Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 1275 dokumen yang sesuai dengan query
cover
Attridge, Derek
London: Routledge, 2004
801 ATT s
Buku Teks SO  Universitas Indonesia Library
cover
Nemethi, Andras
"This book targets the challenging non-isolated case. Let f be a complex analytic hypersurface germ in three variables whose zero set has a 1-dimensional singular locus. We develop an explicit procedure and algorithm that describe the boundary M of the Milnor fiber of f as an oriented plumbed 3-manifold. This method also provides the characteristic polynomial of the algebraic monodromy. We then determine the multiplicity system of the open book decomposition of M cut out by the argument of g for any complex analytic germ g such that the pair (f,g) is an ICIS. Moreover, the horizontal and vertical monodromies of the transversal type singularities associated with the singular locus of f and of the ICIS (f,g) are also described. The theory is supported by a substantial amount of examples, including homogeneous and composed singularities and suspensions. The properties peculiar to M are also emphasized."
Berlin: Springer, 2012
e20419787
eBooks  Universitas Indonesia Library
cover
792 U 45
Buku Teks  Universitas Indonesia Library
cover
Andi Muhammad Adam
"ABSTRAK
Breakwater merupakan proyek linear construction projects dengan tipe pekerjaan
berulang (repetitive work activities), namun di Indonesia penjadwalan untuk
pekerjaan repetitive project masih menggunakan penjadwalan konvensional,
khususnya pada proyek breakwater pelabuhan Kalibaru Jakarta. Metode linear
scheduling dengan singularity function diaplikasikan pada pembangunan
breakwater Pelabuhan Kalibaru mengingat metode tersebut mempunyai banyak
kelebihan. Dalam penelitian ini dilakukan analisa terhadap jadwal pelaksanaan
rencana yang memiliki durasi pekerjaan yaitu 485 hari serta terhadap nilai buffer
antar kegiatan. Hasil analisa dengan singularity function menyimpulkan dengan
mengoptimalkan nilai buffer antar kegiatan dapat mengurangi durasi pekerjaan.
Hasil optimal yang didapat adalah durasi pekerjaan 274 hari.

ABSTRACT
Breakwater is a linear construction project with repetitive work activities, but in
Indonesia scheduling for repetitive projects are still using conventional
scheduling, especially in the construction of breakwater project in Kalibaru
Jakarta. Linear scheduling method with singularity function is applied in the
construction of breakwater at the Port of Kalibaru considering the method has
many advantages. In this research, an analysis of the plan implementation
schedule which has duration of 485 days, and an analysis to the value of the buffer
between activities. The results of the singularity function analysis conclude by
optimizing the value of buffers between activities can reduce the duration of the
work. Optimal results are obtained work duration is 274 days."
Fakultas Teknik Universitas Indonesia, 2014
S56325
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sartre, Jean-Paul
London: Routledge classics, 2001
302.224 SAR w
Buku Teks SO  Universitas Indonesia Library
cover
Cambridge, UK: Cambridge University Press, 1984
809.933 84 PHI
Buku Teks SO  Universitas Indonesia Library
cover
Fort Worth: Harcourt, Brace Jovanovics College Publishers, 1985
820.82 INT
Buku Teks SO  Universitas Indonesia Library
cover
Chicago: ST. James Press, 1985
820.9 COM
Buku Teks SO  Universitas Indonesia Library
cover
Felski, Rita
Malden: BlackWell Publishing, 2008
801 FEL u
Buku Teks SO  Universitas Indonesia Library
cover
Lamarque, Peter
Malden: Blackwell Publishing, 2009
801 LAM p
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>