cover
Bayu Candraditya
"Kegagalan prematur pada material mixing chamber turbin gas. Bentuk kegagalan yang terdeteksi adalah terjadinya lubang atau sumuran. Analisa dilakukan dengan melakukan studi pada material paduan yang berjenis 16Mo3/17Mn4 untuk digunakan pada mixing chamber, dengan mengambil data-data seperti komposisi kimia, komposisi deposit, bahan bakar, mikrostruktur, dan kekerasan.
Dari hasil analisa yang dilakukan, dapat disimpulkan bahwa kegagalan disebabkan oleh serangan korosi temperatur tinggi pada rentang temperatur 600 - 800°C atau tipe kedua. Data literatur menunjukkan terbentuknya senyawa natrium sulfat dan vanadium oksida dari proses pembakaran yang menyebabkan terjadinya korosi sumuran.

There were premature failures of mixing chamber part of turbine gas. The failure has been detected from pitting formation. Analyses is done taking from material alloy of 16Mo3/17Mn4 that used in mixing chamber with data-data like: material composition, deposits composition, fuel oil, microstructures, and micro hardness.
From analysis, it can be concluded that failure in mixing chamber were done by hot corrosion attack in temperature 600 - 800°C or type II (LTHC). Literatures showing that natrium sulfate and vanadium oxide were resulted from the combustion process thus pitting corrosion.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
S51503
UI - Skripsi Open  Universitas Indonesia Library
cover
Jaya Wardhana
"Gas turbin banyak digunakan untuk membangkitkan energi listrik. Gas turbin ini umumnya dirancang untuk beroperasi pada suhu ISO, yaitu 15°C. Dengan temperatur ambien Indonesia yang senilai kurang lebih 30°C maka efisiensi gas turbin akan menurun sekitar 10 . Semakin kecil efektivitas turbin tersebut, semakin kecil pula listrik yang diproduksinya. Maka pada studi ini, penulis akan menggunakan TIAC Temperature Inlet Air Cooling untuk mendingingkan suhu udara masuk ke gas turbin dari sekitar 30°C menjadi 15°C dengan harapan efisiensi gas turbin akan meningkat. Sistem TIAC yang dipakai pada studi ini adalah absorption chiller. Pendingin tersebut menggunakan sumber panas untuk membuat refrigerant bersirkulasi. Fluida yang digunakan pada parameter temperature ini adalah LiBr-H2O solution.
Tujuan dari studi ini adalah untuk merancang sebuah absorption cooling system supaya suhu ambien pada turbin gas dapat mencapai suhu ISO dan berfungsi secara efektif. Perancangan absorption cooling system ini akan dilakukan dengan perhitungan heat and mass balance menggunakan Engineering Equation Solver EES . Hasil dari studi ini adalah peningkatan dari power output turbin gas dikarenakan oleh penurunan suhu masuk udara dari sekitar 30°C menjadi 15°C.

Turbine gas is commonly used in power plant to get electricity. This turbine usually designed to operate in ISO Temperature, that is 15°C. With the ambient temperature of Indonesia that is around 30°C, the efficiency of turbine will take around 10 drop. If the effectivity of the turbine drops, the electricity that it produces will drop too. On this thesis, writer will use TIAC Temperature Inlet Air Cooling to cool down the inlet air of turbine gas from around 30°C to 15°C with hope of raising the efficiency. TIAC that will be used on this study is the absorption chiller system. This type of chiller used heat source to make refrigerant circulate. Fluid that is used on this system is LiBr H2O solution.
The goal of this thesis is to design an absorption cooling system to make the inlet air of gas turbine has ISO temperature. Design process of the absorption chiller will be done with heat and mass balance with the help of Engineering Equation Solver EES. The outcome of this study is a raise in power output of the gas turbine that is caused by inlet air temperature that is lowered from 30°C to 15°C.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S68694
UI - Skripsi Membership  Universitas Indonesia Library
cover
Niko Lastarda
"Dalam melayani sebuah sistem kelistrikan dibutuhkan pembangkit yang handal dan efisien. Pembangkit Listrik Tenaga Gas Uap PLTGU merupakan salah satu pilihan pembangkit thermal yang mempunyai kriteria tersebut. Terdapat beberapa jenis konfigurasi PLTGU. Khusus untuk PLTGU dengan dua turbin gas memliki dua jenis konfigurasi, yaitu konfigurasi 2G-2H-3S dua turbin gas, dua HRSG, tiga turbin uap dan konfigurasi 2G-2H-1S dua turbin gas, dua HRSG, satu turbine uap . Mode operasi dari setiap jenis konfigurasi menghasilkan keandalan dan efisiensi yang berbeda.
