Stakeholder manajemen pada proyek design and build untuk mengurangi costruction waste berbasis PMBOK, studi kasus: Bandara XYZ = Stakeholder management on design and build project to reduce construction waste based on PMBOK case study: XYZ airport
Rizki Yunita Sari;
Yusuf Latief, supervisor; Afrizal Nursin, supervisor; Eddy Subiyanto, examiner; Setyo Supriyadi Supadi, examiner; Leni Sagita Riantini, examiner
(Fakultas Teknik Universitas Indonesia, 2016)
|
|
| Jenis Koleksi : | UI - Tesis Membership |
| No. Panggil : | T46198 |
| Entri utama-Nama orang : | |
| Entri tambahan-Nama orang : | |
| Program Studi : | |
| Subjek : | |
| Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2016 |
| Bahasa : | ind |
| Sumber Pengatalogan : | LibUI ind rda |
| Tipe Konten : | text |
| Tipe Media : | unmediated ; computer (rdadontent) |
| Tipe Carrier : | volume ; online resource |
| Deskripsi Fisik : | xvi, 188 pages : illustration ; 28 cm + appendix |
| Naskah Ringkas : | |
| Lembaga Pemilik : | Universitas Indonesia |
| Lokasi : | Perpustakaan UI, Lantai 3 |
| No. Panggil | No. Barkod | Ketersediaan |
|---|---|---|
| T46198 | 15-18-592542440 | TERSEDIA |
| Ulasan: |
| Tidak ada ulasan pada koleksi ini: 20433828 |