Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 19216 dokumen yang sesuai dengan query
cover
Mehta, V.K.
Ram Nagar: New Delhi: S. Chand, 1982
621.319 1 MEH p
Buku Teks  Universitas Indonesia Library
cover
"This book brings together successful stories of deployment of synchrophasor technology in managing the power grid. The authors discuss experiences with large scale deployment of Phasor Measurement Units (PMUs) in power systems across the world, enabling readers to take this technology into control center operations and develop good operational procedures to manage the grid better, with wide area visualization tools using PMU data."
Switzerland: Springer Cham, 2019
e20501174
eBooks  Universitas Indonesia Library
cover
Faridian Wahid Mardhana
"Kebutuhan energi listrik tidak dapat dipisahkan dari kehidupan sehari-hari termasuk pada sektor industri dengan kebutuhan yang terus meningkat. PT. BA merupakan perusahaan industri tambang dengan pemakaian energi listrik yang besar. Kombinasi suplai pembangkit berpengaruh terhadap tegangan pada sistem. Saat beban berlebih diperlukan pelepasan beban untuk mengembalikan kondisi tegangan supaya menjadi normal. Hasil simulasi menunjukkan jika saat semua generator beroperasi diperlukan lima kali tahapan pelepasan beban untuk mengembalikan kondisi tegangan dengan rata-rata jatuh tegangan sebesar 4,96 . Saat generator 1 tidak beroperasi, dibutuhkan lima tahap pelepasan beban dengan rata-rata jatuh tegangan sebesar 5,75 . Saat generator 2 tidak beroperasi, dibutuhkan sembilan tahap pelepasan beban dengan rata-rata jatuh tegangan sebesar 5,44 . Saat generator 3 tidak beroperasi, dibutuhkan sembilan tahap pelepasan beban dengan rata-rata jatuh tegangan sebesar 5,39.

The need of electrical energy cannot be separated from daily lives including in the industry sector with the increasing of demand. PT. BA is a mining industry company with a large consumption of electrical energy. Supply combination from power plant affects the voltage of the system. When overload occurs, load shedding is required to return voltage to normal condition. Simulation result shows that when all generators operate, five stages of load shedding is required to return voltage condition with a voltage drop average of 4.96 . When generator 1 doesn 39 t operate, five stages of load shedding is required to return voltage condition with a voltage drop average of 5.75 . When generator 2 doesn 39 t operate, nine stages of load shedding is required to return voltage condition with a voltage drop average of 5.44 . When generator 3 doesn 39 t operate, nine stages of load shedding is required to return voltage condition with a voltage drop average of 5.39."
Depok: Fakultas Teknik Universitas Indonesia, 2017
S67207
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rama Aryarakhito Wongso
"The reactive power plays an important role in almost every power transmission industry. Assessing the reactive power, its component influences the voltage stability, voltage reliability, and transient stability in the grid is important to maintain the power transmission grid. Those components are also used to improve system efficiency, maintain the system ability to stand in the standard values to avoid unwanted tragedies, such as sudden voltage drop caused by sudden decrease of reactive power or when the transmission flow does not go in line caused by overloaded current increase. Those unwanted phenomena are potentially harmful to the system.
In order to adjust the reactive power level into the needed and its components that are influenced by the reactive power values, the reactive power compensation devices are strongly needed. There are already some reactive power compensation devices in the recent industry. The performance factor, reliability, and the availability are considered in this bachelor thesis. Therefore, comparison and analysis will be conducted on the reactive power compensation devices and methodologies to determine the requirement and the placing of reactive power will be conducted. The need to control the reactive power is done by some devices, and the system is made so in such way in order to maintain its qualities, these qualities are going to be discussed mainly in this bachelor thesis.

