Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 84874 dokumen yang sesuai dengan query
cover
cover
Amien Rahardjo
Depok: Fakultas Teknik Universitas Indonesia,
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Sulasno
Semarang: Satya Wacana, 1993
621.31 Sul a
Buku Teks  Universitas Indonesia Library
cover
Aghnia Nur An Nisa
"Sistem Ereke merupakan sistem kelistrikan di kawasan sisi utara pulau Buton yang masuk wilayah Kabupaten Buton Utara. Namun pola operasi pada sistem Ereke dipasok dari sistem Baubau dan dalam beberapa kondisi dioperasikan secara isolated. Dari pola operasi tersebut, terjadi beberapa kondisi yaitu kualitas tegangan yang buruk akibat letak geografis Ereke dan Baubau terlampau jauh ±199,1 kms, kemudian apabila terjadi padam meluas/padam total (Blackout) proses penormalan pada sistem Ereke membutuhkan waktu yang cukup lama karena kondisi Ereke yang berada di ujung jaringan dan tercatat pada tahun 2021, sistem Ereke mengalami padam total sebanyak 63 kali. Dari hasil analisis diperoleh bahwa apabila menggunakan pola operasi dipasok dari sistem Baubau, maka biaya yang dibutuhkan sebesar Rp 1.159.452.493,9/bulan dengan tegangan pangkal 15,6 kV pada pelanggan serta lamanya pemulihan pasca padam meluas/padam total dan apabila isolated Rp 1.622.262.413,2/bulan dengan tegangan pangkal 19,7 kV namun biaya lebih mahal namun dapat mengurangi lama waktu pemulihan pasca gangguan karena jaringan lebih pendek dan rugi jaringan berkurang. Selain itu, nilai SAIDI pada bulan Mei 2021 yaitu 5,03 jam/pelanggan/tahun dan SAIFI 5,97 kali/pelanggan/tahun. Dengan demikian, pilihan terbaik dalam pengembangan sistem pembangkitan di Ereke adalah dengan membangun sistem Ereke interkoneksi dengan sistem Baubau dengan disertai dengan pembangunan sejumlah penyulang untuk menaikkan kualitas tegangan dan kehandalan sistem Ereke dan menggunakan simulasi pada software DigSilent. Semua analisa mempertimbangkan RUPTL terbaru tahun 2021-2030.

The Ereke system was an electrical system used on the northern Buton island, a part of the North Buton Regency. The operating methods on the Ereke system were the operation method which was supplied from Baubau system and, in some conditions, isolated operation. There were several conditions caused by those operating methods, which were the poor voltage quality due to the geographical distance from Ereke to Baubau that were too far (±199,1 kms) and the long duration of the normalization process if there was a widespread blackout since Ereke was located at end of the network. In addition, the Ereke system experienced a total of 63 outages in 2021. From the analysis result, it was obtained that the operating method which was supplied from the Baubau system will cost Rp. 1,159,452,439.9/month with 15.6 kV base voltage and a long normalization duration after blackout/total blackout. On the other hand, it was also obtained that the isolated operation method will cost Rp. 1,622,262,413.2/month with 19.7 kV base voltage which was more expensive but with a shorter normalization duration after interruptions due to shorter network and the decreased network loss. Otherwise, the SAIDI value in May 2021 is 5.03 hours/customer/year and SAIFI 5.97 times/customer/year Therefore, developing interconnection of Ereke system and Baubau system along with the constructions of feeders to increase the voltage quality and reliability also with the use of DigSilent simulation software will improve the quality of electrical generation development in Ereke. The latest RUPTL (2021-2030) was considered through every analysis."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Amien Rahardjo
Depok: Fakultas Teknik Universitas Indonesia,
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Helmy Said
"ABSTRAK
Tulisan ini mencoba melakukan perkiraan perhitungan ketersediaan suatu system tenaga listrik dan juga mempelajari kebijakan pemeliharaan dalam bentuk perbaikan versus pergantian. Adapun metoda yang digunakan adalah kehandalan median rank, plot kemungkinan, state space, dan kebijakan pemeliharaan berupa perbaikan dan pergantian
Berdasarkan data pengamatan terhadap gangguan dari tahun 1992 sampai dengan 1995, diperoleh bahwa hamper semua komponen berada dalam periode burn in. hal ini mungkin disebabkan data yang berhasil dihimpun belum cukup untuk mewakili keadaan sebenarnya. Tingkat keusangan spare part, prosedur kerja dan sumber daya manusia kurang cakap mungkin merupakan factor-faktor yang mempunyai kontribusi cukup berarti terhadap hasil analisa. Sedangkan berdasarkan hasil analisa kehandalan yang dipakai untuk memperbaiki ketersediaan system menunjukkan bahwa system tenaga listrik yang baru dapat beroperasi pada derajad ketersediaan yang relative tinggi.
