Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 45180 dokumen yang sesuai dengan query
cover
Christianto Wibisono
Jakarta : Yayasan Management Informasi, 1990
080 CHR a
Buku Teks SO  Universitas Indonesia Library
cover
Darminto M. Sudarmono
Jakarta: Kompas, 2004
808.7 DAR a (1)
Buku Teks SO  Universitas Indonesia Library
cover
Oka A. Yoeti
Bandung: Angkasa, 1996
338.470 0 OKA a
Buku Teks  Universitas Indonesia Library
cover
"Korupsi politik adalah perilaku elit politik dan birokrasi pemerintahan yang menyalahgunakan wewenang dan kekuasaan mereka. Banyak dari mereka untuk melakukannya untuk mencari dari keuntungan pribadi. ia elit politik dan birokrasi dari pejabat pemerintah yang rusak dapat dikategorikan sebagai kejahatan negara..."
JIP 39 (2012)
Artikel Jurnal  Universitas Indonesia Library
cover
R. Fadhil Danahiswara Prasidya
"Skripsi ini membahas tentang seleksi vendor di Exxon Mobil, awalnya kriteria seleksi hanya berdasar pada harga penawaran, dan peneliti merasa bahwa ini kurang objektif dalam memilih vendor. Peneliti melakukan diskusi terarah dengan pihak ExxonMobil untuk menentukan kriteria apa saja yang dapat dijadikan acuan untuk memilih vendor dan dihasilkan lima kriteria dan sepuluh sub-kriteria lalu ditentukanlah bobotnya dengan pendekatan AHP. Penilaian vendor dilakukan dengan skoring berdasarkan data performansi historis. Vendor yang mendapatkan nilai paling besar adalah yang menjadi pemenang, dalam penelitian ini dikhususkan pada pengadaan barang kimia. Diharapkan supplier yang terpilih merupakan supplier yang paling berkompeten dan mampu mendukung kelancaran kegiatan operasional perusahaan. Pada penelitian ini juga terdapat implikasi manajerial serta saran untuk penelitian selanjutnya.

This paper discusses the selection of vendors in Exxon Mobil, the selection criteria initially just based on the offer price, and researchers feel that this is less objective in selecting a vendor. Researchers focused discussions with Exxon Mobil to determine what criteria can be used as a reference for selecting vendors and produced five criteria and sub-criteria last ten weight was determined with AHP approach. Vendor assessment is done by scoring based on data from historical performance. Vendors who receive the greatest value is that the winner, in this study is devoted to the procurement of chemical goods. It is hoped that the selected supplier is a supplier of the most competent and capable of supporting the smooth operations of the company. In this study, there is also a managerial implications and suggestions for further
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2015
S60259
UI - Skripsi Membership  Universitas Indonesia Library
cover
Cardiyan, H.I.S.
Jakarta: Sulaksana Watinsa Indonesia , 1991
371.8 CAR i
Buku Teks  Universitas Indonesia Library
cover
Tanri Abeng
Singapore : Times Academic Press, 2001
338.092 TAN t
Buku Teks SO  Universitas Indonesia Library
cover
Muhammad Anugrah
"Pada studi ini dilakukan suatu peninjauan kembali suatu prosedur perencanaan casing yang dilakukan pada salah satu sumur minyak/gas yang dimiliki oleh ConocoPhillips Indonesia Inc. Ltd. Perusahaan minyak dan gas umumnya selalu menggunakan casing dari grade yang tinggi untuk sumur-sumur yang dibor. Terdapat setidaknya tiga alasan utama mengapa selalu digunakan casing high grade untuk sumur-sumurnya antara lain adalah untuk menyederhanakan proses procurement (pembelian), untuk memaksimalkan aspek keamanan pada sumur-sumur yang dibor dan untuk menyederhanakan proses pada operasi pada pengeboran lepas pantai.
Dampak terbesar dari digunakannya casing high grade ini adalah meningkatnya biaya untuk mengebor suatu sumur. Fungsi engineering diperlukan agar system casing yang digunakan tetap dalam safety factor yang sesuai dengan kebijakan keselamatan dari Migas dan dari perusahaan serta telah melalui proses kalkulasi yang optimal sehingga biaya yang dikeluarkan untuk sistem casing yang diaplikasikan tidak eksesif.