Penelitian ini bertujuan untuk menghitung efisiensi dan keandalan dari dua jenis konfigurasi PLTGU yang menggunakan dua turbin gas, sehingga dapat menentukan pengaruh jenis konfigurasi terhadap efisiensi dan keandalan PLTGU. Dengan menggunakan metode energi input ouput untuk menentukan besar efisiensi dan dengan menghitung Equivalent Availability Factor EAF untuk mendapatkan faktor kesiapan atau keandalan pembangkit.
Dari hasil perhitungan didapatkan konfigurasi 2G-2H-1S memliki nilai efisiensi yang lebih tinggi dari konfigurasi 2G-2H-3S, terhitung Untuk mode operasi Full Blok Cycle konfigurasi 2G-2H-1S memliki efisiensi maksimum 55.5 sedangkan konfigurasi 2G-2H-3S efisiensi maksimum 53.5 . Sedangkan untuk nilai keandalan konfigurasi 2G-2H-3S lebih handal dibandingkan dengan konfigurasi 2G-2H-1S. Untuk mode operasi Full Blok Cycle memliki 93.39 EAF, sedangkan konfigurasi 2G-2H-3S 92.62 EAF. Dari segi keekonomian kedua jenis konfigurasi memiliki nilai kelayakan, dimana untuk konfigurasi 2G-2H-1S lebih ekonomis dilihat dari NPV 371,286,536 USD dan IRR 12 serta waktu pengembalian modal yang relative lebih cepat 9 tahun. Dengan mengetahui konfigurasi PLTGU yang handal, efisien dan ekonomis dapat dijadikan dasar pengambilan keputusan untuk pemilihan konfigurasi PLTGU yang sesuai dengan kebutuhan beban dasar, beban menengah, atau beban puncak di sebuah sistem kelistrikan.Kata Kunci : EAF, Efisiensi, Keandalan, Konfigurasi PLTGU, PLTGU.

In serving the electrical systems required a reliable and efficient plants. Combined Cycle Power Plant CCPP is one of the thermal power plants that have a selection criteria. There are several types of CCPP configurations. Especially for CCPP with two gas turbines have two types of configurations, the configuration of 2G 2H 3S two gas turbines, two HRSG, three steam turbines and the configuration of 2G 2H 1S two gas turbines, two HRSG, one steam turbine , The mode of operation of each type of configuration produces a different reliability and efficiency.
This study aimed to quantify the efficiency and reliability of two types of power plant configuration that uses two gas turbines, so as to determine the effect of this type of configuration on the efficiency and reliability of the CCPP. By using the input energy ouput to determine the efficiency and to calculate Equivalent Availability Factor EAF to obtain readiness factors or reliability of the power plant. From the results of the calculation.
Calculation resulting from the configuration of 2G 2H 1S has a higher efficiency values of configuration 2G 2H 3S, accounting for full block cycle operating modes configuration 2G 2H 1S discount maximum efficiency of 55.5 , while the configuration of 2G 2H 3S efficiency a maximum of 53.5 . As for the value of reliability configuration 2G 2H 3S is more reliable than the configuration of 2G 2H 1S. For full block cycle operating modes discount EAF 93.39 , while the configuration 2G 2H 3S 92.62 EAF. In terms of economics both types of configurations have a feasibility value, which for configuration 2G 2H 1S more economical views of NPV 371,286,536 USD and IRR 12 and the payback time is 9 years faster. By knowing the configuration of a reliable, efficient and economical power plant can be used as a basis for a decision on the selection of CCPP configurations in accordance with based load, medium load, or peak load requirements in an electrical system.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48049
UI - Tesis Membership  Universitas Indonesia Library
cover
Yusuf Satria Prihardana, Author
"Energi listrik merupakan kebutuhan yang sangat vital bagi kehidupan manusia. Tanpa adanya listrik berbagai aktivitas tidak dapat dilakukan. Kebutuhan akan energi listrik akan terus meningkat dari waktu ke waktu. Peningkatan akan kebutuhan energi listrik ini seiring dengan pembangunan yang terjadi. Tak terkecuali di Universitas Indonesia. Pembangunan besar-besaran yang terjadi sejak tahun 2010 hingga tahun 2025 membuat kebutuhan akan listrik di Universitas Indonesia meningkat drastis. Namun, jumlah daya yang ada di seluruh gardu listrik di Universitas Indonesia masih jauh dari cukup untuk memenuhi kebutuhan tersebut.
