Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 5997 dokumen yang sesuai dengan query
cover
Amsterdam: North-Holland, 1977
519.7 STU (1)
Buku Teks SO  Universitas Indonesia Library
cover
"Many engineering, operations, and scientific applications include a mixture of discrete and continuous decision variables and nonlinear relationships involving the decision variables that have a pronounced effect on the set of feasible and optimal solutions. Mixed-integer nonlinear programming (MINLP) problems combine the numerical difficulties of handling nonlinear functions with the challenge of optimizing in the context of nonconvex functions and discrete variables. MINLP is one of the most flexible modeling paradigms available for optimization."
New York: Springer, 2012
e20419530
eBooks  Universitas Indonesia Library
cover
Shapiro, Jeremy F.
New York: John Wiley & Sons, 1979
519.7 SHA m
Buku Teks SO  Universitas Indonesia Library
cover
Bradley, Stephen P.
Reading, Mass. : Addison-Wesley, 1977
519.7 BRA a
Buku Teks SO  Universitas Indonesia Library
cover
Deby Rahma Tsabita
"Sebuah perusahaan kontraktor tambang di Kalimantan Timur ingin mengurangi biaya transportasi yang dikeluarkan, salah satunya adalah biaya pengantaran karyawan ke lokasi tambang menggunakan bus. Penggunaan bus untuk pengantaran karyawan digunakan untuk aspek keselamatan mengingat kondisi jalan tambang yang tidak beraspal. Untuk menentukan jumlah, kombinasi, dan penugasan bus untuk pengantaran karyawan terdapat beberapa hal yang perlu diperhatikan, seperti ketersediaan bus, kapasitas, jumlah karyawan, dan tipe bus yang tidak dapat masuk ke beberapa lokasi tambang. Oleh karena itu, dibuat model yang dapat digunakan untuk menentukan jumlah dan kombinasi bis yang sesuai untuk meminimumkan biaya sewa bus dan biaya bahan bakar yang dikeluarkan. Metode yang digunakan untuk mencari solusi dari model yang dibuat adalah integer linear programming dengan algoritma branch and bound. Dalam waktu komputasi 30 menit didapatkan solusi yang baik dengan optimality gap < 1. Hasil dari optimasi dengan 3 skenario menunjukkan penurunan biaya transportasi bus karyawan, masing-masing penurunan sebesar 2,90, 7,24, dan 10,44.

A mining contractor company in East Kalimantan wants to reduce the transportation costs incurred, one of which is the cost of delivering employees to the mine by bus. The use of bus for employee delivery is used for safety aspect considering the unpaved mining road condition. To determine the number, combination, and assignment of buses for employee delivery there are several things to note, such as the availability of buses, capacity, number of employees, and the type of bus that can not enter several mine sites. Therefore, a model can be used to determine the appropriate bus number and combinations to minimize the cost of bus rental and fuel costs incurred. The method used to find the solution of the model is linear integer programming with branch and bound algorithm. In 30 minute computation time, good solution generated with optimality gap of."
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Amsterdam: North-Holland, 1970
529.77 INT
Buku Teks SO  Universitas Indonesia Library
cover
Hu, T.C.
Masschusetts: Addison-Wesley , 1970
519.92 HUT i
Buku Teks SO  Universitas Indonesia Library
cover
Taha, Hamdy A.
Orlando: Academic Press, 1975
519.7 HAM i
Buku Teks SO  Universitas Indonesia Library
cover
Peressini, Anthony L.
New York: Springer-Verlag, 1988
519.76 PER m
Buku Teks SO  Universitas Indonesia Library
cover
William, H.P.
Chichester : John Wiley & Sons, 1978
519.7 WIL m
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>