Disain casing secara garis besar dipengaruhi oleh beberapa faktor antara lain: karakteristik batuan/formasi reservoir hidrokarbon yang dibor (tekanan pori dan tekanan rekah), mechanical properties dari casing itu sendiri (resistansi burst dan collapse serta pembebanan yang dialami oleh casing itu sendiri), dan kondisi/karakteristik lingkungan dari sumur (offshore dan onshore), serta kebijakan perusahaan dan Migas. Umumnya kebijakan perusahaan telah memiliki standar keselamatan yang lebih tinggi dari kebijakan Migas. Secara garis besar, terdapat 3 langkah proses optimasi yang dilakukan di sini sebagai berikut: review jumlah casing point menjadi minimum untuk mendapatkan jumlah wellbore section yang optimum; pemilihan grade casing berdasarkan beban burst, collapse, tension dan biaxial/triaxial; serta konsiderasi pengaruh dari environmental loads dan pengaruhnya terhadap pemilihan grade casing.
Keluaran dari hasil studi ini adalah suatu disain casing pada suatu proyek pengeboran sumur minyak, terutama pengeboran yang dilakukan di laut dalam lepas pantai, baik itu adalah pengeboran satu sumur (single well drilling) maupun yang bersifat batch drilling, yang bersifat optimal, baik dari segi engineering, safety maupun biaya. Manfaat dari studi ini bagi penulis adalah sebagai sarana untuk mengembangkan diri dan memperluas wawasan dan pengetahuan, terutama yang berhubungan dengan perminyakan, struktural/civil engineering dan tentu saja aspek-aspek mekanikal dari sistem casing yang dirancang. Bagi pembaca, diharapkan studi ini dapat bermanfaat dalam memberikan wawasan yang lebih luas mengenai suatu disain casing dan tinjauannya secara komprehensif dari berbagai bidang ilmu terutama perminyakan, civil engineering dan juga perspektif mekanikal. Dan bagi masyarakat umum secara luas, studi ini diharapkan dapat memberikan kontribusi maksimal dalam proses pemanfaatan sumber daya alam yang dieksploitasi terutama sumber daya alam hidrokarbon (minyak dan gas).

This study, conceptually reviewed a procedure of a casing disain that was done at one of oil/gas well that owned by ConocoPhillips Indonesia Inc. Ltd. Oil companies, at general practice always utilize casing that has high grade for their wells. There are at least three reasons why the high grade casings are often utilized in its wells: first is to simplify the procurement process, second is to maximize the safety aspect for the drilled wells and third is to simplify the operation process, especially for offshore wells.
The biggest effect from utilization of this high grade casing is the increased cost to drill a well. The engineering function is needed in order to engineer the casing system so that the system still within the safety factor with accordance to the government (Migas) policy and also company policy. This engineering process has been through an optimal calculation process so that the running cost spent for the applied casing system will not be excessive.
Casing design mainly is affected by factors such as: the characteristic of the rocks/formation from a hydrocarbon reservoir that will be drilled (pore pressure and frac pressure), casing?s mechanical properties (burst and collapse resistance and the loads that experienced by the casing) and the environmental loads and condition (offshore and onshore), and also the government and company policy. In general practice, company will has higher standard of safety. Basically, there are 3 steps of optimization, as follows: review the casing points into minimum in order to have optimum wellbore sections; casing grade selection based on burst load, collapse, tension and biaxial/triaxial; and also consideration of the effect of environmental loads and its effect to the casing grade selection.
Output from this study is a casing design at a particular oil-well drilling project, especially offshore, for single well or batch drilling, that fully optimized from engineering, safety and economy perspective. The main benefit from this study for the writer is the tool for self development and enrich the writer?s knowledge, especially the knowledge related to petroleum, structural/civil engineering and the mechanical aspects of the casing the already designed. For the readers, it is expected that this study will give wider knowledge related with casing design and its view comprehensively from various perspective especially petroleum engineering, civil/structural engineering and also mechanical engineering. And for the community and society in general, it is expected that this study will give maximum contribution in the process of natural resources utilization that was exploited, especially natural resources of hydrocarbon (oil and gas).
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S50735
UI - Skripsi Open  Universitas Indonesia Library
cover
Ramonaldi
"Pada studi ini dilakukan peninjauan kembali data pengeboran untuk perbaikan disain Bottom Hole Assembly dan prosedur pemboran pada salah satu sumur yang dimiliki oleh ConocoPhillips Indonesia Inc. Ltd. Proses pengeboran minyak dan gas memerlukan perencanaan yang baik dan banyak proses saling berhubungan untuk menjadikannya operasi yang mencapai tujuan yang diinginkan. Bottom hole assembly (BHA) didefinisikan sebagai serangkaian kombinasi peralatan bawah permukaan yang dipasang pada rangkaian drill string sehingga diperoleh suatu kinerja yang diinginkan untuk tercapainya pemboran yang efisien dan efektif. Dengan pergerakan dan perputaran BHA dan profil sumur yang akan di bor serta panjang dari well displacement akan sangat memungkinkan ditemui masalah. Diantara banyak potensi masalah diatas kita akan memfokuskan pada vibrasi stick-slips dan efek yang ditimbulkan apabila kita tidak mengantisipasinya.
