Bayu makin meningkat sebagai sumber energi listrik terbarukan. Salah satu permasalahan dalam pemanfaatan PLTB adalah pengendalian generator induksi. Pada penelitian ini telah dirancang pengendali RFOC, Full Observer dan pengendali daya sebagai satu kesatuan kendali generator induksi. Tipe generator induksi yang dipakai adalah SCIG. Pengendali Rotor Flux Oriented Control (RFOC) adalah pengendali vektor yang mengatur arus stator. RFOC terdiri dari dua bagian yaitu decoupler dan pengendali PI untuk mengendalikan arus. Pengendali RFOC adalah pengendali yang memerlukan masukan arus stator referensi, arus stator generator dan kecepatan putar rotor generator.
Untuk mendapatkan kecepatan putar rotor generator, dalam penelitian ini didesain full order observer sebagai masukan pengendali RFOC sehingga tidak menggunakan sensor kecepatan. Sedangkan pengendali daya didesaian agar daya keluaran generator sesuai dengan daya referensi yang diberikan. Analisa dilakukan berdasarkan hasil simulasi pada MATLAB/Simulink dan C-Mex S-Function. Berdasarkan hasil simulasi, RFOC yang dirancang telah berhasil mengendalikan generator dengan perubahaann arus stator sumbu q, full observer dapat mengestimasi state dengan error 5% pada model dan kecepatan putar dengan error 0.43% dan waktu stabil 1.4s dan pengendali daya bekerja dengan baik.

The use of wind power plants as a source of renewable electric energy is increasing. One of the problems in the utilization wind turbin is the control of an induction generator. In this study, RFOC, Full Observer and Power Controller have been designed as control of induction generator. Induction generator type used is SCIG. Controlling Rotor Flux Oriented Control (RFOC) is a vector controller that regulates the stator currents. RFOC consists of two parts, decoupler and current PI controller. RFOC controller requires input reference stator current, stator current generator and the generator rotor rotational speed.
In this study, instead of speed sensor, full order observer has been used to estimate generator rotor speed. Power controller is used to regulate the generator output power in accordance with the references given. In this study, verification of controller performance has been done by using simulation MATLAB/Simulink. Simulation results show that RFOC, full observer and power controller have achieved its performance. RFOC has control the generator with change of q-axis stator current. Full observer has estimate with 5% error, and rotational speed with 0.43% with 1.4s. Power control have also worked well.
"
Depok: Fakultas Teknik Universitas Indonesia, 2012
S43323
UI - Skripsi Open  Universitas Indonesia Library
cover
Dita Zakiah
"ABSTRAK
Sistem pembangkitan pada Region Bali diharapkan mampu untuk memenuhi permintaan beban listrik setelah dilakukan pengembangan sistem pembangkitan dengan penambahan kapasitas pada periode 2017-2021. Dengan demikian perlu dianalisis bahwa dengan penambahan kapasitas pembangkit pada sistem pembangkitan Region Bali dapat meningkatkan keandalan sistem dalam memenuhi kebutuhan beban yang pada penelitian ini diukur dari nilai indeks probabilitas kehilangan beban Loss of Load Probability dan besar energi tidak terlayani Energy Not Served . Analisis terbagi dalam 3 skenario, skenario pertama adalah ketika pengembangan sistem pembangkitan sesuai dengan perencanaan pada RUPTL 2017-2026, skenario kedua adalah ketika proyek pembangkitan mengalami keterlambatan, dan skenario ketiga adalah ketika jaringan kabel bawah laut mengalami gangguan. Nilai indeks LOLP dihitung menggunakan perangkat lunak WASP-IV kemudian akan dievaluasi dengan membandingkan nilai nya pada standar nilai indeks keandalan yang telah ditetapkan oleh PT PLN Persero , yaitu indeks LOLP lebih kecil dari 0,274 , atau ekuivalen dengan lebih kecil dari 1 hari/tahun. Pada skenario pertama, nilai LOLP yang memenuhi standar hanya terjadi pada tahun 2017 0,8 hari/ tahun . Pada skenario kedua dengan empat variasi keterlambatan masuknya pembangkit, nilai LOLP yang memenuhi standar hanya terjadi pada tahun 2017 0,8 hari/ tahun dan nilai LOLP terburuk terjadi pada saat keterlambatan PLTM 42,8 hari/ tahun . Pada skenario ketiga dengan empat variasi gangguan jaringan kabel bawah laut, nilai LOLP terburuk terjadi saat Region Bali tidak mendapatkan daya sama sekali akibat gangguan 257,6 hari/ tahun

