Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 11865 dokumen yang sesuai dengan query
cover
Carroll, Phil
New York: McGraw-Hill, 1954
658.54 CAR t
Buku Teks  Universitas Indonesia Library
cover
Carroll, Phil
New York: McGraw-Hill Book Company,INC, 1950
658.542 CAR h
Buku Teks  Universitas Indonesia Library
cover
Gillespie, Cecil
Englewood Cliffs: Prentice-Hall, 1957
657.42 GIL c
Buku Teks  Universitas Indonesia Library
cover
Stedry, Andrew C.
Englewood Cliffs, N.J.: Prentice-Hall, 1960
658.15 STE b
Buku Teks  Universitas Indonesia Library
cover
Indra Tua
"ABSTRAK
Penelitian ini berfokus pada penerapan Peraturan Pemerintah Nomor 79 Tahun 2010 PP 79/2010 khususnya Pasal 19 ayat 2 yang mengatur tentang perhitungan bagi hasil dengan mekanisme Plan of Development POD basis yang dinilai kontraproduktif ditengah lesunya minat investasi oleh investor pada industri hulu migas nasional. Dengan adanya POD basis maka gross revenue dan cost recovery dari suatu POD tidak dapat ditransfer kepada POD yang lain pada Blok yang sama. Tujuan penelitian menganalisis pengaruh penerapan perhitungan bagi hasil POD basis terhadap nilai unrecovered cost pada periode sebelum dan sesudah adanya PP 79/2010 dengan menggunakan metode regresi berganda least square. Sampel penelitian berasal dari Pertamina Hulu Energi West Madura Offshore PHE WMO sebagai satu-satunya kontraktor migas fase eksploitasi yang sudah merasakan dampak penerapan PP 79/2010. Hasil penelitian menunjukkan bahwa nilai unrecovered cost akan selalu muncul meskipun nilai gross revenue lebih besar daripada cost recovery dikarenakan adanya pensekat-sekatan perhitungan bagi hasil antara bagian pemerintah dengan kontraktor migas. Penerapan POD basis akan mengubah paradigma kontraktor migas menjadi lebih fokus untuk mendapatkan penggantian cost recovery dengan cara mengeksploitasi sebesar-besarnya cadangan migas dari POD yang sudah berproduksi saja, dengan tujuan meminimalisir timbulnya unrecovered cost. Klasifikasi JEL: H3, L5, Q0, Q3, Q4.

ABSTRACT
This study focuses on the implementation of Government Regulation No. 79 Year 2010 PP 79 2010 especially article 19 paragraph 2 that regulates the profit sharing calculation by Plan of Development POD basis mechanism, considered counterproductive at a time when investment interest is low in the national upstream oil and gas industry. With the POD basis mechanism, the gross revenue and cost recovery from one POD can not be transferred to another POD on the same Block. The aim of the study is to analyze the effect of profit sharing calculation by POD basis mechanism toward unrecovered cost in the period before and after PP 79 2010 using least square regression method. The source data is from Pertamina Hulu Energi West Madura Offshore PHE WMO as the only oil and gas exploitation contractor who implementing PP 79 2010 until 2016. The results of the study show that the value of unrecovered cost will always appear even if gross revenue is greater than cost recovery due to the isolating of profit sharing calculation between the government and contractors. The implementation of POD basis mechanism will change the contractor paradigm to be more focused to get cost recovery replacement by exploiting as much as possible oil and gas reserves from POD that already produced, with the aim of minimizing the incidence of unrecovered cost. JEL classification H3, L5, Q0, Q3, Q4"
2018
T49765
UI - Tesis Membership  Universitas Indonesia Library
cover
Firman Hidayat
"Penurunan penjualan sepeda motor yang terjadi sejak kenaikan BBM akhir tahun 2005 yang lalu menyebabkan PT. XYZ khususnya Direktorat Produksi, Engineering & Procurement mengeluarkan kebijakan Cost Reduction Program (CRP) untuk semua bidang yang berapa di bawah naungannya. Salah satunya adalah Divisi PPC yang bertugas untuk menjalankan proses perencanaan dan pengendalian produksi, termasuk yang melaksanakan proses pemesanan dan pengendalian terhadap persediaanpartlmateriallbarang di PT XYZ Divisi PPC mengeluarkan kebijakan dan rencana kerja untuk menurunkan level stok menjadi 0.6 - 1 shift per hari dari yang sebelumnya minimal 1 shift per hari dengan tujuan untuk menekan biaya pengendalian persediaan (inventory control). Pelaksanaan activity plan tersebut membutuhkan perhitungan level stok dan jumlah order yang optimal, sehingga jalannya proses produksi tidak terganggu karena tidak adanya partlmateriallbarang. Selain itu, masih perlu dibuktikan bahwa kebijakan dan rencana kerja menurunkan level stok menjadi minimal 0.6 shift per hari yang ditetapkan oleh Divisi PPC sudah optimal, serta berapa efisiensi biaya yang dapat dilakukan.