Untuk itu, dalam skripsi ini, penulis mencoba memanfaatkan potensi yang ada di Universitas Indonesia untuk memenuhi kebutuhan listrik dalam kampus secara mandiri dan melakukan studi perancangan pembangkit listrik tenaga gas sebagai alternatif untuk memenuhi kebutuhan listrik untuk Universitas Indonesia. Alternatif untuk memenuhi kebutuhan listrik tambahan di Universitas Indonesia adalah dengan membangun PLTG yang menggunakan sistem pendinginan udara masuk kompresor Absorption chiller untuk meningkatkan efisiensi dari Pembangkit. Di dalam tulisan ini juga dipaparkan analisis finansial apabila menggunakan PLTG mandiri.

Electrical energy is a vital necessity for human life. Without electricity, activities can not be done. The necessity for electrical energy will increase continously over time. Increased of electrical energy necessity is in line with the development, include at University of Indonesia. Massive development that have occurred since the year 2010 to 2025 made the necessity of electricity has increased significantly. However, the amount of power that exist around the electrical substation at the University of Indonesia is still far from enough to supply those necessity.
Therefore, in this last project, the authors tried to use all of pontencies to fulfill electricity necessity in this Campus and make design study of gas power plants as an alternative to supply the electricity necessity for University of Indonesia. The alternative to fulfill electricity necessity in University of Indonesia is built Gas Power Plant that used Inlet Air Cooling System to Compressor to increase the efficiency of Power Plant. In this paper is explained financial analyze too if using Independent Gas Power Plant.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
S55294
UI - Skripsi Membership  Universitas Indonesia Library
cover
Manurung, Efendi
"Kebutuhan energi di perdesaan dapat dihasilkan turbin gas berbahan bakar bioenergi mengingat bahan baku bioenergi cukup tersedia , sehingga dengan tersedianya energi di perdesaan tercipta kegiatan yang sifatnya produktif untuk membuka lapangan kerja dan mengurangi kemiskinan. Sektor properti di perkotaan yang merupakan salah satu penyerap energi terbanyak dapat juga menggunakan turbin gas berbahan bakar bioenergi sehingga tercipta bangunan yang dapat mencukupi kebutuhan energinya sendiri dari sumber energi terbarukan, hal ini merupakan konsep Zero Energy Building. Turbin gas yang diharapkan mengatasi ketersediaan energi mempunyai keunggulan yakni intalasi cepat, ukuran sistem, massa, dan biaya investasi relatif lebih rendah; dapat dioperasikan dalam keadaan dingin ; getaran yang dihasilkan jauh lebih kecil; pelumasan yang lebih sederhana; efisiensi mekanis lebih baik; dapat menggunakan bermacammacam bahan bakar; gas buangnya bersih; serta gas buang dari turbin gas dapat dimanfaatkan untuk melakukan destilasi bioetanol. Tetapi, turbin gas juga mempunyai kelemahan-kelemahan, diantaranya efisiensi termal yang rendah; degradasi komponen yang terlalu cepat; dan bencana kegagalan sistem. Kelemahan tersebut diakibatkan ketidakstabilan pembakaran yang disebabkan oleh panas yang dihasilkan oleh ruang bakar tidak tetap. Sehingga muncul pertanyaan apakah bahan bakar yang ada di dalam ruang bakar tersebut sudah terbakar maksimal; karakteristik gas yang dihasilkan oleh proses pembakaran pada ruang bakar; besarnya thermal stress yang dialami oleh ruang bakar tersebut. Metodologi yang dilakukan menjawab pertanyaan tersebut adalah melakukan percobaan dengan menggunakan turbin gas mikro Proto X-1, membuat pemodelan dan simulasi dari ruang bakar, kemudian hasil percobaan tersebut dijadikan sebagai input simulasi model ruang bakar dengan menggunakan perangkat lunak CFDSOF. Sehingga diketahui karakterisitik distribusi temperatur, distribusi bahan bakar, distribusi udara dan distribusi produk gas.

