Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 35722 dokumen yang sesuai dengan query
cover
Yudi Rizka
Depok: Fakultas Teknik Universitas Indonesia, 1991
S35892
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fakultas Teknik Universitas Indonesia, 1994
S36463
UI - Skripsi Membership  Universitas Indonesia Library
cover
Lumbanraja, Yannet Natoho
"Target yang ingin dicapai dalam pembangunan suatu proyek konstruksi adalah tepat waktu, sesuai dengan anggaran dan menghasilkan "performance" yang diinginkan. Oleh karena itu, diperlukan adanya pengendalian terhadap perencanaan selama proses konstruksi. Pengendalian yang dimaksud di sini adalah pengendalian biaya. Tujuan dari pengendalian biaya ini adalah untuk menekan pengeluaran yang mungkin terjadi seoptimal mungkin sehingga dicapai suatu efisiensi dalam penerapannya. Tetapi tetap memperhatikan waktu pelaksanaan dan "performance" nya. Secara garis besar kegiatan pengendalian biaya ini meliputi: "cost reduction" dan "cost reporting".
Pembahasan pengendalian biaya ini dibatasi pada "cost reporting", yang meliputi: pengumpulan data-data biaya dan pembuatan laporan perbandingan antara biaya aktual dengan biaya yang direncanakan. Metoda yang akan digunakan dalam pengendalian biaya adalah metoda C/SCSC, yang mengintegrasikan "schedule" proyek dan data-data biaya proyek.
Kecepatan, keakuratan dan kemudahan akses untuk memproses dan mendapatkan data-data biaya merupakan suatu hal yang sangat penting. Karena dapat digunakan untuk melakukan prediksi dan estimasi terhadap kecendemngan biaya di lapangan, sehingga bisa dilakukan suatu tindakan pencegahan atau preventif oleh tim manajemen proyek. Dengan adanya suatu sistem informasi yang berbasiskan komputer maka kegiatan-kegiatan tersebut dapat dicapai dan kesalahan-kesalahan dalam estimasi biaya maupun miscommunication dapat diperkecil.
Tujuan dari penelitian ini adalah merancang suatu sistem informasi berbasiskan komputer yang mengintegrasikan data-data biaya, baik data-data perencanaan maupun data-data aktual, dengan schedule proyek, untuk dapat menunjang kegiatan pengendalian biaya oleh tim manajemen proyek.
Penelitian ini menerapkan suatu studi kasus, dengan sampel yang digunakan adalah proyek pembangunan Asrama Mahasiswa Universitas Indonesia. Oleh karena itu, rancangan sistem yang di bangun mengacu pada proyek tersebut."
Depok: Fakultas Teknik Universitas Indonesia, 2000
S34884
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rudy Gunawan
"Saat ini, banyak perusahaan yang memandang pemeliharaan sebagai fungsi terakhir yang dapat dikontrol dimana mereka mempunyai pe|uang untuk menurunkan biaya produksi. Karena itu. banyak prusahaan saat ini berusaha menerapkan strategi dan taktik pemeliharaan seperti TPM (Totai Productive Maintenance), RCM (Reliability Centered Maintenance), Predictive Maintenance dan CMMS (Computerized Maintenance Management System) untuk menekan biaya pemeliharaan.
Jika strategi dan taktik yang disebutkan di atas ingin diterapkan secara sukses, maka pemeliharaan tidak dapat dipandang sebagai sebuah sumber biaya yang sederhana tetapi harus dilihat sebagai sebuah investasi.
Dalam perkembangannya saat ini, CMMS Iebih berkembang dan banyak diminati oieh perusahaan dibandingkan strategi dan taktik yang lain. Maka pada skripsi ini penuiis berusaha untuk membuat sebuah Sistem |nfom'|asi Manajemen Pemeliharaan yang merupakan sebuah CMMS untuk perusahaan dengan skaia menengah ke bawah.
Sebuah CMMS adalah sebuah program perangkat Iunak komputer yang dikembangkan untuk membantu dalam perancanaan, manajemen dan prosedur administritif yang dibutuhkan untuk menciptakan fasilitas pemeliharaan yang efektif. CMMS juga berarti sebuah cara untuk membagi informasi secara efektif diantara pekerja dan manajemen, dan bagian pemeliharaan dan bagian operasi."
Depok: Fakultas Teknik Universitas Indonesia, 1997
S36848
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dinik Fitri Rahajeng Pangestuti
"ABSTRAK
Perkembangan teknologi informasi dan bisnis yang pesat dalam era
globalisasi menyadarkan perusahaan untuk menempatkan informasi sebagai
kebutuhan yang utama. Sistem informasi yang baik akan membantu para pembuat
keputusan untuk melakukan tugasnya dengan lebih cepat, tepat dan akurat. Sistem
Informasi Akuntansi yang baik juga dapat mengatur penggunaan sumber daya
ekonomi yang dimiliki perusahaan secara lebih efisien dan efektif.
Dalam industri manufaktur pilihan metode costing yang digunakan sangat
beragam. ABC System merupakan salah satu alternatif penghitungan costing yang
relatif sesuai untuk industri manufaktur yang memiliki diversitas produk yang relatif
tinggi. Namun penerapan ABC System dalam industri manufaktur menimbulkan
kerumitan sehingga membutuhkan sebuah alat bantu unruk mendukung keputusan
tersebut. Perancangan sistem informasi produksi akan dapat memberikan solusi
terhadap masalah tersebut. Metodologi yang digunakan dalam perancangan sistem
informasi produksi dalam karya akhir ini aclalah FAST (Framework for the
Application of System Thinking).