Hasil perhitungan menunjukkan bahwa ketersediaan system fungsi dari kapasitas, tahun peralatan mulai beroperasi, konfigurasi system, dan kebijakan pemeliharaan. Sedangkan nilai ketersediaan dimana generator sudah harus diganti dlam melakukan tindk pemeliharaan juga tergantung kepada tahun mulai beroperasi dan kebijakan pemeliharaan yang diambil.
Dari hasil studi ini, yang perlu ditindak lanjuti adalah penentuan batas biaya pemeliharaan maksimum. Agar batas tersebut lebih mendekati kondisi yang sebenarmya, maka sebaiknya factor-faktor biaya bila system diperbaharui, net present value dan pola gangguan yang terjadi pada system, perlu dimasukkan dalam perhitungan.

ABSTRACT
This paper presents a systematic approach to estimating the reliability of an electrical power plant. The study focuses on the live problems of generator in refinery which require high levels of availability for cost-effective operation. The method used includes median rank reliability, probability plotting, state-space method and replacement and repair policy.
Based on failure data from 1992 to 1995, the result indicates that availability of the system is high and factor of capacity, year of installation, and configuration which construct the system correlate to the degree of availability, when the equipment requires replacement depends on initial operating year and the repair setting policy.
"
1998
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Amien Rahardjo
Depok: Fakultas Teknik Universitas Indonesia,
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Uno Bintang Sudibyo
"Suatu sistem pembangkitan daya listrik yang masih sangat baru, menggunakan alternator bertegangan 150 kV bahkan sampai 400 kV, bernama powerformer dengan lilitan kumparan statomya berupa kabel daya tegangan tinggi XLPE (Cross Linked Poly Ethylene) yang dimodiflkasi.
Selama ini, sistem pembangkitan daya listrik menggunakan alternator bertegangan maksimum 30 kV di pembangkit listrik tenaga air atau termal, menaikkan tegangannya sampai 150 kV atau lebih dengan transformator daya penaik tegangan, kemudian mentransmisikannya melalui saluran udara tegangan tinggi atau ekstra tinggi ke pusat - pusat beban.
Karena tegangan keluarannya sudah tinggi pembangkit powerformer tidak memerlukan transformator daya penaik tegangan dan langsung dapat dihubungkan ke saluran udara tegangan tinggi. Dengan peralatan, pekerjaan sipil dan luas tanah lebih sedikit, sistem pembangkit powerformer relatif lebih rendah biaya investasi, operasi dan pemeliharaannya dibandingkan sistem gabungan alternator - transformator daya penaik tegangan.
Studi ini membandingkan secara teknis suatu sistem pembangkit powerformer dan sistem gabungan alternator - transformator daya penaik tegangan 150 kV, 40 MVA untuk pembangkit listrik tenaga air."