Daya reaktif memiliki peran penting di hampir setiap industri transmisi daya. Dengan daya reaktif, nilai dari komponen tersebut dapat mempengaruhi kestabilan tegangan, keandalan dan kestabilan sementara untuk menjaga jaringan transmisi listrik. Komponen-komponen tersebut juga digunakan untuk meningkatkan efisiensi sistem, menjaga kemampuan sistem untuk tetap pada nilai standar untuk menghindari tragedi yang tidak diinginkan, seperti penurunan tegangan secara tibatiba yang disebabkan oleh penurunan daya reaktif secara spontan atau ketika aliran transmisi tidak berjalan karena kelebihan beban. Fenomena yang tidak diinginkan tersebut berpotensi membahayakan sistem.
Untuk menyesuaikan level daya reaktif dan komponennya menjadi sesuai, perangkat kompensasi daya reaktif sangat diperlukan. Sudah ada beberapa perangkat kompensasi daya reaktif yang tersedia di pasar. Faktor kinerja, kehandalan, dan ketersediaan akan dibahas di dalam skripsi ini. Oleh karena itu, perbandingan dan analisis perangkat kompensasi daya reaktif dan metodologi perlu dilakukan untuk menentukan kebutuhan dan penempatan daya reaktif. Kebutuhan untuk mengontrol daya reaktif dilakukan oleh beberapa perangkat dan membuat sistem sedemikian rupa untuk mempertahankan kualitas daya reaktif yang diinginkan. Pembahasan kualitas tersebut akan dibahas di dalam skripsi ini.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Felix Rudianto
"Seiring dengan semakin ketatnya persaingan global dan berfluktuasinya tarif tenaga listrik PLN, banyak perusahaan industri besar pelanggan PLN yang berkeinginan untuk membangun dan mengoperasikan pembangkit sendiri. Meski demikian, perusahaan industri tersebut merasa bahwa pasokan tenaga listrik PLN tetap dibutuhkan karena tidak mungkin pembangkit sendiri mereka bisa beroperasi secara terus-menerus tanpa gangguan sepanjang waktu, sehingga bermaksud melakukan interkoneksi pembangkit sendiri milik mereka dengan jaringan PLN. Penelitian ini bertujuan untuk membuat aplikasi model perhitungan biaya layanan daya listrik cadangan untuk selanjutnya diusulkan menjadi referensi bagi Pemerintah. Hasil perhitungan menggunakan aplikasi model menunjukkan bahwa pada kondisi tertentu, biaya pembangkit sendiri ditambah biaya layanan daya listrik cadangan yang lebih murah daripada tarif tenaga listrik PLN dapat diperoleh. Berdasarkan asumsi-asumsi yang digunakan pada kondisi PLN menyiapkan daya cadangan sebesar 10% dari kebutuhan, tarif layanan daya cadangan minimal sebesar Rp 9.300/kW/bulan dan tarif kWh cadangan sebesar minimal Rp 2.007/kWh

As global competition becoming more and more tighten while PLN?s tariff fluctuate monthly, some PLN?s big industrial customers are willing to construct and operate their own power plants. However, those customer realize that they still need PLN?s support because it it impossible their power plants can operate continuously and outage-free all the time, so they want to interconnect their power plants to PLN?s grid. This research?s goal is to create model application to calculate back-up electric power service charge which can be proposed as a reference to the Government. Calculation using the model application shows that in certain condition captive power plant?s cost plus back-up electric power service charge that is less than PLN?s tariff can be achieved. Based on assumptions used in condition PLN prepares back-up power at 10% of total required, back-up power service charge at minimum is Rp 9.300/kW/month and back-up energy charge at minimum is Rp 2.007/kWh.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T45585
UI - Tesis Membership  Universitas Indonesia Library
cover
Samsudiat
"Operasi sistem tenaga listrik bertegangan tinggi menuntut kestabilan parameter-parameter kelistrikan, seperti parameter tegangan, agar kinerja dari peralatan-peralatan listrik yang digunakan oleh konsumen menjadi optimal. Tetapi, karakteristik beban dan saluran transmisi dapat mengakibatkan penyerapan tambahan daya reaktif pada sistem yang menyebabkan munculnya susut tegangan yang melebihi batas operasi yang diizinkan. Salah satu metode untuk memperbaiki tegangan dengan memanfaatkan peralatan listrik yang tersedia adalah metode perubahan tap transformator tap staggering . Tap staggering adalah mengoperasikan transformator daya secara paralel dengan membedakan posisi tap yang relatif kecil. Perbedaan tap ini akan menimbulkan arus sirkulasi yang bersifat induktif dan digunakan sebagai kompensator daya reaktif untuk sistem. Sebuah jaringan distribusi dengan dua buah transformator yang beroperasi paralel dari Sistem Jawa-Bali dilakukan simulasi tap staggering dengan menggunakan analisis aliran daya pada ETAP 12.6.0. Simulasi tap staggering dilakukan dari subsistem yang memikul beban paling tinggi pada sistem. Dari hasil analisis aliran daya, diketahui bahwa tap staggering pada subsistem IBT 150/70 kV dapat melakukan perbaikan tegangan dari rata-rata tegangan 88,85 diperbaiki menjadi 93,5 . Pada subsistem trafo distribusi 70/20 kV yang memiliki perbaikan tegangan antara 88,12 sampai 92,40 meningkat menjadi 92,75 sampai 97,23 saat subsistem IBT 150/70 kV dilakukan tap staggering. Pada subsistem IBT 500/150 kV yang dilakukan tap staggering dapat meningkatkan perbaikan tegangan pada subsistem-subsistem yang dilayaninya dimana perbaikan tegangan terbaik diperoleh saat posisi tap IBT1 -8,75 , IBT3 -10 , IBT5 -10 , T1 -10 dan T3 -10 dengan rentang nilai tegangan masing-masing busnya adalah antara 97 sampai 102.