Dengan perancangan sistem informasi produksi, utamanya akan menghasilkan
informasi harga pokok produksi (Cost of Goods Manufactured) dengan pendekatan
ABC System serta informasi penting Iainnya yang memiliki nilai tambah sehingga
akan membantu perusahaan dalam membuat berbagai keputusan dan memberikan
layanan lebih optimal kepada konsumen.

Abstract
Rapid development of information technology and business realizes
companies to put information as the major need. A good information system will help
decision maker to run their duties faster, more quickly and more accurately. A good
accounting information system can be used also to arrange the using of economical
resources had by companies to be more efficient and effective.
In manufacture industries when costing methods has many varieties. ABC
system is one of costing calculation alternatives which is relatively proper for
manufacture industries having a relatively high diversity of products. Thus, to
implement ABC system in manufacture industries bring saturation thus it needs a tool
to support the decision. Designing of production infomation system will bring
solution to the problem. This thesis use FAST (Framework for the Application of
System Thinking) methodology to design production information system.
By designing production information system will give information of cost of
goods manufactured with ABC System approach and another important thing to help
in the making decision and give the optimal serving to customer."
2010
T28246
UI - Tesis Open  Universitas Indonesia Library
cover
Novyaldi
"Sebuah proyek merupakan rangkaian berupa kegiatan yang saling berhubungan dan masing-masing memiliki tingkat kompleksibilitas yang cukup tinggi. Seringkali dalam pelaksanaan proyek tersebut tidak sesuai dengan rencana sehingga timbul penyimpangan. Penyebabnya antara lain karena kurangnya koordinasi dalam tim proyek dan munculnya kendala-kendala teknis di luar dugaan serta kesalahan dalam perencanaan. Biaya peralatan yang memiliki kontribusi cukup besar terhadap total biaya proyek dapat menjadi sumber penyimpangan apabila proses manajemen peralatan tidak diatur dengan baik. Penyipangan yang terjadi harus dikendalikan agar sasaran proyek dapat tercapai. Dalam proses pengendalian, tindakan koresi merupakan tahapan yang cukup penting. Untuk menghasilkan tindakan koreksi diperlukan analisa ribuan informasi dan data yang berkaitan dengan penyimpangan yang terjadi. Masalah selanjutnya adalah lambatnya proses pengambilan keputusan dalam analisa data-data tersebut oleh manusia. Kualitas data yang dihasilkan juga tidak akan akurat akibat adanya kemungkinan kesalahan manusia (human error). Perancangan sistem informasi manajemen dengan dengan bantuan komputer muncul untuk menjawab semua permasalahan tersebut. Penggunaan Microsoft Access 2000 sebagai sofware untuk membuat program penawaran kecepatan dalam proses analisa dan mampu memberikan informasi yang akurat sehingga dapat digunakan dalam pertimbangan pengambilan keputusan. Dalam proyek konstruksi gedung bertingkat tinggi di wilayah Jabotabek terdapat 52 jenis dampak penyimpangan yang teridentifikasi dari tahap pengukuran terhadap 5 indikator biaya peralatan, yaitu biaya kepemilikan, biaya operasional, biaya perbaikan, biaya pemeliharaan, dan biaya pengelolaan. Evaluasi dan analisa dilakukan terhadap penyebab dari masing-masing dampak penyimpangan yang jumlah bervariasi antara 3 - 5 faktor penyabab. Untuk mengendalikan penyebab penyimpangan tersebut, 3 - 6 tindakan koreksi direkomendasikan oleh para pakar dengan tujuan untuk mengantisipasi dan memperkecil kemungkinan munculnya penyipangan di masa yang akan datang.

A project represents activity network that have a relation each other and each owning level of high complexibility. Often time in many cases of project implementation inappropriate as planned so that makes deviation. It is cause by bad coordination in project team and many technical problems come out that unpredictable and also mistakes in the planning process. Equipment cost that owning big contribution to the project total cost can become the source deviation if equipment management process not arranging better. Deviation that happened have to be controlled to achieve the project target. In controlling phase, corrective action is most important step. In order to determine an effectively corrective action, the analyst must find all pertinent source of information and extract relevant data. The next problem is the slow action in taking a decision process that is analyzed by human being. Quality of data's output nor will be accurate as the effect of human error. A model of Management Information System (with computer help) came out to overcome all problems. Usage Microsoft Access 2000 as a basic software to make program can give some advantage like fast of data analysis and give information more accurately so that can be use as opinion to make a decision. In project of highrise building construction in JABOTABEK area, there are 52 types affect of deviation that identified from measurement phase to 5 indicator of equipment cost, include ownership cost, operational cost, maintenance cost, reparation cost and overhead cost. Evaluation and analysis is done to the cause from each deviation impact which its between 3-5 causes factor. To control it, 3 - 6 corrective action recommended by expert team to anticipate and reduce possibility of deviation appearance in the future."
Depok: Fakultas Teknik Universitas Indonesia, 2003
S35427
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ivan Septiadi
Depok: Fakultas Teknik Universitas Indonesia, 1991
S35392
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dharmoro Budiawan
Depok: Fakultas Teknik Universitas Indonesia, 1996
S36231
UI - Skripsi Membership  Universitas Indonesia Library
cover
Bob Hardian
Depok: Fakultas Teknik Universitas Indonesia, 1991
S38018
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ferdianto Munir
Depok: Fakultas Teknik Universitas Indonesia, 1994
S36488
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>