Energy need in rural area can be filled with the use of bioenergy gas turbine, considering the bioenergy fuel availability with its raw material, which the production of bioenergy fuel can also reduce poverty by employing local laborer. Also, bioenergy gas turbine can also supply the energy need in urban property sector ? the most energy absorber. This condition help the building to meet its own energy needs with renewable energy source, called Zero Energy Building Concept (ZEB). With its advantages, i.e. quick installation, system dimension, weight, low investment cost, cold operation, lower lubricating parts, better mechanical efficiency, fuel variations operating, cleaner exhaust gas, the gas turbines are expected to carry the energy availabilities. Besides, high temperature of the exhaust gas can be used for bioethanol distillation system. However, the gas turbine also have weakness, i.e. low thermal efficiency, rapid components degradation, and system failure which caused by instability combustion as a result of unstable combustor temperature. This conditions arises whether the existing fuel in the combustion chamber is converted to fire; exhaust gas characteristics; thermal stress magnitude of the combustion chamber. A Prototype of Micro Gas Turbine Proto X-1 is designed and combustion CFD simulation has done to answer. Experimental results from the Proto X-1 are used as the input of the combustion CFD simulation which done by CFDSOF software resulting the temperature distribution, fuel distribution, air distribution, and exhaust gas distribution. "
Depok: Fakultas Teknik Universitas Indonesia, 2011
T29553
UI - Tesis Open  Universitas Indonesia Library
cover
Emapatria Chandrayani
"LNG memiliki potensi untuk menjadi pemasok energi untuk menjangkau kepulauan di Indonesia dan telah direncanakan untuk memasok pembangkit listrik di pulau-pulau terpencil. Analisis tekno-ekonomi pembangkit listrik turbin gas terintegrasi dengan unit regasifikasi LNG skala kecil telah dilakukan untuk meningkatkan efisiensi pembangkit listrik dan mengurangi biaya pembangkitan listrik. Analisis dimulai dengan membuat simulasi proses dari sistem yang divalidasi untuk menggambarkan kinerja turbin gas aktual menggunakan simulator proses Aspen Hysys. Kemudian, dilakukan beberapa integrasi seperti penerapan pembangkit uap dalam combined cycle sebagai pembangkit listrik sekunder, pemanfaatan energi dingin dari regasifikasi LNG untuk pendinginan udara masukan kompresor turbin gas, dan pemanasan kembali bahan bakar gas oleh sebagian uap yang dihasilkan. Hasil simulasi memberikan akurasi yang baik dan memungkinkan untuk diintegrasikan dengan proses-proses tersebut. Integrasi gabungan memberikan keuntungan yang lebih tinggi, memberikan kenaikan daya listrik hingga 49,4% serta meningkatkan efisiensi sebesar 44,6% dan menurunkan emisi spesifik CO2 sebanyak 30,9% dibandingkan dengan simple cycle turbin gas. Berdasarkan analisis LCOE, integrasi gabungan memberikan biaya produksi listrik 20,89% lebih rendah daripada simple cycle turbin gas sekitar 14,56 sen/kWh pada faktor kapasitas 80%. Terlebih lagi, integrasi gabungan pembangkit listrik turbin gas selalu memberikan LCOE lebih rendah dibandingkan simple cycle turbin gas dalam berbagai faktor kapasitas, yaitu 21,64% lebih rendah untuk faktor kapasitas tinggi dan setidaknya 7,96% lebih rendah untuk faktor kapasitas kecil. Nilai ini dianggap lebih ekonomis dibandingkan pembangkit listrik berbahan bakar diesel. Optimalisasi upaya integrasi untuk peningkatan efisiensi sistem pembangkit listrik turbin gas dapat meningkatkan kinerja dan menurunkan total biaya pokok pembangkitan listrik.