ABSTRACT
Generation system in Bali is expected to be able to meet the demand of electricity load after the expansion of the generation system with the addition of capacity. Thus it needs to be analyzed that with the addition of generating capacity in the Bali rsquo s generation system can improve the reliability of the system in meeting the load demands which in this study is measured from the value of the Loss of Load Probability LOLP index and total Energy Not Served ENS . The analysis is divided into 3 scenarios, the first scenario is when the expansion of the generating system in accordance with the planning in RUPTL 2017 2026, the second scenario is when the generation project is delayed, and the third scenario is when the submarine cable network is interrupted. The LOLP index value calculated using WASP IV software, then be evaluated by comparing its value to the standard value of reliability index determined by PT PLN Persero , LOLP index smaller than 0,274 , or equivalent to less than 1 day year. For the first scenario, the index value that meets the standard only occurs in 2017 0,8 days year . For the second scenario with four variations of delayed of the plant, the index value that meets the standard only occurs in 2017 0,8 days year and the worst index value occurs during the delay of the PLTM project 42,8 days year . For the third scenario with four variations of submarine cable network disturbance, the worst index value occurs when Bali does not get any power at all due to interference 257,6 days year ."
2017
S66948
UI - Skripsi Membership  Universitas Indonesia Library
cover
Syifa Restu Pramesti
"ABSTRAK
Pada COP ke-26 tahun 2021 di Glasgow, Pemerintah Indonesia menegaskan komitmen tanah air untuk mencapai net zero emissions (NZE) pada tahun 2060, seiring dengan aksi percepatan dalam rangka Paris Agreement dan United Nations Framework Convention on Climate Change. Fokus utama di sini adalah penggunaan Energi Baru Terbarukan (EBT), khususnya energi surya yang memiliki potensi sangat besar di Indonesia dan dianggap menjadi pemegang peran penting dalam mewujudkan serangkaian pilar Sustainable Development Goals (SDGs), yaitu affordable and clean energy; industry, innovations, and infrastructure; dan climate action. Dalam upaya mencapai target 23% EBT pada bauran energi nasional tahun 2025, Pemerintah Indonesia sedang menggalakkan program pengembangan dari pemanfaatan PLTS atap, terutama untuk daerah perkotaan yang memiliki permasalahan keterbatasan lahan. Penelitian ini akan difokuskan terkait perancangan sistem PLTS atap on-grid pada Gedung Teknologi 3, BRIN yang mana memiliki intensitas radiasi matahari cukup tinggi sekitar 4,83 kWh/m2/hari dan potensi pemanfaatan area atap yang luas menggunakan perangkat lunak PVsyst. Selain itu, dilakukan perbandingan atas fixed tilted plane dengan seasonal tilt adjustment terhadap nilai optimum tilt angle (OTA) tertentu dalam rangka memaksimalkan radiasi matahari untuk dimanfaatkan oleh panel surya. Berdasarkan analisis dan evaluasi secara teknis maupun ekonomis melalui empat skenario yang mampu dilakukan berdasarkan kombinasi hasil perhitungan jumlah komponen dengan pengaturan orientasi, dihasilkan perancangan PLTS yang memiliki pembangkitan sebesar 106,015 kWp dengan kebutuhan komponen sebanyak 233 modul surya dan 4 inverter serta melalui pengaturan orientasi berupa seasonal tilt adjustment adalah berkinerja paling optimal. Menurut aspek teknis yang ditinjau, perancangan tersebut mampu memberikan kontribusi terhadap penggunaan energi listrik pada hari kerja sebesar 46% dan hari libur sebesar 61%, menghasilkan Performance Ratio (PR) sebesar 82,74%, dan menyediakan pembangkitan energi listrik sebesar 158.156 kWh per tahun dengan global incident in collector plane sebesar +2,4%, near shadings: irradiance loss sebesar -0,80%, dan IAM factor on global sebesar -1,84%. Sementara itu, menurut aspek ekonomis yang ditinjau, perancangan tersebut mampu memberikan kontribusi terhadap penghematan biaya tagihan listrik sebesar 37% per tahun, membutuhkan biaya investasi awal sebesar Rp2.220.984.249, menghasilkan Payback Period (PP) pada tahun ke-16, menyediakan Net Present Value (NPV) sebesar Rp2.612.851.243, dan membentuk Benefit Cost Ratio (BCR) sebesar 1,18 dengan umur proyek yang direncanakan selama 20 tahun.

