UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Pengembangan Model Smart Contract Pada Pengajuan Pembayaran Pembangunan Kawasan Aerotropolis Berbasis Kerjasama Pemerintah Badan Usaha (KPBU) = Development of Smart Contract Model In Submission Of Payment To Build Aerotropolis Urban Region Based On Public-Private Partnership Scheme

Muhammad; Mohammed Ali Berawi, supervisor; Ayomi Dita Rarasati, examiner; Leni Sagita Riantini, examiner (Fakultas Teknik Universitas Indonesia, 2021)

 Abstrak

Pengembangan kota berbasis bandara atau aetropolis yang dilakukan oleh pemerintah yang dilakukan pemerintah membutuhkan dana investasi yang besar sehingga dibutuhkan peran swasta dalam menginisiasi proyek tersebut. Proyek kerjasama antara pemerintah dan pihak swasta disebut dengan Kerjasama Pemerintah Badan Usaha (KPBU). KPBU memiliki keunikan dari segi bentuk kerjasama karena melibatkan pihak yang memiliki kepentingan berbeda. Penelitian pengembangan model smart contract pada peneilitan ini didasarkan pada masalah yang terjadi akibat dari banyaknya pihak yang terlibat dalam proyek pengembangan kawasan aetropolis yang menggunakan skema kerjasama pemerintah dan badan usaha (KPBU). Critical success factor dalam pengajuan pembayaran dalam pengembangan kawasan aerotropolis dengan skema KPBU menjadi sesuatu yang penting. Pengembangan model smart contracts yang dapat diaplikasikan pada pengembangan kawasan Aetrotopolis dengan skema KPBU.

The development of an airport or aetropolis-based city carried out by the government by the government requires a large investment fund so that the role of the private sector is needed in initiating the project. The joint project between the government and the private sector is called the Public Private Partnership (PPP). PPP is unique in terms of the form of cooperation because it involves parties who have different interests. Research on the development of a smart contract model in this research is based on problems that occur as a result of the many parties involved in the aetropolis area development project using a government-business entity (PPP) cooperation scheme. Critical success factors in submitting payments for developing aerotropolis areas with a PPP scheme are important. Development of a smart contract model that can be applied to the development of the Aetrotopolis area with a PPP scheme.

 File Digital: 1

Shelf
 S-Muhammad.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S-pdf
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Entri tambahan-Nama badan :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2021
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : computer
Tipe Carrier : online resource
Deskripsi Fisik : vi, 82 pages + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S-pdf 14-25-64471874 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 9999920559124
Cover