LNG has a potential to become energy supply across Indonesian archipelago and has been planned to supply power plant in remote islands. A techno-economic analysis of integrated small scale gas turbine power plant and LNG regasification unit has been conducted to increase power plant efficiency and reduce electricity generation cost. The analysis begins with creating process simulation of the system that is validated to represent actual gas turbine performance using Aspen Hysys process simulator. Then several integrations are introduced: combined cycle steam generation as secondary power generation, cold energy utilization from LNG regasification to chill intake air compressor of gas turbine, and fuel gas reheating by a small portion of generated steam. The simulation result provides a good accuracy and enable integration to such processes. The combined integration provides higher advantages, providing extra power output up to 49.4% as well as increasing efficiency up to 44.6% and lowering as much as 30.9% specific CO2 emission than simple cycle gas turbine. Based on LCOE analysis, combined integration provides 20.89% lower cost of electricity production than gas turbine simple cycle around 14.56 cent/kWh at 80% capacity factor. The combined integration of gas turbine power plant always delivers LCOE lower than gas turbine simple cycle in any capacity factors which are 21.64% lower for high-capacity factors and at least 7.96% lower for low-capacity factors. This is considered more economically viable than diesel-fueled power plant. The higher efficiency of integrated power plant-LNG regasification system could better improve performance and further reduce generation cost."
Jakarta: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Franky K. Koraag
"Pemeliharaan pembangkit listrik harus dilakukan dalam durasi yang direncanakan. Perpanjangan durasi pemeliharaan tidak hanya berdampak pada kinerja perusahaan pembangkit tetapi juga mempengaruhi pengoperasian sistem kelistrikan yang dilakukan oleh operator sistem. Oleh karena itu penting untuk mengetahui risiko-risiko utama dan urutan prioritasnya sehingga mitigasi dapat dilakukan. Mitigasi ini dapat meningkatkan efektivitas pemeliharaan. Penelitian ini dilakukan di Pembangkit Listrik Tenaga Gas (PLTG) Muara Karang Blok 1, Jakarta. PLTG ini diproduksi oleh General Electric dengan jenis turbin gas MS9000. Dalam studi ini identifikasi risiko dilakukan dengan mempelajari riwayat pemeliharaan selama 10 tahun terakhir. Selain itu, pendapat juga diminta dari para ahli yang berpengalaman dalam memelihara pembangkit listrik ini. Analisis risiko menggunakan metode matriks risiko untuk menyaring risiko yang telah diidentifikasi. Output dari matriks risiko ini adalah risiko-risiko utama yang harus dimitigasi. Selanjutnya untuk memprioritaskan risiko-risiko utama tersebut, metode Proses Hirarki Analitik (PHA) digunakan dengan bantuan responden ahli. Pada akhirnya penelitian ini menghasilkan risiko-risiko utama dengan urutan prioritasnya mulai dari retak pada flexible lead rotor generator, temuan kerusakan pada nozzle tingkat pertama, ketidaksesuaian hasil perbaikan part turbin, kegagalan sistem pelumasan bearing generator, tingkat curah hujan tinggi , part pengganti nozzle dan bucket datang terlambat, load tunnel terbakar, kebocoran H2 dari bushing / bracket generator, accessories gear baru tidak standar, kerusakan part torque converter, dan kebocoran saluran bahan bakar minyak saat start up PLTG
Maintenance of power plants must take place within the planned duration. Extension of maintenance duration not only has an impact on the performance of the generating company but also affects the operation of the electricity system implemented by system operator. Therefore it is important to know the main risks and the order of priorities so that mitigation can be done. This mitigation can improve effectiveness of maintenance. This research was conducted at Muara Karang Gas Turbine Power Plant Block 1, Jakarta. The gas turbine is manufactured by General Electric with the type of MS9000 gas turbine. In this study, risk identification is done by studying the maintenance history of the last 10 years. In addition, opinions were also asked from experts who were experienced in maintaining this power plant. Risk analysis uses a risk matrices method to filter out the risks that have been identified. The output of this risk