Depok: Fakultas Teknik Universitas Indonesia, 2000
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Muhamad Rais
"Seiring dengan pertumbuhan ekonomi dan tingkat populasi penduduk di Indonesia yang semakin tinggi, maka permintaan akan energi listrik juga meningkat. Diperlukan terobosan baru untuk dapat memenuhi kebutuhan listrik, salah satunya pemanfaatan panas buang heat recovery system dari turbin gas yang dapat dimanfaatkan untuk menghasilkan energi listrik dengan sistem ORC. Pada penelitian ini, sistem ORC menggunakan sumber panas dari exhaust turbin gas dengan temperatur rata-rata 350 C. Sistem ORC ini terdiri dari evaporator, turbin, kondensor dan pompa. Panas dari gas buang turbin akan menguapkan fluida kerja, yang kemudian akan menggerakkan turbin sehingga akan menghasilkan listrik pada generator. Fluida kerja dipilih berdasarkan aspek temodinamika, safety dan lingkungan, Pada penelitian ini, fluida kerja yang paling sesuai adalah toluena. Untuk mengetahui jumlah kerja yang dihasilkan dari sistem ORC, disimulasikan dengan software cycle tempo 5.1. Hasilnya sistem ORC mampu menghasilkan energi listrik sebesar 2947,67 kW. Dari analisis keekonomian, sistem ORC akan memberikan keuntungan dengan nilai NPV sebesar USD 979.636, IRR sebesar 15 dan payback period 11,40 tahun. Dari levelized cost ORC didapat harga jual sebesar Rp. 1133/kWh. Apabila dibandingkan antara tarif dasar listrik TDL PLN Gol. Rumah tangga R-1 sebesar Rp. 1472/kWh. Harga listrik yang dihasilkan dari sistem ORC lebih murah Rp. 442/kWh atau sebesar 30 dari harga tarif dasar listrik TDL PLN.

Along with economic growth and the rate of population in Indonesia is higher, the demand for electrical energy is also increasing. The new breakthrough is needed to meet electricity needs, one of which utilization of waste heat heat recovery system of a gas turbine that can be harnessed to generate electricity with ORC system. In this study, ORC systems use a source of heat from the exhaust gas turbine with an average temperature of 350 C. ORC system consists of evaporator, turbine, condenser and pump. The heat from the turbine exhaust gas will evaporate the working fluid, which then drives a turbine that will generate electricity by a generator. Working fluid selection based on thermodynamic aspects, safety and environment. In this study, the most appropriate working fluid is toluene. To determine the amount of work generated from ORC systems, simulated by software cycle tempo 5.1. The result ORC system is able to generate electrical energy by 2947.67 kW. From the economic analysis, the ORC system will provide benefits to the value of USD 979 636 NPV, IRR 15 and a payback period of 11.40 years. Levelized cost of ORC obtained selling price of Rp. 1133 kWh. When compared between the basic electricity tariff TDL PLN Gol. Household R 1 to Rp. 1472 kWh. The price of electricity generated from ORC system is cheaper Rp. 442 kWh or 30 of the price of basic electricity tariff PLN."
Depok: Fakultas Teknik Universitas Indonesia, 2016
T47264
UI - Tesis Membership  Universitas Indonesia Library
cover
Blessmiyanda
"Wilayah perairan Indonesia yang sangat luas berakibat pada besarnya potensi sumberdaya laut yang ada. Sumberdaya ini perlu diupayakan agar penggunaannya memperhatikan daya dukung dan kelestarian, sehingga dapat meningkatkan kesejahteraan masyarakat secara berkelanjutan.
Kebutuhan energi listrik di Indonesia terutama di Pulau Jawa yang berfluktuasi dan cenderung meningkat, diperkirakan dalam periode 1986 - 2010 diperlukan tambahan pembangkit listrik sebesar 26.500 MW. Untuk memenuhi kebutuhan energi tersebut, Pemerintah melalui Perusahaan Listrik Negara merencanakan pembangunan Pembangkit Listrik Tenaga Gas Uap (PLTGU) Muara Tawar yang memiliki kapasitas 2400 MW. PLTGU Muara Tawar yang direncanakan dibangun di atas lahan seluas 39,6512 Ha yang termasuk Desa Segara Jaya dan Desa Pantai Makmur Kecamatan Tarumajaya Kabupaten Bekasi Propinsi Jawa Barat.