Tujuan karva akhir ini adalah untuk melakukan optimalisasi sistem pengendalian persediaan untuk mendukung kebijakan tersebut di atas, dengan cara rneramalkan jumlah permintaan selama April - Juni 2006, menghitung jumlah order part dan level stok (safety stock) yang optimal, diikuti dengan perhitungan kapan order tersebut dilakukan, dan biaya yang hams dikeluarkan perusahaan untuk proses pengendalian persediaan tersebut. Selanjutnya hasil perhitungan tersebut dibandingkan dengan jumlah order part, level stok (safely stock) dan total biaya yang dikeluarkan perusahaan, yang dihitung dengan menggunakan metode yang digunakan saat ini, untuk mendapatkan total biaya yang lebih efisien.
Peramalan Permintaan dilakukan dengan menggunakan metode Focus Forecasting. Hasil peramalan tersebut adalah dalam periode April - Rini 2006, akan timbul permintaan sepeda motor tipe cub (bebek) 100 cc sebesar 365,450 unit.
Part yang akan dianalisa adalah 6 buah parr dimana masing - masing part mewakili kebijakan perusahaan mengenai kriteria part yang harus dikendalikan lebih serius lagi. Keenam part tersebut adalah ('over R Crank Caw, Motor Assembly Starter, Shaft Assy Counter, Clutch Assy, Drum Assy, Gear Shift, dan Outer Assy Primary Clutch. Permintaan untuk masing-masing part mengikuti standar using dari masing-masing part pada unit sepeda motor.
Setelah jumlah permintaan diketahui, maka jumlah order dapat dihitung dengan menggunakan metode Economic Order Quantity (EGO. Hasil dari perhitungan menunjukkan jumlah order yang lebih besar untuk sekali order, namun dengan lead time yang lebih lama jika dibandingkan dengan metode yang digunakan saat ini. Hal tersebut menyebabkan meningkatnya annually holding cost, namun menurunkan annually ordering cost. Secara keseluruhan, penggunaan metode Economic Order Quantity (E0Q) dapat menurunkan total cost annually yang dikeluarkan perusahaan sebesar Rp.278.750. 985,-.
Selain itu, basil perhitungan jumlah safety stock menjadi lebih kecil. Sehingga menyebabkan kebijakan dan rencana kerja Divisi PPC untuk menerapkan CRP dengan menurunkan level stok menjadi minimal 0.6 shift per hari masih dapat diminimalkan lagi, menjadi kurang dari 0.5 shut per hari.
Penerapan metode EOQ juga akan memberikan kepuasan bagi semua pihak. Antara lain bagu pelanggan internal dengan berkurangnya part yang rusak akibat terlalu lama disimpan, dan pelanggan eksternal dengan waktu inden yang tidak begitu lama. Disamping itu, para supplier subcontractor juga diuntungkan dengan berkurangnya biaya yang harus mereka keluarkan akibat penggunaan armada transportasi yang lebih sedikit.

The decrease of motorcycle sales which occurred since the increase of fuel at the end of year 2005 caused the PT. XYZ especially the Directorate of Production, Engineering and Procurement to release a Cost Reduction Program (CRP) to every division under the Directorate. One of the divisions is PPC Division which duty is to process the planning and control or production including processing the procurement and control of the part/material/commodity supplies.