matrices is ​​the main risks that must be mitigated. Next to prioritize the main risks, the AHP method is used with the help of expert respondents. In the end this research produced the main risks in the order of priorities starting from cracks on flexible lead of generator rotor, damage findings at the first stage nozzle, incompatibility results of turbine parts repair, failure of the generator bearing lubrication system, high rainfall rate, replacement part of nozzle and bucket arrive late, load tunnel is burning, H2 leakage from generator bushing/bracket, new accessories gear is not standard, damage of torque converter part, and leakage of fuel oil line at startup of the Gas Turbine Power Plant"
2019
T53331
UI - Tesis Membership  Universitas Indonesia Library
cover
Melati Sarnita
1999
S47875
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fakultas Teknik Universitas Indonesia, [date of publication not identified]
04 Suh a
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Agung Priyambodho
"ABSTRAK
Listrik merupakan sumber energi primer masyarakat, dengan perkembangan ekonomi suatu wilayah maka pertumbuhan kebutuhan energi listrik akan meningkat sejalan dengan hal tersebut perlu dilakukan pembangunan pembangkit dan transmisi listrik yang terencana. Kalimantan Tengah merupakan wilayah indonesia yang memiliki sumber gas alam yang melimpah, dimana saat ini kondisi kelistrikan Kalimantan merupakan wilayah yang dapat dikatagorikan defisit listrik, serta pembangkit di Wilayah Kalimantan Tengah masih menggunakan pembangkit dengan bahan bakar diesel. Dengan meningkatnya kebutuhan listrik pada saat beban puncak dan tersedianya sumber gas alam di Kalimantan Tengah maka perencanaan pembangunan pembangkit bahan bakar gas harus dilakukan sejalan dengan program pemerintah dalam melakukan diversifikasi energi dari bahan bakar diesel menjadi bahan bakar gas. Tesis ini bertujuan untuk menentukan konfigurasi terbaik yang dapat digunakan terhadap variasi pembebanan listrik dan menurunkan biaya pokok produksi di wilayah Kalimantan Tengah dengan melakukan perencanaan konfigurasi pembangkit dengan pembebanan yang bervariasi pada saat pembebanan base load dan peak load, pembangkit yang akan digunakan adalah pembangkit jenis Gas Turbin dan Gas Engine. Dengan konfigurasi pembangkit base Load sebesar 40 MW dan peak Load 300 MW dan total biaya pokok produksi mencapai 1.313,26 Rp/kWh dimana nilai tersebut masih dibawah biaya pembangkitan rata-rata PLN untuk PLTD mencapai 2,300 Rp/kWh dan PLTG mencapai 3,306,22 Rp/kWh serta masih di bawah BPP Kalselteng sebesar 1,655 Rp/kWh dan Kaltim sebesar 1,357 Rp/kWh.

ABSTRACT
Electricity is a primary energy source for the community, with the economic development of a Region, the electric energy growth will increase. In line with the electricity growth, it is necessary to construct power generation and electricity transmission with well development and planned. Central Kalimantan is one of the Indonesian region which has abundant natural gas resources, although the electricity condition of Kalimantan Region Could be categorized as deficit of electricity, and there are many Power Plants in Central Kalimantan region that still using diesel as a primary fuel. With the increasing demand for electricity during peak loads and the availability of natural gas in Central Kalimantan, planning for Power Plant construction using gas as fuel in line with the government program for energy diversify replace diesel fuel into gas fuel. This thesis aims to analysis best power plant configuration for variable power demand and to lower the Power Plants production cost in the region of Central Kalimantan by utilizing the natural gas resources in Central Kalimantan to meet the electricity needs at the time of base load and peak load condition, to utilize the limited resources of gas fuel, Power Plant configuration that used in this study is Gas Turbines and Gas Engine type. The best configuration to supply the electricity demand at 40 MW for baseload and at 300 MW for peak load, Total cost of production reached 1.313.26 Rp kWh this cost is still below the cost of generating PLN for PLTD that reached 2,300 Rp kWh and PLTG that reached 3,306,22 Rp kWh and levelized electricity generating cost for PLTGU still below cost electricity of Kalselteng at 1,655 Rp kWh and Kaltim at 1,357 Rp kWh."
2017
T47655
UI - Tesis Membership  Universitas Indonesia Library