Berdasarkan studi Analisis Mengenal Dampak Lingkungan (AMDAL) yang telah dilakukan, jenis kegiatan yang berpotensi menimbulkan dampak pada tahap konstruksi meliputi mobilisasi personil, peralatan dan material, pematangan lahan, pemancangan tiang pondasi dan pembangunan kanal pendingin dan demiaga sementara.
Mengingat aktivitas konstruksi PLTGU ini diperkirakan menimbulkan dampak lingkungan di wilayah pesisir tempat proyek dibangun, maka dilakukan pemantauan pada komponen - komponen lingkungan hidup yang berpotensi menimbulkan dampak. Penelitian lapangan yang dilaksanakan pada tahap konstruksi (Mei 1995 - Mei 1996) meliputi pengamatan dalam bidang Sosial Ekonomi, Kualitas Air Laut, dan Kualitas Udara. Pengamatan ini dilakukan terhadap aspek - aspek dan di lokasi yang diperkirakan mendapatkan dampak langsung dari aktivitas proyek. Hipotesis dari Tesis ini adalah : Konstruksi Proyek PLTGU Muara Tawar akan menimbulkan dampak pada lingkungan pesisir.
Dari penelitian diketahui sebanyak 29,25 % dari total pekerja non skilled diserap dari tenaga local/penduduk disekitar tapak proyek. Penyerapan tenaga kerja lokal ini menyebabkan perubahan lapangan pekerjaan beberapa penduduk yang sebelumnya nelayan menjadi buruh proyek PLTGU. Hasil analisis Statistik menunjukkan tingkat pendapatan penduduk yang bekerja sebagai buruh PLTGU ternyata lebih tinggi bila dibandingkan dengan bekerja sebagai nelayan.
Sebagian besar responden ( 91 %) menyatakan tidak keberatan terhadap keberadaan proyek, karena dipandang memberikan kesempatan kerja dan juga memajukan kesempatan berusaha bagi masyarakat setempat. Responden yang keberatan, berpendapat proyek ini membuat laut menjadi lebih dangkal dan berkurangnya hasil tangkapan udang dari pinggir pantai.
Berdasarkan pengukuran kedalaman yang telah dilakukan, menunjukkan adanya pendangkalan perairan. Pendangkalan ini disebabkan proses sedimentasi yang tinggi yang telah terjadi sebelum adanya proyek PLTGU. Proses sedimentasi terlihat dari kandungan bahan padatan tersuspensi (TSS) yang telah melampaui baku mutu menurut Surat Keputusan Menteri Negara Kependudukan dan Lingkungan Hidup No. 0211/1988. Kandungan TSS terbesar terjadi saat kegiatan pengerukan pantai dan pemancangan tiang pondasi. Hasil analisis statistik menunjukkan ada pengaruh dari pembangunan proyek PLTGU Muara Tawar pada tingginya kandungan TSS di perairan .
Hasil pemantauan kualitas air laut, dijumpai adanya beberapa parameter logam berat yang kandungannya meningkat sejak adanya proyek PLTGU bila dibandingkan dengan kondisi sebelum adanya proyek. Parameter logam berat yang meningkat ini adalah Cd, Ni, dan Pb. Kandungan logam berat ini meningkat sebanding dengan meningkatnya curah hujan dan menurun seiring dengan menurunnya curah hujan. Logam berat ini bukan berasal dari proyek PLTGU tetapi menunjukkan limbah perkotaan yang terbawa aliran sungai masuk ke perairan pantai. Keadaan ini diduga juga dipengaruhi oleh berkurangnya hutan bakau yang tumbuh di pantai. Diketahui bahwa salah satu fungsi dari hutan bakau adalah sebagai penyerap lumpur karena adanya sistim akar yang padat sehingga partikel yang sangat halus mengendap di sekeliling akar bakau membentuk kumpulan lapisan sedimen yang sekali mengendap biasanya tidak dialirkan keluar lagi. Logam berat yang terbawa aliran sungai akan tersaring oleh lumpur hutan bakau sehingga tidak masuk ke perairan pantai, namun jika hutan bakau ini musnah, maka aliran sungai yang mengandung logam berat akan langsung masuk ke perairan pantai. Berdasarkan studi yang dilakukan saat AMDAL dijumpai hutan bakau sebanyak 1500 pohon/ha , namun saat penelitian pada tahap konstruksi ini hutan bakau yang ada tinggal 1135 pohon/ha.