Operating high voltage power systems requires stability of electrical parameters, such as voltage parameters, so the performance of electrical utilities used by consumers can be optimal. However, the characteristics of load and transmission line can absorb additional reactive power in the system that causes drop voltage that exceeds the limit of permitted operations. One method to improve the voltage by utilizing the existing electrical equipment is tap staggering method. Tap staggering is operating power transformer in parallel with small different tap positions. Differences tap positions can provide inductive currents circulation and it rsquo s used as reactive power compensator for the system. A distribution network with two power transformer in parallel of Jawa Bali system is simulated tap staggering by using the power flow analysis on ETAP 12.6.0. Tap staggering is simulated from subsystem that connects a highest load in the system. From power flow analysis, tap staggering at 150 70 kV IBT subsystem can improve voltage from an average of 88.85 to 93.5 . In the 70 20 kV distribution transformer subsystems that have improvements voltage between 88.12 to 92.40 can increase improvements voltage becomes between 92.75 to 97.23 when subsystem IBT 150 70 kV is taken by tap staggering. At subsystem IBT 500 150 kV, tap staggering can increase the voltage on the improvement subsystems where the best voltage improvement is obtained when the tap positions IBT1 8.75 , IBT3 10 , IBT5 10 , T1 10 and T3 10 with a range of values of each bus voltage is between 97 to 102."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S66898
UI - Skripsi Membership  Universitas Indonesia Library
cover
Elgerd, Olle I.
Reading, Mass.: Addison-Wesley, 1977
621.31 ELG b
Buku Teks  Universitas Indonesia Library
cover
Gaina Sapoetra
"ABSTRAK
Mikrohidro merupakan sebuah istilah yang digunakan untuk instalasi pembangkit listrik yang memanfaatkan potensi energi air. Prinsip kerja dari pembangkit listrik ini cukup sederhana, yaitu menggerakkan turbin dengan memanfaatkan tenaga kinetik air. Air yang memanfaatkan perbedaan ketinggian (head), serta besarnya debit air. Objek Penelitian ini yaitu potensi daerah Kampung Nyomplong, Desa Curug Bitung, Kabupaten Bogor untuk dibangun Pembangkit Listrik Tenaga Mikro Hidro (PLTMH).
Studi mengenai potensi daerah ini dilatar belakangi kondisi daerah yang belum terjangkau oleh jaringan listrik pemerintah. Sumber potensialnya yaitu sebuah Sungai Cisangku yang mengalir melintasi Kampung Nyomplong. Rancangan PLTMH ini mampu menghasilkan daya hingga 5 kW, sedangkan beban warga yang pernah disurvei sebesar 2,358 kW. Jarak saluran distribusi dari pembangkit ke rumah penduduk ±200 m, dengan menggunakan kabel distribusi NFA2X. Pada proses distribusi harus dilakukan analisis tegangan jatuh, supaya sistem tetap beroperasi stabil dan sesuai standar, serta perlu direncanakan pemilihan kabel yang memiliki kekuatan fisik yang baik, sehingga ketika terjadi kenaikan atau kelipatan beban, sistem tetap mampu beroperasi dengan baik dan rugi-rugi daya akan tetap terjaga dan masih dalam batas aman.

ABSTRACT
Micro-hydro is a term used for the installation of power plants that harness the potential energy of water. The working principle of power generation is quite simple, which drives a turbine to harness the kinetic energy of water. Water which utilizes the difference in height (head), as well as the magnitude of water discharge. The research object is a potential area of Nyomplong Village, Curug Bitung village, Bogor Regency to build Micro Hydro Power (MHP).
Studies on the potential of this region against the background conditions in the area that have not been reached by the government the power grid. Potential source is Cisangku river that flowing across the Nyomplong village. The design of the MHP is capable of generating power up to 5 kW, while the load of the people who ever surveyed at 2,358 kW. Distance from the plant to the distribution channel houses ± 200 m, using NFA2X distribution cable. In the distribution process should be carried out voltage drop analysis, so that the system remains stable and appropriate operating standards, as well as the planned elections need a cable that has good physical strength, so that when there is an increase or a multiple load, the system is still able to operate properly and power loss will stay awake and still within safe limits."
Fakultas Teknik Universitas Indonesia, 2014
S54311
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rao, T.S. Madhava
New Delhi: Khanna, 1974
621.314 RAO p
Buku Teks  Universitas Indonesia Library
cover
Murty, P.S.R.
New Delhi: Tata McGraw-Hill, 1984
621.31 MUR p
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>