The PPC Division releases a policy and work plan to decrease the stock level from the minimal l shift per-day to 0.6 - 1 shift per-day which objective is to keep the expense of inventory control down. To avoid the disturbance of production process due to the limitation of part/material/commodity supplies, the implementation of activity plan requires the optimize calculation of stock level and total amount of demand. Moreover, the efficiency budget and optimize of the policy and work plan of the PPC Division to decrease the stock level to 0.6 shift per-day is still requires proven.
The objective of this thesis is to optimize the inventory control system to support the policy mentioned above by forecasting the amount of order during April - June 2006. Calculate the amount of part order and optimize the stock level (safety stock) which is followed by the calculation of when the order shall be done and how much is the cost that shall be paid by the company for the process of the inventory control. Furthermore, the result of the calculation will be compared with the total amount of part order, stock level (safety stock) and the total cost paid by the company, which is calculated using the present method to get more efficient of total cost.
The forecasting of order is using the method of Focus Forecasting. The result of those forecasting during April - June 2006 is that there will be an order arises for the 100 cc cub type of motorcycle for about 365,450 units. -
The Part that will be analyzed is 6 units of part where each part is represent the company policy about the criteria of part which has to be more seriously controlled. Those six parts are Cover R Crank Case, Motor Assembly Starter, Shaft Assy Counter, Clutch Assy, Drum Assy, Gear Shift, and Outer Assy Primary Clutch. The order for each part follows the using standard from each part of motorcycle unit.
After the amount of order has known, the total amount of order can be calculated using the method of Economic Order of Quantity (EOQ). The result from the calculation shows that the total order is higher for one order, but with the longer lead time compared with the present method used. It increased the annually holding cost but decreased the annually ordering cost. In general, the use of Economic Order Quantity (EOQ) method can decrease the total cost annually paid by the company of about Rp.278.750.985,-. Furthermore, the result form the calculation of safety stock became smaller. Therefore, the policy and work plan of the PPC Division using the CRP to decrease the stock level to 0.6 shill per-day can be minimized again to 0.5 shift per-days.
The applied of EOQ method is also give satisfaction to all parties, such as internal customer by decreasing the damaged part caused by the long storage, and external customer with the shorter pre-order time. Moreover, it also gives an advantage to suppliers/sub-contractors by the decreasing cost for the use of less transportation.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2006
T19775
UI - Tesis Membership  Universitas Indonesia Library
cover
Teguh Husadani
"Pada perusahaan industri kemasan dengan sistem job-order sepeni PT. Z, kesesuaian antara estimasi harga pcnjualan dengan biaya aktual dari produksi suatu order diperlulcan agar dapat mencapai target laba. .Iika estimasi harga penjualan tidak sesuai dengan biaya aktualnya, maka margin yang diperoleh akan dapal lebih besar atau lebih kecil dari standar yang ditetapkan perusahaan.
Setelah dilakukan analisis, diketahui bahwa margin yang diperoleh sebagian besr melebihi standamya. Hal ini akan menyebabkan harga menjadi jauh lebih tinggi daripada biaya aktualnya. Penyebabnya adalah:
1. tingginya perscntase harga pokok produksi bahan aktual karena wasre produksi aktual yang melebihi standar waste, kcnaikan kurs dollar terhadap rupiah, dan kenailcan harga bahan baku di pasaran internasional,
2. perbedaan struktur biaya antara estimasi harga penjualan dan biaya aktualnya,
3. perbedaan basis biaya overhead antara estimasi harga dengan biaya aktual.
Oleh karena harga pokok produksi yang tinggi di atas di sebabkan oleh faktor-faktor makro dan probabilislik, maka solusi perbaikannya difokuskan kepada perancangan ulang rnetode perhitungan estimasi harga untuk menyesuaikan struktur biaya dan basis biaya overhead dengan biaya aktual. I-lasilnya, karena lebih sesuai dengan biaya aklual, metode ini dapat menurunkan margin yang lebih tinggi dari standar marginnya."