Kandungan debu dan tingkat kebisingan terbesar terjadi di lokasi tapak proyek, kemudian semakin menurun pada daerah sekitar tapak dan nilainya kecil di daerah pemukiman yang jauh dari tapak proyek. Disini terlihat bahwa besarnya curah hujan juga ikut berperan terhadap kandungan debu. Pada saat curah hujan tinggi, kandungan debu rendah. Sedangkan saat curah hujan rendah, kandungan debu tinggi bahkan melampaui baku mutu yang ditetapkan menurut Surat Keputusan Gubernur Jawa Barat No. 660.31/SK1694-BKPMD182.
Persepsi penduduk menunjukkan bahwa mereka yang tinggal di dekat tapak proyek merasa terganggu oleh debu dan kebisingan, sedangkan yang tinggalnya_ jauh dari tapak proyek tidak merasa terganggu. Hasil analisis Statistik menunjukkan adanya pengaruh antara lokasi tempat tinggal penduduk dengan persepsi terhadap gangguan debu, selain itu analisis Statistik menunjukkan bahwa ada pengaruh antara lokasi tempat tinggal penduduk dengan persepsi terhadap gangguan kebisingan.
Secara keseluruhan dapat disimpulkan bahwa konstruksi prayek PLTGU Muara Tawar menimbulkan dampak terhadap lingkungan pesisir.

Impact of the Contstruction of the Power Plant on the Coastal Environment (A Case Study in the Gas-Generated Power Plant at Muara Tawar-Bekasi, West Java)The vast area of Indonesian waters offers a wide variety of natural resources. It is very critical to conserve the use of these resources. The ecosystem along the coastal area is also sensitive due to its natural changes that shape the coastline. There is a steady concern of new development that will endanger the coastal ecosystem. Increasing awareness of the communities of any new development can prevent coastal destruction.
In Java the need of electricity is on the rise. It is estimated that from 1986 to 2010 as much as 26.500 MW is needed. Indonesia is building a gas-generated power plant (Perusahaan Listrik Tenaga Gas Uap or PLTGU) in Muara Tawar with a capacity of 2.400 MW. This plant is constructed on a 396,512 ha land in East Java.
Based on the environmental impact assessment (Analysis Mengenai Dampak Lingkungan or AMDAL) the development of this power plant will affect on the coastal ecosystem and environment. This study was conducted to investigate the impacts of PLTGU on water and air quality, and social economy of the coastal community.
The levels of some heavy metals such as Cd, N, and Pb, have increased since the development of the power plant. It was suspected that the heavy metals originated from the city sewage rather than from the PLTGU. Naturally the mangroves filter these heavy metals. However, the density of mangrove has declined from 1,500 trees/ha to 1,135 trees/ha after the PLTGU project was developed. It was noted that the levels of these heavy metals increased with the increasing amount of rainfall.
Project PLTGU also has affected the noise intensity and dust density around the area. It was found that the dust density and amount of rainfall are inversely related. When there was a high amount of rainfall, the dust density was low, and vice versa. Local communities around the project were greatly affected by the amount of dust and noise intensity. Statistics showed the impact of the dust density problem and of the noise intensity on the residential sites.
It was found that 29.25% of the local non-skilled workers who were fishermen have now become power plant workers. Power plant workers tend to have higher income than the fishermen. Individuals (91%) who are in favor of the power plant project consider that the plant will result in a higher employment rate. However, others feel that the plant will cause sedimentation and reduction in the ocean harvest. Sedimentation due to total suspended solids (TSS) has occurred even before the plant started and its rate will continue to increase as the plant developed.
In conclusion, the development of PLTGU Muara Tawar will impact on its coastal environment.
"
Depok: Program Pascasarjana Universitas Indonesia, 1997
T983
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>