ABSTRACT
At the 26th COP in 2021 in Glasgow, the Government of Indonesia emphasized the country's commitment to achieve net zero emissions (NZE) by 2060, along with accelerated action within the framework of the Paris Agreement and the United Nations Framework Convention on Climate Change. The main focus here is using renewable energy, especially solar energy, which has enormous potential in Indonesia and is considered to be an essential role holder in realizing a series of Sustainable Development Goals (SDGs) pillars, namely affordable and clean energy; industry, innovations, and infrastructure; and climate action. To achieve the 23% renewable energy target in the national energy mix by 2025, the Government of Indonesia is promoting a development program for using rooftop solar power plants, particularly in urban areas with limited land availability. This research will focus on designing an on-grid rooftop solar power plant system at Technology Building 3, BRIN, which has a high solar radiation intensity of around 4,83 kWh/m2/day and the potential to utilize a large roof area using PVsyst software. In addition, a comparison of the fixed tilted plane with the seasonal tilt adjustment to certain optimum tilt angle (OTA) values is carried out to maximize solar radiation to be utilized by solar panels. Based on the analysis and evaluation, technically and economically, through four scenarios that can be done based on the combination of the results of the calculation of the number of components with the orientation settings, the resulting solar power plant design has a generation of 106,015 kWp with a component requirement of 233 solar modules and 4 inverters and through orientation setting in the form of seasonal tilt adjustment is the most optimal performance. According to the technical aspects reviewed, the design can contribute to the use of electrical energy on weekdays by 46% and weekends by 61%, resulting in a Performance Ratio (PR) of 82,74%, and providing electrical energy generation of 158.156 kWh per year with a global incident in collector plane of +2,4%, a near shadings: irradiance loss of -0,80%, and a IAM factor on global of -1,84%. Meanwhile, according to the economic aspects reviewed, the design can contribute to savings in electricity bill costs of 37% per year, requiring an initial investment cost of IDR 2.220.984.249, generating a Payback Period (PP) in year 16, providing a Net Present Value (NPV) of IDR 2.612.851.243, and forming a Benefit Cost Ratio (BCR) of 1,18 with the planned project life of 20 years."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Arief Rahman Darmawan
"Pada sebuah LNG complex site, terdapat dua permasalahan, yaitu rendahnya kehandalan di pembangkit listrik existing LNG plant dan adanya beban baru dari new LNG plant. Kemudian dibuatlah beberapa alternatif pemecahan masalah untuk dua permasalahan tersebut. Setelah dianalisis, alternatif pemecahan masalah yang paling mungkin dilakukan adalah pembangunan pembangkit listrik baru untuk memenuhi beban baru dan diinterkoneksi ke pembangkit listrik eksisting untuk meningkatkan kehandalannya. Kesalahan pemilihan pembangkit listrik baru akan menyebabkan inefisiensi dan tidak mampu mengatasi permasalahan rendahnya kehandalan di existing LNG plant.
Akan dilakukan penelitian untuk menentukan jenis dan kapasitas serta jumlah unit pembangkit listrik baru yang tepat. Sehingga keseluruhan pembangkit listrik, eksisting maupun baru, dapat menyuplai energi listrik dengan handal dan efisien serta dengan biaya serendah mungkin sesuai dengan prinsip to provide good quality energy at the lowest possible cost. Dari beberapa alternatif pembangkit listrik baru akan dicari alternatif pembangkit listrik yang paling optimal dari sisi kehandalan dan keekonomian pembangkit.
Parameter kehandalan pembangkit menggunakan metode LOLP (Loss of Load Probability) sedangkan parameter keekonomian pembangkit menggunakan perhitungan COE (Cost of Electricity) dan LCC (Lifecycle Cost). Kemudian dilakukan analisis kelayakan investasi guna mengetahui apakah investasi pembangkit listrik baru tersebut layak. Berdasar analisis, PLTMG 6x16 MW adalah yang paling optimal secara kehandalan dan keekonomian pembangkit listrik. Minimal terjadinya total black out pada kondisi eksisting adalah 50 hari per tahun, sedangkan LOLP setelah penambahan pembangkit listrik baru ini adalah 2,93 hari per tahun. Investasi pembangkit listrik tersebut dinyatakan layak.