Drillstring vibration adalah suatu kondisi dimana pada saat berotasi BHA yang terdiri dari berbagai macam komponen mempunyai ketidak setimbangan dan juga terdapat ketidak centeran dan bengkokan pada pipa, pemilihan jenis bit juga akan berpengaruh dan fenomena geometrik lainnya yang menghasilkan eksitasi pada frekuensi rotasi atau multipel dari frekuensi rotasi. Pada tulisan ini dilakukan pengolahan data yang diperoleh pada saat pemboran. Metode yang dilakukan adalah melakukan perancangan ulang pada software wellplan dari Halliburton dengan parameter dan setingan dari data real time dan menganalisa hasil keluaran berupa grafik-grafik dan data lainnya yang dapat menentukan apakah pada saat kondisi nyata pemboran benar telah terjadi stickslips. Dengan data yang didapat dan hasil pengamatan data log, pada sumur ini memang telah terjadi stick-slips dan kita perlu melakukan perbaikan untuk acuan di masa datang.
Hasil analisa data yang didapat menunjukkan vibrasi yang terjadi jika ditinjau dari efek kerusakan pada pipa pemboran tidak terdapat cukup torsi yang terjadi untuk dapat membuat kerusakan pada koneksi pipa dan pipa itu sendiri. Dengan perbandingan dua sumur berdekatan kita melihat efek dari vibrasi stick-slips adalah berkurangnya Rate of Penetration yang cukup banyak sehingga nantinya akan berpengaruh pada biaya pemboran yang meningkat. Keluaran yang di harapkan dari tulisan ini adalah suatu acuan disain BHA dan atau prosedur pemboran yang dapat mereduksi potensi bahaya dari vibrasi stick-slips dan diharapkan dapat meningkatkan efisiensi drilling dari segi waktu dan biaya. Manfaat dari tulisan ini bagi penulis sendiri adalah sebagai sarana pembelajaran dan pengembangan ilmu pengetahuan dalam dunia perminyakan pada umumnya dan drilling khususnya. Semoga tulisan ini juga memberi manfaat bagi pembaca lainnya.

This study will evaluate a set of drilling data to try to find the root cause of drilling stick-slips that we?re experienced. The data were real time data coming from the field at one of ConocoPhillips Indonesia?s well. Oil and gas drilling process required a good planning with a lot of aspects connect to each other, making it a very complicated process. The goal is to drill a well in a most efficient ways. BHA was define as a set of down- hole tool using in drilling operation that connect to drill pipe. The idea is to drill the well to a target that we have pointed, and hoping the design BHA will perform efficiently and effectively. With a combination of the tool above plus the profile of the well including the length of the well, it will have a potential to face difficulties and problems during drilling, among the problems we will focus on the stick-slips phenomena and the theconsequences if we tend to ignore it.
Drillstring vibration is a condition where during rotation a BHA that contain many tool configuration and dimension experience . Not all the tool are symmetrical, this could lead to vibration. The bit selection is also affecting BHA in terms of vibration. On this study, we are going to process a set of data from realtime and also later on we will compare two data from near by well as our methode of study. We are going to use a landmark Halliburton software called wellplan as a tool to analyze realtime data so that from the output we can make a conclution weather or not the BHA has undergo a stick-slips vibration. The out put can be in graphics or tables. In the end we are trying to find solution to the stick-slips.
The result of the software tells us that the BHA was experienced stick and slip and from the reference to our connection torque, the pipe was not torqued high enough to damage the connection. From the comparison of two data well, we make conclusion that the well that experienced stick-slips will affect its Rate of penetration quite significant where it will eventually damaged us in terms of well cost.The output that we are getting later on is the improvement on BHA design and the procedure of drilling where we are hoping it will reduce the potential of stick-slip vibration, and we will increase drilling efficiency. To me this paper not only increase my understanding on drilling vibration, but also to learn drilling operation. As a student of mechanical engineering, I get to see the connection of my study to my day to day work in oil and gas sector. In general I hope this paper will be used as an alternative to solve drilling process that also experience stick-slips.
"
Depok: Fakultas Teknik Universitas Indonesia, 2011
S45700
UI - Skripsi Open  Universitas Indonesia Library
cover
Yogyakarta: Pustaka Pelajar, 2006
959.804 KEK
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>