Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 9135 dokumen yang sesuai dengan query
cover
Ogdin, Carol Anne
Englewood Cliffs, NJ: Prentice-Hall, 1978
621.381 9 OGD m
Buku Teks  Universitas Indonesia Library
cover
Kraft, George D.
London: Prentice-Hall, 1981
005.6 KRA m
Buku Teks  Universitas Indonesia Library
cover
Kraft, George D.
Englewood Cliffs, N.J.: Prentice-Hall, 1979
621.381 KRA m
Buku Teks  Universitas Indonesia Library
cover
Hope, G.S.
New York: Wiley , 1981
621.381 HOP i (1)
Buku Teks  Universitas Indonesia Library
cover
cover
Adams, Charles K.
Blue Ridge Summit: Tab Books, 1980
621.381 9 ADA h
Buku Teks  Universitas Indonesia Library
cover
Tompkins, Willis J.
Englewood Cliffs, NJ: Prentice-Hall, 1981
681.761 TOM d
Buku Teks  Universitas Indonesia Library
cover
Paterson, John
London: John Wiley & Sons, 1977
658.89 PAT i
Buku Teks  Universitas Indonesia Library
cover
Owen, Julian
"This book, written by an experienced self build architect provides practical, step-by-step advice and guidance on how to build your own high quality, stylish home. Aimed at those who aspire to live in a tailor-made home that expresses their own style because existing houses for sale are either too dull or expensive, but who are daunted by the prospect. It dispels the myth that self-built houses either require you to get your hands dirty or result in little more than brick boxes."
London: [RIBA , ], 2004
e20440282
eBooks  Universitas Indonesia Library
cover
Irawan Saptoargo
"The Impact of Contractor's Role in Improving the Constructability of the Design-Construct ProjectIn 1982 The Business Roundtable's Construction Industry Cost Effectiveness (LICE) identify one important aspect is that construction too often is relegated to operate as production function separated from financial planning, scheduling, and engineering or architectural design. The involvement of construction experts is delayed until the design is so far along that changes would be so disruptive as to increase cost. The traditional construction contracting method made this division even further. The construction contractor would only be engaged in the project after the designer completed their design.
By separate design and construction, opportunities to reduce project costs and schedules by using existing and new construction technology are lost. Significant savings in both the costs and time required to complete the project can be accrued from integration of construction expertise into all phases of project. The Construction Industry Institute's (CII) Task Force defines this term as Constructability, which is the optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives.
This thesis study the role of contractor's in improving the constructability of the design-construct project which leads to an improving project cost performance of construction project in Indonesia. A questionnaire survey was distributed to projects contractor's in Jakarta area. The data obtained was analyzed quantitatively to find the correlation and to make a regression between the role contractor's in improving the constructability of the design-construct project and the performance of construction project's cost.
The result of this research show a positive, linear correlation between the interface of contractor's in improving the constructability of the design-construct and cost performance of the project. The main variables are: pro-actively involved in developing project plans and plan the sequence of field task to improve productivity.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T8981
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>