There are two problems in an LNG complex site, lack of reliability of the power plant in the existing LNG plant and additional load of new LNG plant. Then defined some alternatives to solve these problems. After these alternatives has been analyzed, the best alternative can be done is create new power plant to cater the new load and to be interconected with the existing power plant to increase the reliability. Miscasting the new power plant will cause an innefficiency and cannot increase the reliability of electricity supply in the LNG complex site.
The purposes of this research are to choose the best type of power plant for the new power plant, how much the capacity and the number of the new power plant. So that the new and existing power plant can supply the electricity to whole LNG complex site with high reliability at the lowest possible cost, suitable with motto ?to provide good quality energy at the lowest possible cost. From some alternatives of new power plants, will be analyzed which is the most optimal power plant in terms of reliability and economical.
Reliability parameter of power plant using LOLP (Loss of Load Probability) method while economic parameter of power plant using COE (Cost of Electricity) and LCC (Lifecycle Cost). Investment feasibility analysis to determine wheter the investment of new power plant is feasible. The result of the analysis, Gas Engine Power Plant 6x16 MW is the most optimal alternative in term of reliability and economical. Minimum total black out of existing system is 50 days per year, while the LOLP after interconnected with the new power plant become 2,93 days per year. The investment of that power plant is feasible.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Tyas Kartika Sari
"Penurunan operasi pembangkit listrik PLTD Pesanggaran yang disebabkan oleh derating, tingkat efisiensi rendah, tingkat emisi dan kebisingan yang tinggi telah menimbukan masalah kelistrikan di Bali. Selain itu, PLTD Pesanggaran juga masih menggunakan bahan bakar minyak (single fuel) dimana biaya pokok produksi energi listrik meningkat seiring naiknya harga bahan bakar HSD (High Speed Diesel). Oleh sebab itu, untuk mempertahankan suplai listrik di Bali tetap terpenuhi, pemilik perusahaan melakukan efisiensi melalui program diversifikasi energi.
Pada tahun 2012, sebuah perusahaan konsultan telah dipilih untuk melakukan kajian FS (feasibility study) untuk menilai kelayakan operasi pembangkit. Kajian tersebut menyarankan agar perusahaan melakukan assets retirement without abandonment untuk PLTD Pesanggaran yaitu dengan melakukan penggantian (replacement) pembangkit lama dengan pembangkit baru yang menggunakan dual fuel engine.
Metode yang digunakan adalah perhitungan biaya COE, LCC dan economic life dari pembangkit lama maupun pembangkit baru. Penelitian menggunakan data amatan PLTD Pesanggaran, di Bali. Dengan metode tersebut dapat menghasilkan suatu model management tools untuk menentukan kelayakan keekonomiannya. Model management tools tersebut dapat dipakai untuk mempermudah pengambilan keputusan di kasus-kasus serupa pada pembangkit listrik PLTD.

The decline in diesel power plant operation Pesanggaran caused by derating, the level of low efficiency, emissions and noise levels are high already raises the problem of electricity in Bali. In addition, diesel Pesanggaran also still use fuel oil (single fuel) in which electrical energy production cost increases with rising fuel prices HSD (High Speed Diesel). Therefore, to maintain the supply of electricity in Bali remains unfulfilled, the owner of the company to improve efficiency through energy diversification program.
Additionally in 2012, a consulting firm has been selected to conduct a study FS (Feasibility Study) to assess the feasibility of plant operation. The study recommends that companies perform asset retirement without abandonment to diesel Pesanggaran by performing replacement (replacement) old plant with a new plant that uses a dual fuel engine.
A methodology is needed to conduct research studies both technical and economical feasibility of the concept. The study used data Pesanggaran diesel observations, in Bali. The methodology can produce a model management tools to determine its economic feasibility as well as to perform sensitivity testing of each parameter related. Model management tools can be used to facilitate decisionmaking in similar cases in the diesel power plant.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
T43702
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>