Depok: Fakultas Teknik Universitas Indonesia, 2003
S50136
UI - Skripsi Membership  Universitas Indonesia Library
cover
Siregar, Sarmawadi
"Perhitungan dan analisis biaya kualitas merupakan tahapan awal dalam manajemen kualitas. Biaya kualitas mencakup seluruh biaya yang berkenaan dengan kegiatan pengendalian kualitas, perencanaan sistem kualitas, pencegahan, dan perbaikan ketidaksesuaian produk dengan spesifikasi dan karakteristik kualitas yang telah ditetapkan. Hasil perhitungan biaya kualitas dapat digunakan sebagai informasi awal untuk mengidentifikasi peluang peningkatan kualitas produk dan proses. Melalui perhitungan biaya kualitas tersebut, perusahaan juga diharapkan dapat mengetahui biaya potensial yang dapat diselamatkan, yang pada akhimya nanti dapat memberikan kontribusi terhadap peningkatan marjin keuntungan perusahaan.
Perhitungan biaya kualitas pada fine trimning final assy project Pick-Up PT X diawali dengan mengidentifikasi aktivitas produksi dan pendukung produksi fine trimning yang tergolong ke dalam elemen biaya kualitas. Biaya kualitas untuk periode tertentu merupakan akumulasi dari biaya pencegahan, biaya penilaian dan biaya kegagalan fine trimning yang terjadi pada periode tersebut. Hasil perhitungan untuk periode januari-April 2005 menunjukkan proporsi terbesar biaya kualitas pada fine rrinmring PT X berada dalam bentuk biaya pencegahan yaitu sebesar 76%, diikuti biaya penilaian sebesar 21%, sedangkan kategori biaya kegagalan memiliki persentase terkecil, yaitu sebesar 3% dari total biaya kualitas. Potensi penurunan biaya kualitas terdapat pada kategori biaya kegagalan. Suatu usulan teknis dikemukakan untuk menurunkan angka biaya kegagalan tersebut."
Depok: Fakultas Teknik Universitas Indonesia, 2005
S50213
UI - Skripsi Membership  Universitas Indonesia Library
cover
Eko Purwanto
"ABSTRAK
Penelitian ini bertujuan menganalisis tingkat efisiensi relatif dari 31 Unit
Pelaksana Teknis Badan Pengawas Obat dan Makanan (UPT BPOM) tahun 2013
dan 2014 dengan menggunakan metode Data Envelopment Analysis (DEA).
Pemilihan metode DEA dikarenakan kelebihannya mengolah lebih dari satu input dan output. Input terdiri dari 3 variabel, yaitu jumlah pegawai, jumlah peralatan laboratorium, dan jumlah anggaran. Output terdiri dari 8 variabel, yaitu jumlah sarana produksi dan distribusi obat dan makanan yang diperiksa, jumlah sampel produk obat dan makanan yang diuji, jumlah iklan yang diawasi, jumlah kasus, jumlah pengaduan, jumlah sertifikasi, jumlah Sekolah Dasar yang diintervensi, jumlah komunikasi, edukasi dan informasi. Hasil perhitungan dengan pendekatan output menunjukkan pada tahun 2013 secara teknis terdapat 24 efisien dan 7 UPT BPOM tidak efisien. Sedangkan tahun 2014, secara teknis terdapat 23 yang efisien dan 8 UPT BPOM yang tidak efisien. Bagi UPT BPOM yang belum efisien secara teknis dapat diperbaiki nilai efisiensinya dengan meningkatkan output berdasarkan hasil perhitungan DEA.

ABSTRACT
This research is to analyze the relative efficiency level of 31 Technical
Operational Unit The Nasional Agency of Drug and Food Control (UPT BPOM)
in 2013 and 2014 using Data Envelopment Analysis (DEA). DEA chosen is
because is abble to handle more input and output. Inputs use 3 variable are
numbers of employees, numbers of laboratory equipment, and budget. Outputs use 8 variable is numbers of site production and distribution drug and food, numbers of sample product drug dan food tested, numbers of advertisement supervised, , numbers of case, numbers of complaint and quetions, numbers of sertification, numbers of primary school intervention and nuber of communication, education and information. The results using output oriented showed in 2013, 24 classified as technically efficient and 7 classified as technically inefficient. In 2014, 23 classified as technically efficient and 8
classified as technically inefficient. For UPT BPOM which are tehcnically inefficient, is necessary to repair the efficiency with improve output variabel
based on DEA.
"
2016
T46053
UI - Tesis Membership  Universitas Indonesia Library
cover
Horngren, Charles T., 1926-
Englewood Cliffs: Prentice-Hall, 1967
657.15 HOR c
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>