Aplikasi penjadwalan linear scheduling dengan metode varying production rates pada proyek pembangunan breakwater di pelabuhan Kalibaru = Application of linear scheduling method with varying production rates at breakwater construction project in port of Kalibaru
Ledi Khalidannisa;
Yusuf Latief, supervisor; Rully Andhika, supervisor; Setyo Supriyadi Supadi, examiner; Petroceany, Jade Sjafrecia, examiner
(Fakultas Teknik Universitas Indonesia, 2014)
|
|
| Jenis Koleksi : | UI - Skripsi Membership |
| No. Panggil : | S54905 |
| Entri utama-Nama orang : | |
| Entri tambahan-Nama orang : | |
| Entri tambahan-Nama badan : | |
| Program Studi : | |
| Subjek : | |
| Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2014 |
| Bahasa : | ind |
| Sumber Pengatalogan : | LibUI ind rda |
| Tipe Konten : | text |
| Tipe Media : | unmediated ; Computer (rdadontent) |
| Tipe Carrier : | volume ; online resource |
| Deskripsi Fisik : | xix, 203 pages : illustration ; 28 cm + appendix |
| Naskah Ringkas : | |
| Lembaga Pemilik : | Universitas Indonesia |
| Lokasi : | Perpustakaan UI, Lantai 3 |
| No. Panggil | No. Barkod | Ketersediaan |
|---|---|---|
| S54905 | 14-24-14680783 | TERSEDIA |
| Ulasan: |
| Tidak ada ulasan pada koleksi ini: 20386629 |